Data analysis results of DauThau.info software for bid solicitors Tiểu đoàn 23 as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 12 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,819,439,000 VND, of which the total winning bid value is: 1,817,981,000 VND.
- The savings rate is: 0.08%.
Data analysis results of DauThau.info software for bid solicitors Tiểu đoàn 23 as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,819,439,000 VND, in which the total winning value is: 1,817,981,000 VND.
- The savings rate is: 0.08%.
This Bid solicitor is also an investor. The analysis results of data for the investor Tiểu đoàn 23 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 8 contractor selection plans, of which 6 were self-published, and 2 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Tiểu đoàn 23 announced the results of the bid package Package 01: Ensuring materials to serve the repair, preservation and maintenance of chemical equipment in 2025 .
- Winning bidder: HỘ KINH DOANH TỔNG HỢP NAM VIỆT
13/12/2025 23:10
Tiểu đoàn 23 announced the results of the bid package Package 03: Consulting on appraisal of HSYC and appraisal of QLCNT results .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - CƠ GIỚI VIỆT NAM
12/12/2025 19:55
Tiểu đoàn 23 announced the results of the bid package Bid Package 02: Consultancy on preparation of Proposal and Evaluation of Proposal .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
12/12/2025 19:53
Tiểu đoàn 23 publishes the plan Ensuring materials to serve the repair, preservation and maintenance of chemical equipment in 2025 with 3 bidding package .
12/12/2025 19:48
Tiểu đoàn 23 announced the results of the bid package Package 01: Ensuring material for training, drills - rescue in 2025 .
- Winning bidder: Hộ kinh doanh Nguyễn Đình Lý
30/07/2025 16:34
Tiểu đoàn 23 publishes the plan Ensuring material for training, drills - rescue in 2025 with 3 bidding package .
23/07/2025 10:45
The Bid solicitor Tiểu đoàn 23 has posted the results of the bidding package Package 01: Fighting and sports training in 2025 of the investor Tiểu đoàn 23.
19/06/2025 10:59
The Bid solicitor Tiểu đoàn 23 has posted the results of the bidding package Procurement of equipment to ensure chemical work in 2025 of the investor Tiểu đoàn 23.
- Winning bidder: Hộ kinh doanh TM Tổng hợp Ninh An
04/06/2025 16:34
The Bid solicitor Tiểu đoàn 23 has posted the request Procurement of equipment to ensure chemical work in 2025 of the investor Tiểu đoàn 23 with 1 bidding package.
04/06/2025 16:20
The Bid solicitor Tiểu đoàn 23 has posted the request Fighting training and sports in 2025 of the investor Tiểu đoàn 23 with 3 bidding package.
17/03/2025 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
Tiểu đoàn 23 announced the results of the bid package Package 01: Fighting and sports training in 2025 .
- Winning bidder: Hộ kinh doanh TMDV Thái Trụ
19/06/2025 10:59
Tiểu đoàn 23 announced the results of the bid package Procurement of equipment to ensure chemical work in 2025 .
- Winning bidder: Hộ kinh doanh TM Tổng hợp Ninh An
04/06/2025 16:34
Tiểu đoàn 23 publishes the plan Procurement of equipment to ensure chemical work in 2025 with 1 bidding package .
04/06/2025 16:20
Tiểu đoàn 23 publishes the plan Fighting training and sports in 2025 with 3 bidding package .
17/03/2025 11:18
Tiểu đoàn 23 publishes the plan Project: Garden and pond of Battalion 23/Ministry of General Staff/PK-KQ Army with 2 bidding package .
02/01/2025 10:22
Tiểu đoàn 23 announced the results of the bid package Tender package TV-02: Supervision consultancy .
- Winning bidder: TAN BINH MINH CONSTRUCTION INVESTMENT CONSULTING JOINT STOCK COMPANY
31/12/2024 17:18
Tiểu đoàn 23 publishes the plan Project: Garden and pond of Battalion 23/Ministry of General Staff/PK-KQ Army with 2 bidding package .
21/12/2024 16:26
Tiểu đoàn 23 announced the results of the bid package Bidding package No. 01: Procurement of materials for maintenance, repair, and synchronization of motorbikes, TBKT 2024 .
- Winning bidder: Hộ kinh doanh phụ tùng ô tô
24/10/2024 20:29
Tiểu đoàn 23 announced the results of the bidding package Bidding package No. 01: Procurement of materials for maintenance, repair, and synchronization of motorbikes, TBKT 2024 with 1 participating contractors .
19/10/2024 09:26
Tiểu đoàn 23 publishes Tender Notice Bidding package No. 01: Procurement of materials for maintenance, repair, and synchronization of motorbikes, TBKT 2024 in the form Competitive Offer .
14/10/2024 21:01
The data sheet has been partially hidden, to see the full information please Login or Register
Tiểu đoàn 23 announced the results of the bid package Package 01: Ensuring materials to serve the repair, preservation and maintenance of chemical equipment in 2025 .
- Winning bidder: HỘ KINH DOANH TỔNG HỢP NAM VIỆT
13/12/2025 23:10
Tiểu đoàn 23 announced the results of the bid package Package 03: Consulting on appraisal of HSYC and appraisal of QLCNT results .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - CƠ GIỚI VIỆT NAM
12/12/2025 19:55
Tiểu đoàn 23 announced the results of the bid package Bid Package 02: Consultancy on preparation of Proposal and Evaluation of Proposal .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
12/12/2025 19:53
Tiểu đoàn 23 publishes the plan Ensuring materials to serve the repair, preservation and maintenance of chemical equipment in 2025 with 3 bidding package .
12/12/2025 19:48
Tiểu đoàn 23 announced the results of the bid package Package 01: Ensuring material for training, drills - rescue in 2025 .
- Winning bidder: Hộ kinh doanh Nguyễn Đình Lý
30/07/2025 16:34
Tiểu đoàn 23 publishes the plan Ensuring material for training, drills - rescue in 2025 with 3 bidding package .
23/07/2025 10:45
The Bid solicitor Tiểu đoàn 23 has posted the results of the bidding package Package 01: Fighting and sports training in 2025 of the investor Tiểu đoàn 23.
19/06/2025 10:59
The Bid solicitor Tiểu đoàn 23 has posted the results of the bidding package Procurement of equipment to ensure chemical work in 2025 of the investor Tiểu đoàn 23.
- Winning bidder: Hộ kinh doanh TM Tổng hợp Ninh An
04/06/2025 16:34
The Bid solicitor Tiểu đoàn 23 has posted the request Procurement of equipment to ensure chemical work in 2025 of the investor Tiểu đoàn 23 with 1 bidding package.
04/06/2025 16:20
The Bid solicitor Tiểu đoàn 23 has posted the request Fighting training and sports in 2025 of the investor Tiểu đoàn 23 with 3 bidding package.
17/03/2025 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Tiểu đoàn 23 has posted 6 of the contractor selection plan, which contains 12 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Tiểu đoàn 23 has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tiểu đoàn 23 has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Tiểu đoàn 23 has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tiểu đoàn 23 has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Tiểu đoàn 23 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects