Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Su doan 350 as follows:
- Has relationships with 1 project owners.
- Has relationships with 14 contractor.
- Announced 5 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 18 contractor selection plans with a total of 28 bidding packages, of which 16 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 29 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 21 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.25 contractors.
- Breakdown by bidding field: Goods 11.11%, Construction 88.89%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 14,221,640,000 VND, of which the total winning bid value is: 14,203,420,800 VND.
- The savings rate is: 0.13%.
Data analysis results of DauThau.info software for bid solicitors Su doan 350 as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.25 contractors.
- Proportion of bidding fields: Goods 11.11%, Construction 88.89%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 14,221,640,000 VND, in which the total winning value is: 14,203,420,800 VND.
- The savings rate is: 0.13%.
This Bid solicitor is also an investor. The analysis results of data for the investor Su doan 350 are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 39 contractor selection plans, of which 18 were self-published, and 21 were published by other entities.
- Is the investor of 11 Tender Notices, of which 8 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Su doan 350 announced the results of the bid package Construction of a car repair bridge at a comprehensive repair station. .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 17:05
Su doan 350 announced the results of the bid package Repair work for the K2 Squadron warehouse roof .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 17:01
Su doan 350 announced the results of the bid package Repair and reinforce the entrance to the technical area. .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 16:58
Su doan 350 publishes the plan Approval of budget estimates and contractor selection plan: Repair and reinforcement of the entrance to the technical area. with 1 bidding package .
12/08/2026 07:23
Su doan 350 publishes the plan Approval of budget estimates and the preliminary investment plan: Construction of a bridge and a car repair shop. with 1 bidding package .
12/08/2026 07:21
Su doan 350 publishes the plan Approval of budget estimates and the detailed cost estimate for the repair of the warehouse roof, K2 Squadron. with 1 bidding package .
12/08/2026 07:16
Su doan 350 publishes the plan Approval of budget estimates and contractor selection plan: Repair and reinforcement of the entrance to the technical area. with 1 bidding package .
12/08/2026 00:53
Su doan 350 announced the results of the bid package Repairing the duty house of the Ministry Division Agency .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2026 10:57
Su doan 350 announced the results of the bid package Maintaining the offices of 03 agencies/Ministry Division agencies .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2026 10:54
Su doan 350 publishes the plan Maintaining the offices of 03 agencies/Ministry Division agencies with 1 bidding package .
22/05/2026 15:20
The data sheet has been partially hidden, to see the full information please Login or Register
Su doan 350 announced the results of the bid package Repairing and upgrading car wash bridge in 2025 .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
12/06/2025 14:50
Su doan 350 publishes the plan Approving fund estimates and planning selection plan estimating: Repairing and upgrading car wash bridge for general repair station in 2025 with 1 bidding package .
09/06/2025 15:57
Su doan 350 announced the results of the bid package Preservation and maintenance of specialized construction works in 2025 .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2025 16:30
Su doan 350 announced the results of the bid package Houses of common construction in 2025- Division 350 .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2025 16:28
Su doan 350 announced the results of the bid package Maintenance of construction works in 2025- Division 350 .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2025 16:26
Su doan 350 publishes the plan Regarding the approval of funding estimates and planning selection plan: Maintenance of construction works in 2025- Division 350 with 1 bidding package .
26/05/2025 14:56
Su doan 350 publishes the plan Regarding the approval of funding estimates and planning selection plan: Houses of general construction in 2025- Division 350 with 1 bidding package .
26/05/2025 14:30
Su doan 350 publishes the plan Decision on approval of budget estimates and estimates: maintenance and maintenance of specialized construction works in 2025 with 1 bidding package .
26/05/2025 14:21
Su doan 350 announced the results of the bid package Package No. 01: Conference hall; The cafeteria and kitchen are in the budget: Housing funding source - Division 350 .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
03/12/2024 16:19
Su doan 350 announced the results of the bidding package Tender package No 01: Conference hall; The cafeteria and kitchen are in the budget: Housing funding source - Division 350 with 1 participating contractors .
29/11/2024 09:05
The data sheet has been partially hidden, to see the full information please Login or Register
Su doan 350 announced the results of the bid package Construction of a car repair bridge at a comprehensive repair station. .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 17:05
Su doan 350 announced the results of the bid package Repair work for the K2 Squadron warehouse roof .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 17:01
Su doan 350 announced the results of the bid package Repair and reinforce the entrance to the technical area. .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
17/08/2026 16:58
Su doan 350 publishes the plan Approval of budget estimates and contractor selection plan: Repair and reinforcement of the entrance to the technical area. with 1 bidding package .
12/08/2026 07:23
Su doan 350 publishes the plan Approval of budget estimates and the preliminary investment plan: Construction of a bridge and a car repair shop. with 1 bidding package .
12/08/2026 07:21
Su doan 350 publishes the plan Approval of budget estimates and the detailed cost estimate for the repair of the warehouse roof, K2 Squadron. with 1 bidding package .
12/08/2026 07:16
Su doan 350 publishes the plan Approval of budget estimates and contractor selection plan: Repair and reinforcement of the entrance to the technical area. with 1 bidding package .
12/08/2026 00:53
Su doan 350 announced the results of the bid package Repairing the duty house of the Ministry Division Agency .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2026 10:57
Su doan 350 announced the results of the bid package Maintaining the offices of 03 agencies/Ministry Division agencies .
- Winning bidder: TAN KIEN THINH VIET NAM JOINT STOCK COMPANY
29/05/2026 10:54
Su doan 350 publishes the plan Maintaining the offices of 03 agencies/Ministry Division agencies with 1 bidding package .
22/05/2026 15:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Su doan 350 has posted 18 of the contractor selection plan, which contains 28 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Su doan 350 has posted 9 Tender Notices in 9 bidding packages. Among these, 8 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Su doan 350 has posted 29 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 29 package, canceled the bid 0 package (among the bidding packages above).
- There are 21 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Su doan 350 has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Su doan 350 has a relationship with 17 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Su doan 350 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects