Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Electricity of Vietnam as follows:
- Has relationships with 1 project owners.
- Has relationships with 89 contractor.
- Announced 188 investment development project, of which 12 projects have not yet announced the prequalification documents.
- Announced 150 contractor selection plans with a total of 275 bidding packages, of which 86 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 129 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 64 packages that have not fully posted the contractor selection results. Of these 57 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 84,566,257,402 VND, of which the total winning bid value is: 79,302,211,185 VND.
- The savings rate is: 6.22%.
Data analysis results of DauThau.info software for bid solicitors Electricity of Vietnam as follows:
- Has relationships with 89 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 84,566,257,402 VND, in which the total winning value is: 79,302,211,185 VND.
- The savings rate is: 6.22%.
This Bid solicitor is also an investor. The analysis results of data for the investor Electricity of Vietnam are as follows:
- Is the investor of 188 development investment projects.
- Is the investor of 532 contractor selection plans, of which 150 were self-published, and 382 were published by other entities.
- Is the investor of 241 Tender Notices, of which 0 were self-invited, and 241 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Electricity of Vietnam publishes the plan Tender selection plan (round 2) for the "Expansion of Coal Storage Roof" project at the Duyen Hai 3 Thermal Power Plant. with 4 bidding package .
28/08/2026 12:31
Electricity of Vietnam publishes the plan Renovation of a portion of the area in Room 701 of the D10 office building, located at Khuất Duy Tiến Street, managed by the Electricity 1 Project Management Board, within the D10 building on Khuất Duy Tiến Street – Thanh Xuan Ward – Hanoi City. with 1 bidding package .
27/08/2026 15:22
Electricity of Vietnam publishes the plan Plan for selecting a contractor to provide logistics services for the working group's discussions with the Russian Federal Bank regarding credit for the Ninh Thuan 1 project. with 1 bidding package .
19/08/2026 14:48
Electricity of Vietnam publishes the plan Replacement of elevator components from PL1 to PL15 in the EVN building, scheduled for 2026. with 1 bidding package .
14/08/2026 16:58
Electricity of Vietnam publishes the plan Providing front desk services for the EVN building during the period of 2027-2028. with 1 bidding package .
11/08/2026 10:06
Electricity of Vietnam publishes the plan Purchase of health insurance combined with human resources support for employees of EVN and the Vietnam Electricity Labor Union in 2026. with 1 bidding package .
10/08/2026 09:39
Electricity of Vietnam publishes the plan Procurement plan for office equipment for the Ninh Thuan Nuclear Power Plant Project Management Unit in 2026. with 1 bidding package .
06/08/2026 08:53
Electricity of Vietnam publishes the plan Repairing and renovating the interior, adjusting the fire protection system on the 2nd floor, 4th floor, basement warehouse B1-B2 and floors 20 to 32, Tower A, EVN Building with 1 bidding package .
31/07/2026 16:12
Electricity of Vietnam publishes the plan Sewing traditional ao dai for female employees of EVN Agency with 1 bidding package .
22/07/2026 10:26
Electricity of Vietnam publishes the plan Providing consumable materials to serve public areas at EVN Building in the period 2026 - 2028 with 1 bidding package .
13/07/2026 09:28
The data sheet has been partially hidden, to see the full information please Login or Register
Electricity of Vietnam publishes the plan Regarding approval of adjusting the contractor selection plan for a number of bidding packages under the Quang Trach I Thermal Power Plant project with 3 bidding package .
21/10/2025 19:44
Electricity of Vietnam publishes the plan Contractor selection plan (phase 12) - Quang Trach I Thermal Power Plant Project with 14 bidding package .
04/09/2025 16:05
Electricity of Vietnam publishes the plan Plan for contractor selection Consulting package for examining the pre -feasibility study report to adjust Ninh Thuan Nuclear Electric Project 1 with 1 bidding package .
25/07/2025 08:26
Electricity of Vietnam publishes the plan Business data analysis training program with 1 bidding package .
10/07/2025 16:42
Electricity of Vietnam publishes the plan Contractor selection plan (phase 1) - Project on renovation and upgrade of emissions of Thai Binh Thermal Power Plant with 2 bidding package .
30/06/2025 12:11
Electricity of Vietnam publishes the plan Shopping for gifts for the 5th EVN patriotic emulation with 1 bidding package .
30/06/2025 10:51
Electricity of Vietnam publishes the plan Contractor selection plan (phase 12) - Quang Trach I Thermal Power Plant Project with 14 bidding package .
27/06/2025 11:23
Electricity of Vietnam publishes the plan Buy gifts for the Fourth Party Committee of the Vietnam Electricity Group, term 2025-2030 with 1 bidding package .
25/06/2025 16:57
Electricity of Vietnam publishes the plan Program of practical programming and application languages with 1 bidding package .
24/06/2025 11:08
Electricity of Vietnam publishes the plan Equipped with uniforms for the EVN Party Congress with 2 bidding package .
23/06/2025 13:26
The data sheet has been partially hidden, to see the full information please Login or Register
Electricity of Vietnam publishes the plan Tender selection plan (round 2) for the "Expansion of Coal Storage Roof" project at the Duyen Hai 3 Thermal Power Plant. with 4 bidding package .
28/08/2026 12:31
Electricity of Vietnam publishes the plan Renovation of a portion of the area in Room 701 of the D10 office building, located at Khuất Duy Tiến Street, managed by the Electricity 1 Project Management Board, within the D10 building on Khuất Duy Tiến Street – Thanh Xuan Ward – Hanoi City. with 1 bidding package .
27/08/2026 15:22
Electricity of Vietnam publishes the plan Plan for selecting a contractor to provide logistics services for the working group's discussions with the Russian Federal Bank regarding credit for the Ninh Thuan 1 project. with 1 bidding package .
19/08/2026 14:48
Electricity of Vietnam publishes the plan Replacement of elevator components from PL1 to PL15 in the EVN building, scheduled for 2026. with 1 bidding package .
14/08/2026 16:58
Electricity of Vietnam publishes the plan Providing front desk services for the EVN building during the period of 2027-2028. with 1 bidding package .
11/08/2026 10:06
Electricity of Vietnam publishes the plan Purchase of health insurance combined with human resources support for employees of EVN and the Vietnam Electricity Labor Union in 2026. with 1 bidding package .
10/08/2026 09:39
Electricity of Vietnam publishes the plan Procurement plan for office equipment for the Ninh Thuan Nuclear Power Plant Project Management Unit in 2026. with 1 bidding package .
06/08/2026 08:53
Electricity of Vietnam publishes the plan Repairing and renovating the interior, adjusting the fire protection system on the 2nd floor, 4th floor, basement warehouse B1-B2 and floors 20 to 32, Tower A, EVN Building with 1 bidding package .
31/07/2026 16:12
Electricity of Vietnam publishes the plan Sewing traditional ao dai for female employees of EVN Agency with 1 bidding package .
22/07/2026 10:26
Electricity of Vietnam publishes the plan Providing consumable materials to serve public areas at EVN Building in the period 2026 - 2028 with 1 bidding package .
13/07/2026 09:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Electricity of Vietnam has posted 150 of the contractor selection plan, which contains 275 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Electricity of Vietnam has posted 129 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 129 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Electricity of Vietnam has a relationship with 89 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Electricity of Vietnam has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects