Data analysis results of DauThau.info software for bid solicitors Sở Nông nghiệp và PTNT Hà Nội as follows:
- Has relationships with 72 contractor.
- Announced 252 investment development project, of which 14 projects have not yet announced the prequalification documents.
- Announced 226 contractor selection plans with a total of 554 bidding packages, of which 101 prequalification documents have not found the investment project.
- Has invited bids for 80 packages (with 85 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 86 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 22 packages with results that do not have tender notice or prequalification notice.
- There are 314 packages that have not fully posted the contractor selection results. Of these 233 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.80 contractors.
- Breakdown by bidding field: Goods 48.24%, Construction 3.53%, Consultancy 14.12%, Non-consultancy 34.12%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 209,523,935,110 VND, of which the total winning bid value is: 208,778,261,425 VND.
- The savings rate is: 0.36%.
Data analysis results of DauThau.info software for bid solicitors Sở Nông nghiệp và PTNT Hà Nội as follows:
- Has relationships with 72 contractor.
- The average number of contractors participating in each bidding package is: 1.80 contractors.
- Proportion of bidding fields: Goods 48.24%, Construction 3.53%, Consulting 14.12%, Non-consulting 34.12%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 209,523,935,110 VND, in which the total winning value is: 208,778,261,425 VND.
- The savings rate is: 0.36%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 252 investment and development projects.
- As the owner of 622 Contractor selection plan in which 226 Contractor selection plan is self-published, and 396 Contractor selection plan is posted by other units.
- Being the investor of 393 bidding packages in which 64 packages are self-invited, and 329 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing Phong Van embankment corresponding to K3+850 to K4+200 Huu Hong dike in Co Do commune, Phong Van commune, Ba Vi district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
16/10/2024 16:31
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing Thinh Lien embankment, left Duong section from K20 + 725 - K21 + 367 and K21 + 900 - K22 + 458, located in Trung Mau commune, Gia Lam district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
16/10/2024 16:08
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Approving the Contractor Selection Plan for the project preparation phase Project: Repairing facilities at Hanoi Agricultural Development Center
in Phu Lam ward, Ha Dong district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
11/10/2024 07:35
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing Phu Chau embankment corresponding to K18+500 to K18+800 Huu Hong dike, Phu Chau commune, Ba Vi district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 18:53
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the Day Dam work area and factory; Repairing the yard of Day Dam management area, Dan Phuong district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
10/10/2024 16:01
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 09:56
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 09:08
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing slope to Huu Hong dike, Ba Vi district at locations K5+050 downstream; K6+400 downstream; K12+750 upstream; K13+550 upstream; K20+550 downstream; K22+730 upstream of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
05/10/2024 15:23
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing the operating house for production and some auxiliary items at the Livestock and Aquaculture Experimental Station in Thanh Thuy commune, Thanh Oai district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
05/10/2024 15:07
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for the project preparation phase Project: Repairing the Headquarters of the Department of Livestock, Fisheries and Veterinary Medicine of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
05/10/2024 14:51
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Repairing Phong Van embankment corresponding to K3+850 to K4+200 Huu Hong dike in Co Do commune, Phong Van commune, Ba Vi district with 2 bidding package .
16/10/2024 16:31
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Repairing Thinh Lien embankment, left Duong section from K20 + 725 - K21 + 367 and K21 + 900 - K22 + 458, located in Trung Mau commune, Gia Lam district with 3 bidding package .
16/10/2024 16:08
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Approving the Contractor Selection Plan for the project preparation phase Project: Repairing facilities at Hanoi Agricultural Development Center
in Phu Lam ward, Ha Dong district with 3 bidding package .
11/10/2024 07:35
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Contractor selection plan for project preparation phase Project: Repairing Phu Chau embankment corresponding to K18+500 to K18+800 Huu Hong dike, Phu Chau commune, Ba Vi district with 3 bidding package .
10/10/2024 18:53
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Repairing the Day Dam work area and factory; Repairing the yard of Day Dam management area, Dan Phuong district with 2 bidding package .
10/10/2024 16:01
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai with 3 bidding package .
10/10/2024 09:56
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai with 3 bidding package .
10/10/2024 09:08
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Contractor selection plan for project preparation phase Project: Repairing slope to Huu Hong dike, Ba Vi district at locations K5+050 downstream; K6+400 downstream; K12+750 upstream; K13+550 upstream; K20+550 downstream; K22+730 upstream with 2 bidding package .
05/10/2024 15:23
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Contractor selection plan for project preparation phase Project: Repairing the operating house for production and some auxiliary items at the Livestock and Aquaculture Experimental Station in Thanh Thuy commune, Thanh Oai district with 2 bidding package .
05/10/2024 15:07
Sở Nông nghiệp và PTNT Hà Nội publishes the plan Contractor selection plan for the project preparation phase Project: Repairing the Headquarters of the Department of Livestock, Fisheries and Veterinary Medicine with 3 bidding package .
05/10/2024 14:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing Phong Van embankment corresponding to K3+850 to K4+200 Huu Hong dike in Co Do commune, Phong Van commune, Ba Vi district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
16/10/2024 16:31
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing Thinh Lien embankment, left Duong section from K20 + 725 - K21 + 367 and K21 + 900 - K22 + 458, located in Trung Mau commune, Gia Lam district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
16/10/2024 16:08
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Approving the Contractor Selection Plan for the project preparation phase Project: Repairing facilities at Hanoi Agricultural Development Center
in Phu Lam ward, Ha Dong district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
11/10/2024 07:35
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing Phu Chau embankment corresponding to K18+500 to K18+800 Huu Hong dike, Phu Chau commune, Ba Vi district of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 18:53
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the Day Dam work area and factory; Repairing the yard of Day Dam management area, Dan Phuong district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
10/10/2024 16:01
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 09:56
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Repairing the headquarters of the Department of Crop Production and Plant Protection in Thanh Oai of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
10/10/2024 09:08
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing slope to Huu Hong dike, Ba Vi district at locations K5+050 downstream; K6+400 downstream; K12+750 upstream; K13+550 upstream; K20+550 downstream; K22+730 upstream of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
05/10/2024 15:23
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for project preparation phase Project: Repairing the operating house for production and some auxiliary items at the Livestock and Aquaculture Experimental Station in Thanh Thuy commune, Thanh Oai district of the investor Sở Nông nghiệp và PTNT Hà Nội with 2 bidding package.
05/10/2024 15:07
The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted the request Contractor selection plan for the project preparation phase Project: Repairing the Headquarters of the Department of Livestock, Fisheries and Veterinary Medicine of the investor Sở Nông nghiệp và PTNT Hà Nội with 3 bidding package.
05/10/2024 14:51
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Nông nghiệp và PTNT Hà Nội has posted 226 of the contractor selection plan, which contains 554 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted 85 Tender Notice in the 80 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has posted 86 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 86 package, canceled the bid 0 package (among the bidding packages above).
- There are 22 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Nông nghiệp và PTNT Hà Nội has a relationship with 72 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và PTNT Hà Nội has a relationship with 25 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và PTNT Hà Nội is the investor of 393 package, of which 64 package is self-invited, other units invite bid 329 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và PTNT Hà Nội is the owner of 622 contractor selection plan. In which, they self-invite 226 of contractor selection plan, other units invite bids of 396 of contractor selection plan.
Summary: Investor Sở Nông nghiệp và PTNT Hà Nội is an investor with 205 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Nông nghiệp và PTNT Hà Nội is the investor of 252 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!