Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Ninh Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 123 contractor.
- Announced 77 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 162 contractor selection plans with a total of 286 bidding packages, of which 80 prequalification documents have not found the investment project.
- Has invited bids for 33 packages (with 37 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 173 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 143 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 83 packages that have not fully posted the contractor selection results. Of these 82 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.31 contractors.
- Breakdown by bidding field: Goods 5.41%, Construction 10.81%, Consultancy 81.08%, Non-consultancy 2.70%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 75,522,511,739 VND, of which the total winning bid value is: 73,913,045,072 VND.
- The savings rate is: 2.13%.
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Ninh Bình as follows:
- Has relationships with 123 contractor.
- The average number of contractors participating in each bidding package is: 1.31 contractors.
- Proportion of bidding fields: Goods 5.41%, Construction 10.81%, Consulting 81.08%, Non-consulting 2.70%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 75,522,511,739 VND, in which the total winning value is: 73,913,045,072 VND.
- The savings rate is: 2.13%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Xây dựng tỉnh Ninh Bình are as follows:
- Is the investor of 77 development investment projects.
- Is the investor of 202 contractor selection plans, of which 154 were self-published, and 48 were published by other entities.
- Is the investor of 98 Tender Notices, of which 36 were self-invited, and 62 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Sở Xây dựng tỉnh Ninh Bình publishes the plan Invest in building DT.482 road connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh province with 1 bidding package .
06/01/2026 14:24
Investor Sở Xây dựng tỉnh Ninh Bình has posted an investment and development project Invest in building DT.482 road connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh province.
06/01/2026 14:14
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Consulting on surveys and preparing a Feasibility Study Report for the project to renovate and upgrade An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district) .
- Winning bidder: Công ty cổ phần tư vấn thiết kế Đông Á
26/12/2025 15:10
Sở Xây dựng tỉnh Ninh Bình publishes the plan Approve the adjustment of the contractor selection plan Package: Survey consulting, prepare a feasibility study report for the project Renovating and upgrading An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district) with 1 bidding package .
26/12/2025 14:48
Investor Sở Xây dựng tỉnh Ninh Bình has posted an investment and development project Consulting on surveys, preparing feasibility study reports for the project: Renovating and upgrading An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district).
26/12/2025 14:14
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 9: Construction insurance .
- Winning bidder: BaoViet Insurance Corporation
26/12/2025 10:25
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 06: Consulting on static compression piles .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng
26/12/2025 10:17
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 04: Supervision of construction and installation of equipment .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng Nam Định
26/12/2025 10:04
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Construction work to repair damage to the Tan De bridge transformer station on National Highway 10, Ninh Binh province due to the impact of storm No. 3 of 2024 (typhoon Yagi) and circulation after the storm .
- Winning bidder: ATH POWER DEVELOPMENT JOINT STOCK COMPANY
24/12/2025 08:50
Sở Xây dựng tỉnh Ninh Bình publishes Tender Notice Establish a set of unit prices for houses and architectural objects in Ninh Binh province in the form Open bidding .
22/12/2025 16:49
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Advice on making environmental registration reports .
- Winning bidder: ENVIRONMENTAL AND TECHNICAL VIEW JOIN STOCK COMPANY
17/11/2025 21:31
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package FPF Verification Consulting .
- Winning bidder: HUY HOANG ELECTRICS AND PCCC COMPANY LIMITED
17/11/2025 21:27
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package E -commerce verification consultant .
- Winning bidder: Institute of Construction Economics
17/11/2025 21:26
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 02: Supervision of construction works .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI NAM VIỆT
23/10/2025 15:11
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ KIẾN TRÚC XÂY DỰNG HÀ NAM
16/10/2025 08:13
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Construction supervision .
- Winning bidder: HP LAND INVESTMENT AND BUILDING JOINT STOCK COMPANY
14/10/2025 13:58
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: HP CONTRUCTION CONSULTANTS INVESTMENT COMPANY LIMITED
09/10/2025 15:36
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Testing and setting up maintenance process .
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
07/10/2025 16:03
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Supervision consultancy .
- Winning bidder: phu thinh trade and consultant construction company limited
27/09/2025 10:31
Sở Xây dựng tỉnh Ninh Bình publishes the plan Testing and setting up maintenance process with 2 bidding package .
27/09/2025 10:27
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng tỉnh Ninh Bình publishes the plan Invest in building DT.482 road connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh province with 1 bidding package .
06/01/2026 14:24
Investor Sở Xây dựng tỉnh Ninh Bình has posted an investment and development project Invest in building DT.482 road connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh province.
06/01/2026 14:14
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Consulting on surveys and preparing a Feasibility Study Report for the project to renovate and upgrade An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district) .
- Winning bidder: Công ty cổ phần tư vấn thiết kế Đông Á
26/12/2025 15:10
Sở Xây dựng tỉnh Ninh Bình publishes the plan Approve the adjustment of the contractor selection plan Package: Survey consulting, prepare a feasibility study report for the project Renovating and upgrading An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district) with 1 bidding package .
26/12/2025 14:48
Investor Sở Xây dựng tỉnh Ninh Bình has posted an investment and development project Consulting on surveys, preparing feasibility study reports for the project: Renovating and upgrading An Cuong road (connecting Hai An commune, Hai Hau district and Ninh Cuong town, Truc Ninh district).
26/12/2025 14:14
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 9: Construction insurance .
- Winning bidder: BaoViet Insurance Corporation
26/12/2025 10:25
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 06: Consulting on static compression piles .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng
26/12/2025 10:17
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Package 04: Supervision of construction and installation of equipment .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng Nam Định
26/12/2025 10:04
Sở Xây dựng tỉnh Ninh Bình announced the results of the bid package Construction work to repair damage to the Tan De bridge transformer station on National Highway 10, Ninh Binh province due to the impact of storm No. 3 of 2024 (typhoon Yagi) and circulation after the storm .
- Winning bidder: ATH POWER DEVELOPMENT JOINT STOCK COMPANY
24/12/2025 08:50
Sở Xây dựng tỉnh Ninh Bình publishes Tender Notice Establish a set of unit prices for houses and architectural objects in Ninh Binh province in the form Open bidding .
22/12/2025 16:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Xây dựng tỉnh Ninh Bình has posted 162 of the contractor selection plan, which contains 286 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Xây dựng tỉnh Ninh Bình has posted 37 Tender Notices in 33 bidding packages. Among these, 33 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng tỉnh Ninh Bình has posted 173 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 173 package, canceled the bid 0 package (among the bidding packages above).
- There are 143 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Xây dựng tỉnh Ninh Bình has a relationship with 123 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng tỉnh Ninh Bình has a relationship with 18 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Xây dựng tỉnh Ninh Bình has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects