Data analysis results of DauThau.info software for bid solicitors Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình as follows:
- Has relationships with 29 contractor.
- Announced 34 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 18 contractor selection plans with a total of 35 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 88 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 84 packages with results that do not have tender notice or prequalification notice.
- There are 1 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0.67 contractors.
- Breakdown by bidding field: Goods 60.00%, Construction 0%, Consultancy 40.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 20,328,893,000 VND, of which the total winning bid value is: 19,967,762,000 VND.
- The savings rate is: 1.78%.
Data analysis results of DauThau.info software for bid solicitors Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình as follows:
- Has relationships with 29 contractor.
- The average number of contractors participating in each bidding package is: 0.67 contractors.
- Proportion of bidding fields: Goods 60.00%, Construction 0%, Consulting 40.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 20,328,893,000 VND, in which the total winning value is: 19,967,762,000 VND.
- The savings rate is: 1.78%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 34 investment and development projects.
- As the owner of 35 Contractor selection plan in which 18 Contractor selection plan is self-published, and 17 Contractor selection plan is posted by other units.
- Being the investor of 23 bidding packages in which 5 packages are self-invited, and 18 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình Posted Development Investment Project The project of building essential infrastructure for the center of plant varieties, livestock, and hi-tech agricultural production in Ninh Binh province, phase 1.
29/07/2022 07:00
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Making project for leasing forest environment services in Ninh Binh province of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
- Winning bidder: Trung tâm Tài nguyên và Môi trường Lâm nghiệp
28/07/2022 14:36
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction supervision consultancy of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:14
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction and equipment installation of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:12
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:03
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction supervision consultancy of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:56
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction and equipment installation of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:48
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:35
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:23
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Making project for leasing forest environment services in Ninh Binh province .
- Winning bidder: Trung tâm Tài nguyên và Môi trường Lâm nghiệp
28/07/2022 14:36
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction supervision consultancy .
- Winning bidder: Công ty TNHH Xây dựng và Thương mại Đức Nhật
27/07/2022 10:14
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction and equipment installation .
- Winning bidder: Công ty TNHH Trường Vũ Ninh Bình
27/07/2022 10:12
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Consulting, surveying, making economic - technical reports .
- Winning bidder: Trung tâm Tư vấn Xây dựng nông nghiệp và phát triển nông thôn Ninh Bình
27/07/2022 10:03
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction supervision consultancy .
- Winning bidder: Công ty Cổ phần Xây dựng và Thương mại Minh Tú
27/07/2022 09:56
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction and equipment installation .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG AN TÚ NINH BÌNH
27/07/2022 09:48
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Consulting, surveying, making economic - technical reports .
- Winning bidder: Trung tâm Tư vấn Xây dựng nông nghiệp và phát triển nông thôn Ninh Bình
27/07/2022 09:35
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Đầu tư xây dựng Xuân Cương
27/07/2022 09:23
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG GIANG
27/07/2022 09:16
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình announced the results of the bid package Consultancy on design verification - project costing .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG GIANG
27/07/2022 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình Posted Development Investment Project The project of building essential infrastructure for the center of plant varieties, livestock, and hi-tech agricultural production in Ninh Binh province, phase 1.
29/07/2022 07:00
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Making project for leasing forest environment services in Ninh Binh province of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
- Winning bidder: Trung tâm Tài nguyên và Môi trường Lâm nghiệp
28/07/2022 14:36
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction supervision consultancy of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:14
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction and equipment installation of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:12
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 10:03
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction supervision consultancy of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:56
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction and equipment installation of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:48
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:35
The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted the results of the bidding package Construction of the investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình.
27/07/2022 09:23
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted 18 of the contractor selection plan, which contains 35 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted 5 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has posted 88 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 88 package, canceled the bid 0 package (among the bidding packages above).
- There are 84 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has a relationship with 29 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình has a relationship with 5 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình is the investor of 23 package, of which 5 package is self-invited, other units invite bid 18 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình is the owner of 35 contractor selection plan. In which, they self-invite 18 of contractor selection plan, other units invite bids of 17 of contractor selection plan.
Summary: Investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình is an investor with 36 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và phát triển nông thôn tỉnh Ninh Bình is the investor of 34 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code