Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors THƯ VIỆN TỈNH ĐỒNG NAI as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 13 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 112,902,249 VND, of which the total winning bid value is: 112,902,249 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors THƯ VIỆN TỈNH ĐỒNG NAI as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 112,902,249 VND, in which the total winning value is: 112,902,249 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor THƯ VIỆN TỈNH ĐỒNG NAI are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 9 contractor selection plans, of which 8 were self-published, and 1 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Bidding package No. 04 (non-consulting): Construction insurance costs .
- Winning bidder: Vien Dong Assurance Corporation
07/11/2025 14:26
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Bidding package No. 03 (consultation): Construction supervision + Equipment .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG CHỐNG THẤM ĐỒNG NAI
07/11/2025 14:24
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Package No. 02 (equipment): Supply and installation of elevators .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ XÂY DỰNG GIA AN PHÁT
07/11/2025 14:17
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Package No. 01 (construction and installation): Construction work .
- Winning bidder: Công ty TNHH Xây dựng Hạ tầng An Khang Phát
07/11/2025 13:40
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Repair some items and replace the elevator of the Provincial Library with 5 bidding package .
29/10/2025 09:48
Investor THƯ VIỆN TỈNH ĐỒNG NAI has posted an investment and development project Repair some items and replace the elevator of the Provincial Library.
29/10/2025 09:09
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the request Termite control and insecticide of the investor THƯ VIỆN TỈNH ĐỒNG NAI with 1 bidding package.
24/02/2025 10:18
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the results of the bidding package Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI.
09/12/2024 15:05
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the request Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI with 1 bidding package.
03/12/2024 16:46
The Bid solicitor CÔNG TY TNHH TƯ VẤN THƯƠNG MẠI VÀ DỊCH VỤ ĐẠI KIM has posted the results of the bidding package Procurement of additional books in 2024 from the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI.
- Winning bidder: VIET NAM BOOK CULTURAL KNOWLEDGE JOINT STOCK COMPANY
19/11/2024 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Termite control and insecticide with 1 bidding package .
24/02/2025 10:18
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library .
- Winning bidder:
09/12/2024 15:05
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library with 1 bidding package .
03/12/2024 16:46
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Digitizing geographic archive documents .
- Winning bidder:
12/11/2024 16:49
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Digitizing geographic archive documents with 1 bidding package .
11/11/2024 11:04
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Equipped with iron shelves for Library books .
- Winning bidder:
01/11/2024 16:00
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Renovating the Library's newspaper and magazine archives .
- Winning bidder:
31/10/2024 15:26
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Maintenance of fire protection system .
- Winning bidder:
29/10/2024 10:14
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Renovating the Library's newspaper and magazine archives with 1 bidding package .
25/10/2024 16:12
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Equipped with iron shelves for Library books with 1 bidding package .
25/10/2024 16:07
The data sheet has been partially hidden, to see the full information please Login or Register
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Bidding package No. 04 (non-consulting): Construction insurance costs .
- Winning bidder: Vien Dong Assurance Corporation
07/11/2025 14:26
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Bidding package No. 03 (consultation): Construction supervision + Equipment .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG CHỐNG THẤM ĐỒNG NAI
07/11/2025 14:24
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Package No. 02 (equipment): Supply and installation of elevators .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ XÂY DỰNG GIA AN PHÁT
07/11/2025 14:17
THƯ VIỆN TỈNH ĐỒNG NAI announced the results of the bid package Package No. 01 (construction and installation): Construction work .
- Winning bidder: Công ty TNHH Xây dựng Hạ tầng An Khang Phát
07/11/2025 13:40
THƯ VIỆN TỈNH ĐỒNG NAI publishes the plan Repair some items and replace the elevator of the Provincial Library with 5 bidding package .
29/10/2025 09:48
Investor THƯ VIỆN TỈNH ĐỒNG NAI has posted an investment and development project Repair some items and replace the elevator of the Provincial Library.
29/10/2025 09:09
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the request Termite control and insecticide of the investor THƯ VIỆN TỈNH ĐỒNG NAI with 1 bidding package.
24/02/2025 10:18
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the results of the bidding package Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI.
09/12/2024 15:05
The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted the request Equipped with air conditioning in the 3 HP reading room and 3 HP magazine room of the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI with 1 bidding package.
03/12/2024 16:46
The Bid solicitor CÔNG TY TNHH TƯ VẤN THƯƠNG MẠI VÀ DỊCH VỤ ĐẠI KIM has posted the results of the bidding package Procurement of additional books in 2024 from the Provincial Library of the investor THƯ VIỆN TỈNH ĐỒNG NAI.
- Winning bidder: VIET NAM BOOK CULTURAL KNOWLEDGE JOINT STOCK COMPANY
19/11/2024 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s THƯ VIỆN TỈNH ĐỒNG NAI has posted 8 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor THƯ VIỆN TỈNH ĐỒNG NAI has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity THƯ VIỆN TỈNH ĐỒNG NAI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects