Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors SONG CAM SHIPBUILDING JOINT STOCK COMPANY as follows:
- Has relationships with 16 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 33 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 27 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 22 packages with results that do not have tender notice or prequalification notice.
- There are 11 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.40 contractors.
- Breakdown by bidding field: Goods 22.22%, Construction 66.67%, Consultancy 11.11%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 37,044,753,046 VND, of which the total winning bid value is: 35,442,310,423 VND.
- The savings rate is: 4.33%.
Data analysis results of DauThau.info software for bid solicitors SONG CAM SHIPBUILDING JOINT STOCK COMPANY as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 1.40 contractors.
- Proportion of bidding fields: Goods 22.22%, Construction 66.67%, Consulting 11.11%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 37,044,753,046 VND, in which the total winning value is: 35,442,310,423 VND.
- The savings rate is: 4.33%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 9 Contractor selection plan in which 8 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 4 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Undefined (3)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
23/09/2024 16:30
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH TUYẾT NGA
30/08/2024 09:36
Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted Tender Notice ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with the form Open bidding.
10/08/2024 09:09
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.02-Appraisal of Bidding Documents, LCNT results via national bidding network for package Preparation of feasibility study report for Investment project to build and complete ship building No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
31/07/2024 15:15
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.01-Prepare Bidding Documents, evaluate Bidding Documents through the national bidding network for bidding package Prepare feasibility study report for Investment Project to build Stadium and ship completion No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
31/07/2024 15:07
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the request Plan to select contractors for a number of consulting packages for the investment preparation phase of construction of the Ship Building and Completion Project No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with 4 bidding package.
30/07/2024 10:42
Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted Tender Notice TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with the form Open bidding.
24/07/2024 16:29
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.02-Appraisal of bidding documents, LCNT results via national bidding network for equipment procurement package "01 200T forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
17/07/2024 16:10
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.01-Prepare bidding documents, evaluate bidding documents via national bidding network for equipment procurement package "01 200T total forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
17/07/2024 15:05
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the request Plan for selecting contractors for the item: Investment in purchasing equipment "01 200T total forklift" to serve the Company's production of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with 4 bidding package.
13/07/2024 15:57
The data sheet has been partially hidden, to see the full information please Login or Register
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 .
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
23/09/2024 16:30
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" .
- Winning bidder: CÔNG TY TNHH TUYẾT NGA
30/08/2024 09:36
SONG CAM SHIPBUILDING JOINT STOCK COMPANY publishes Tender Notice ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 in the form Open bidding .
10/08/2024 09:09
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package ND&HTT.02-Appraisal of Bidding Documents, LCNT results via national bidding network for package Preparation of feasibility study report for Investment project to build and complete ship building No. 2 .
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
31/07/2024 15:15
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package ND&HTT.01-Prepare Bidding Documents, evaluate Bidding Documents through the national bidding network for bidding package Prepare feasibility study report for Investment Project to build Stadium and ship completion No. 2 .
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
31/07/2024 15:07
SONG CAM SHIPBUILDING JOINT STOCK COMPANY publishes the plan Plan to select contractors for a number of consulting packages for the investment preparation phase of construction of the Ship Building and Completion Project No. 2 with 4 bidding package .
30/07/2024 10:42
SONG CAM SHIPBUILDING JOINT STOCK COMPANY publishes Tender Notice TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" in the form Open bidding .
24/07/2024 16:29
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package TB.XNTĐ.02-Appraisal of bidding documents, LCNT results via national bidding network for equipment procurement package "01 200T forklift" .
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
17/07/2024 16:10
SONG CAM SHIPBUILDING JOINT STOCK COMPANY announced the results of the bid package TB.XNTĐ.01-Prepare bidding documents, evaluate bidding documents via national bidding network for equipment procurement package "01 200T total forklift" .
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
17/07/2024 15:05
SONG CAM SHIPBUILDING JOINT STOCK COMPANY publishes the plan Plan for selecting contractors for the item: Investment in purchasing equipment "01 200T total forklift" to serve the Company's production with 4 bidding package .
13/07/2024 15:57
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
23/09/2024 16:30
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH TUYẾT NGA
30/08/2024 09:36
Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted Tender Notice ND&HTT.03-Prepare a feasibility study report for the investment project to build the Arena and complete ship No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with the form Open bidding.
10/08/2024 09:09
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.02-Appraisal of Bidding Documents, LCNT results via national bidding network for package Preparation of feasibility study report for Investment project to build and complete ship building No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
31/07/2024 15:15
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package ND&HTT.01-Prepare Bidding Documents, evaluate Bidding Documents through the national bidding network for bidding package Prepare feasibility study report for Investment Project to build Stadium and ship completion No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
31/07/2024 15:07
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the request Plan to select contractors for a number of consulting packages for the investment preparation phase of construction of the Ship Building and Completion Project No. 2 of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with 4 bidding package.
30/07/2024 10:42
Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted Tender Notice TB.XNTĐ.04-Procurement of equipment "01 200T total section forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with the form Open bidding.
24/07/2024 16:29
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.02-Appraisal of bidding documents, LCNT results via national bidding network for equipment procurement package "01 200T forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: GOLD STAR HAI PHONG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY
17/07/2024 16:10
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the results of the bidding package TB.XNTĐ.01-Prepare bidding documents, evaluate bidding documents via national bidding network for equipment procurement package "01 200T total forklift" of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
17/07/2024 15:05
The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted the request Plan for selecting contractors for the item: Investment in purchasing equipment "01 200T total forklift" to serve the Company's production of the investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY with 4 bidding package.
13/07/2024 15:57
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted 10 of the contractor selection plan, which contains 33 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted 9 Tender Notice in the 9 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has posted 27 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 27 package, canceled the bid 0 package (among the bidding packages above).
- There are 22 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY is the investor of 4 package, of which 4 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY is the owner of 9 contractor selection plan. In which, they self-invite 8 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY is an investor with 16 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG CAM SHIPBUILDING JOINT STOCK COMPANY is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code