Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sư đoàn 370 as follows:
- Has relationships with 1 project owners.
- Has relationships with 54 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 6 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Sư đoàn 370 as follows:
- Has relationships with 54 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 06: Construction supervision consultancy of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ICOM VIỆT NAM
31/10/2022 10:52
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 08: Construction of fences to protect Phan Rang airport, Radio K1, Radio K2 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH THI CÔNG XÂY DỰNG KHANG GIA
21/10/2022 11:16
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 09: Renovating and repairing asphalt pavement from 2d Guards Company to SCH e937 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
17/10/2022 14:12
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 05: Construction supervision consultancy and equipment installation of the investor Sư đoàn 370.
- Winning bidder: Văn phòng tư vấn và chuyển giao công nghệ xây dựng
29/09/2022 17:10
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 08: Construction of Stations K1, K2, K8, K10_e937 and Meteorological Stations_e917 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM THẮNG
28/09/2022 16:49
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 07: New construction d ministry_d Guard_e937 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
28/09/2022 16:48
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Synchronizing and compiling documents for 04 majors in KTHK of the investor Sư đoàn 370.
24/08/2022 15:04
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package No. 01: Procurement of materials and goods with technical assurance specialized in KTHK of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ VIỆT HOÀN PHÁT
24/08/2022 15:04
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Buying stationery of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH XD - TM - DV PHAN HƯNG PHÁT
10/08/2022 15:42
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Buy diesel oil 0.05S of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN XĂNG DẦU DẦU KHÍ SÀI GÒN
15/07/2022 17:15
The data sheet has been partially hidden, to see the full information please Login or Register
Sư đoàn 370 announced the results of the bid package Package 06: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ICOM VIỆT NAM
31/10/2022 10:52
Sư đoàn 370 announced the results of the bid package Package 08: Construction of fences to protect Phan Rang airport, Radio K1, Radio K2 .
- Winning bidder: CÔNG TY TNHH THI CÔNG XÂY DỰNG KHANG GIA
21/10/2022 11:16
Sư đoàn 370 announced the results of the bid package Package 09: Renovating and repairing asphalt pavement from 2d Guards Company to SCH e937 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
17/10/2022 14:12
Sư đoàn 370 announced the results of the bidding package Package 06: Construction supervision consultancy with 1 participating contractors .
09/10/2022 09:01
Sư đoàn 370 announced the results of the bidding package Package 08: Construction of fences to protect Phan Rang airport, Radio K1, Radio K2 with 2 participating contractors .
05/10/2022 09:05
Sư đoàn 370 announced the results of the bidding package Package 09: Renovating and repairing asphalt pavement from 2d Guards Company to SCH e937 with 1 participating contractors .
05/10/2022 09:03
Sư đoàn 370 announced the results of the bid package Package 05: Construction supervision consultancy and equipment installation .
- Winning bidder: Văn phòng tư vấn và chuyển giao công nghệ xây dựng
29/09/2022 17:10
Sư đoàn 370 announced the results of the bid package Package 08: Construction of Stations K1, K2, K8, K10_e937 and Meteorological Stations_e917 .
- Winning bidder: CÔNG TY TNHH HẢI PHÁT THẮNG, CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM THẮNG
28/09/2022 16:49
Sư đoàn 370 announced the results of the bid package Package 07: New construction d ministry_d Guard_e937 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
28/09/2022 16:48
Sư đoàn 370 announced the results of the bidding package Package 05: Construction supervision consultancy and equipment installation with 1 participating contractors .
27/09/2022 08:54
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 06: Construction supervision consultancy of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ICOM VIỆT NAM
31/10/2022 10:52
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 08: Construction of fences to protect Phan Rang airport, Radio K1, Radio K2 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH THI CÔNG XÂY DỰNG KHANG GIA
21/10/2022 11:16
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 09: Renovating and repairing asphalt pavement from 2d Guards Company to SCH e937 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
17/10/2022 14:12
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 05: Construction supervision consultancy and equipment installation of the investor Sư đoàn 370.
- Winning bidder: Văn phòng tư vấn và chuyển giao công nghệ xây dựng
29/09/2022 17:10
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 08: Construction of Stations K1, K2, K8, K10_e937 and Meteorological Stations_e917 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM THẮNG
28/09/2022 16:49
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 07: New construction d ministry_d Guard_e937 of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH HỒNG HÀ
28/09/2022 16:48
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Synchronizing and compiling documents for 04 majors in KTHK of the investor Sư đoàn 370.
24/08/2022 15:04
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package No. 01: Procurement of materials and goods with technical assurance specialized in KTHK of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ VIỆT HOÀN PHÁT
24/08/2022 15:04
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Buying stationery of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY TNHH XD - TM - DV PHAN HƯNG PHÁT
10/08/2022 15:42
The Bid solicitor Sư đoàn 370 has posted the results of the bidding package Package 02: Buy diesel oil 0.05S of the investor Sư đoàn 370.
- Winning bidder: CÔNG TY CỔ PHẦN XĂNG DẦU DẦU KHÍ SÀI GÒN
15/07/2022 17:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sư đoàn 370 has posted 1 of the contractor selection plan, which contains 6 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sư đoàn 370 has posted 0 Tender Notices in 0 bidding packages. Among these, -49 Tender Notices were self-invited, and 49 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sư đoàn 370 has posted 0 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 0 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sư đoàn 370 has a relationship with 54 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sư đoàn 370 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects