Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Nam Dinh Department of Construction as follows:
- Has relationships with 2 project owners.
- Has relationships with 31 contractor.
- Announced 42 investment development project, of which 26 projects have not yet announced the prequalification documents.
- Announced 54 contractor selection plans with a total of 88 bidding packages, of which 33 prequalification documents have not found the investment project.
- Has invited bids for 29 packages (with 30 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 47 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 24 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 28 packages that have not fully posted the contractor selection results. Of these 27 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 13.33%, Construction 16.67%, Consultancy 66.67%, Non-consultancy 0%, Mixed 0%, Other fields 3.33%.
- The total value according to the packages with valid contractor selection results is: 64,334,433,438 VND, of which the total winning bid value is: 63,726,330,002 VND.
- The savings rate is: 0.95%.
Data analysis results of DauThau.info software for bid solicitors Nam Dinh Department of Construction as follows:
- Has relationships with 31 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 13.33%, Construction 16.67%, Consulting 66.67%, Non-consulting 0%, Mixed 0%, Other 3.33%.
- The total value according to the bidding package with valid IMP is: 64,334,433,438 VND, in which the total winning value is: 63,726,330,002 VND.
- The savings rate is: 0.95%.
This Bid solicitor is also an investor. The analysis results of data for the investor Nam Dinh Department of Construction are as follows:
- Is the investor of 42 development investment projects.
- Is the investor of 50 contractor selection plans, of which 49 were self-published, and 1 were published by other entities.
- Is the investor of 35 Tender Notices, of which 21 were self-invited, and 14 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý bảo trì kết cấu hạ tầng giao thông Nam Định has posted the results of the bidding package Civil Works of the investor Nam Dinh Department of Construction.
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
28/06/2025 08:47
Investor Nam Dinh Department of Construction has posted an investment and development project Clothing and repairing the bridge head: Bridge No. 3; Bridge No. 4; Bridge No. 5; Bridge No. 7; Bridge No. 8; Bridge No. 9; Bridge No. 10 on DT.489C.
19/06/2025 09:09
Investor Nam Dinh Department of Construction has posted an investment and development project Claw and repair the roads of the bridge: Ong Dong Bridge; key bridge; Raw goods bridge; demand; Tau bridge 1; Tau 2 bridge; Tau 3 bridge and repair and replacement of Lam Lam bridge expansion on DT.489B.
19/06/2025 08:08
Investor Nam Dinh Department of Construction has posted an investment and development project Taluy roof embankment and roadside reinforcement from km28+574-km29+280; Km31+450-Km31+515; Km32+239.56-Km32+400 (P) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from Km6+100 - Km6+520 (P); Km6+300 - Km6+520 (T); Km7+350 - Km7+600 (T); Km7+600 - Km8+00 (P); Km9+00 - Km9+530 (P); Km11+530 -KM11+850 (P) on DT.485.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Taluy roof embankment and roadside reinforcement from km28+574-km29+280; Km31+450-Km31+515; Km32+239.56-Km32+400 (P) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from Km6+100 - Km6+520 (P); Km6+300 - Km6+520 (T); Km7+350 - Km7+600 (T); Km7+600 - Km8+00 (P); Km9+00 - Km9+530 (P); Km11+530 -KM11+850 (P) on DT.485.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from km19+950 to km21+650 (p) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repair damage to the background, road surface from km0+200 - km1+100, km1+430 - km1+750, km2+250 - km2+480, repair high bridge expansion slots on DT.489b.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing damage to the background, road surface of the segments of km3+300 - km3+860; Km33+00 - Km33+900; Km38+200 - Km38+525 on DT.489.
19/06/2025 07:07
The data sheet has been partially hidden, to see the full information please Login or Register
Nam Dinh Department of Construction publishes the plan Surveying consultancy, preparing a feasibility study report on the renovation and upgrading of An Cuong route (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district) with 1 bidding package .
23/05/2025 15:14
Nam Dinh Department of Construction publishes the plan Consulting survey, making feasibility study report with 1 bidding package .
23/05/2025 15:03
Nam Dinh Department of Construction announced the results of the bid package Construction and installation of construction equipment .
- Winning bidder: NAM HAI INVESTMENT CONSTRUCTION AND TRADING JOINT STOCK COMPANY
16/05/2025 16:07
Nam Dinh Department of Construction announced the results of the bid package Construction supervision consultancy and construction equipment installation .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng tỉnh Nam Định
07/05/2025 14:38
Nam Dinh Department of Construction announced the results of the bid package Construction insurance .
- Winning bidder: Công ty bảo hiểm bưu điện Nam Định
07/05/2025 14:34
Nam Dinh Department of Construction announced the results of the bidding package Construction and installation of construction equipment with 1 participating contractors .
05/05/2025 08:31
Nam Dinh Department of Construction publishes Tender Notice Construction and installation of construction equipment in the form Open bidding .
25/04/2025 09:05
Nam Dinh Department of Construction publishes the plan Survey consultancy, project feasibility study report: Building and renovating the provincial branch route 489 section from Giao An dike (DT.489) to Xuan Thuy National Park, Giao Thuy District with 1 bidding package .
24/04/2025 14:55
Nam Dinh Department of Construction announced the results of the bid package Consulting on appraisal of documents, appraisal of LCNT . results .
- Winning bidder: 236 TRADE AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
23/04/2025 14:35
Nam Dinh Department of Construction announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: T.T.N CONSULTANT CONSTRUCTION COMPANY LIMITED
22/04/2025 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý bảo trì kết cấu hạ tầng giao thông Nam Định has posted the results of the bidding package Civil Works of the investor Nam Dinh Department of Construction.
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
28/06/2025 08:47
Investor Nam Dinh Department of Construction has posted an investment and development project Clothing and repairing the bridge head: Bridge No. 3; Bridge No. 4; Bridge No. 5; Bridge No. 7; Bridge No. 8; Bridge No. 9; Bridge No. 10 on DT.489C.
19/06/2025 09:09
Investor Nam Dinh Department of Construction has posted an investment and development project Claw and repair the roads of the bridge: Ong Dong Bridge; key bridge; Raw goods bridge; demand; Tau bridge 1; Tau 2 bridge; Tau 3 bridge and repair and replacement of Lam Lam bridge expansion on DT.489B.
19/06/2025 08:08
Investor Nam Dinh Department of Construction has posted an investment and development project Taluy roof embankment and roadside reinforcement from km28+574-km29+280; Km31+450-Km31+515; Km32+239.56-Km32+400 (P) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from Km6+100 - Km6+520 (P); Km6+300 - Km6+520 (T); Km7+350 - Km7+600 (T); Km7+600 - Km8+00 (P); Km9+00 - Km9+530 (P); Km11+530 -KM11+850 (P) on DT.485.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Taluy roof embankment and roadside reinforcement from km28+574-km29+280; Km31+450-Km31+515; Km32+239.56-Km32+400 (P) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from Km6+100 - Km6+520 (P); Km6+300 - Km6+520 (T); Km7+350 - Km7+600 (T); Km7+600 - Km8+00 (P); Km9+00 - Km9+530 (P); Km11+530 -KM11+850 (P) on DT.485.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing and supplementing the drainage groove system from km19+950 to km21+650 (p) on DT.489.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repair damage to the background, road surface from km0+200 - km1+100, km1+430 - km1+750, km2+250 - km2+480, repair high bridge expansion slots on DT.489b.
19/06/2025 07:07
Investor Nam Dinh Department of Construction has posted an investment and development project Repairing damage to the background, road surface of the segments of km3+300 - km3+860; Km33+00 - Km33+900; Km38+200 - Km38+525 on DT.489.
19/06/2025 07:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Nam Dinh Department of Construction has posted 54 of the contractor selection plan, which contains 88 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Nam Dinh Department of Construction has posted 30 Tender Notices in 29 bidding packages. Among these, 26 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Nam Dinh Department of Construction has posted 47 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 47 package, canceled the bid 0 package (among the bidding packages above).
- There are 24 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Nam Dinh Department of Construction has a relationship with 31 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Nam Dinh Department of Construction has a relationship with 7 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Nam Dinh Department of Construction has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects