Data analysis results of DauThau.info software for bid solicitors Tin Nghia Project Management as follows:
- Has relationships with 55 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 92 contractor selection plans with a total of 106 bidding packages, of which 68 prequalification documents have not found the investment project.
- Has invited bids for 115 packages (with 125 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 86 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 21 packages with results that do not have tender notice or prequalification notice.
- There are 36 packages that have not fully posted the contractor selection results. Of these 18 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.92 contractors.
- Breakdown by bidding field: Goods 0.80%, Construction 78.40%, Consultancy 12.80%, Non-consultancy 0%, Mixed 8.00%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,202,634,633,580 VND, of which the total winning bid value is: 1,109,228,521,927 VND.
- The savings rate is: 7.77%.
Data analysis results of DauThau.info software for bid solicitors Tin Nghia Project Management as follows:
- Has relationships with 55 contractor.
- The average number of contractors participating in each bidding package is: 1.92 contractors.
- Proportion of bidding fields: Goods 0.80%, Construction 78.40%, Consulting 12.80%, Non-consulting 0%, Mixed 8.00%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,202,634,633,580 VND, in which the total winning value is: 1,109,228,521,927 VND.
- The savings rate is: 7.77%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 64 Contractor selection plan in which 64 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 65 bidding packages in which 65 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 9 bidding packages, of which 8 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 78.27% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bình Phước (2), Đồng Nai (2), Undefined (5)
- Has relationships with 6 Bid Solicitors
- Has competed against 2 contractors in 1 bidding packages, won 0 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN TÍN NGHĨA
- Code of capacity certificate of construction activities: 00016183
- Issuer: Sở kế hoạch và đầu tư tỉnh Đồng Nai
- Fields:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật (Hệ thống xử lý nước thải)
⚬ Giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật (thoát nước theo tuyến)
⚬ Giám sát công tác xây dựng công trình: Giao thông (đường bộ)
⚬ Khảo sát xây dựng: Địa chất công trình
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp: có k/cấu dạng nhà, Trạm bán lẻ xăng dầu
⚬ Giám sát công tác xây dựng công trình: Dân dụng
⚬ Giám sát công tác xây dựng công trình: Công nghiệp: có k/cấu dạng nhà, Trạm bán lẻ xăng dầu
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông: Đường bộ, cầu đường bộ
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management.
31/10/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction part of C1C2 Factory. of the investor Tin Nghia Project Management.
06/10/2022 13:20
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
The Bid solicitor Tin Nghia Project Management has posted the request Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with 1 bidding package.
29/08/2022 13:52
The Bid solicitor Tin Nghia Project Management has posted the request Construction of Route 6 (from Km 0+139.4 to Km 0+254.3) of the investor Tin Nghia Project Management with 1 bidding package.
29/08/2022 13:24
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction part of C1C2 Factory. of the investor Tin Nghia Project Management with the form National competitive bidding.
25/08/2022 17:47
The Bid solicitor Tin Nghia Project Management has posted the request Tender Package for Construction of C1C2 Factory Building C1C2 . Factory Construction of the investor Tin Nghia Project Management with 1 bidding package.
22/08/2022 16:11
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse of the investor Tin Nghia Project Management.
15/08/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, supply of equipment, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of An Phuoc Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
Tin Nghia Project Management announced the results of the bid package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG SỐ 5
31/10/2022 00:00
Tin Nghia Project Management announced the results of the bid package Construction part of C1C2 Factory. .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THẢO KIÊN PHÁT, CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG VIỆT KIẾN MINH
06/10/2022 13:20
Tin Nghia Project Management announced the results of the bidding package Construction part of C1C2 Factory. with 4 participating contractors .
28/09/2022 09:43
Tin Nghia Project Management publishes Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). in the form Competitive Bidding .
29/08/2022 14:21
Tin Nghia Project Management publishes Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). in the form Competitive Bidding .
29/08/2022 14:21
Tin Nghia Project Management publishes the plan Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). with 1 bidding package .
29/08/2022 13:52
Tin Nghia Project Management publishes the plan Construction of Route 6 (from Km 0+139.4 to Km 0+254.3) with 1 bidding package .
29/08/2022 13:24
Tin Nghia Project Management publishes Tender Notice Construction part of C1C2 Factory. in the form National competitive bidding .
25/08/2022 17:47
Tin Nghia Project Management publishes the plan Tender Package for Construction of C1C2 Factory Building C1C2 . Factory Construction with 1 bidding package .
22/08/2022 16:11
Tin Nghia Project Management announced the results of the bid package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG DỊCH VỤ THƯƠNG MẠI WHITE NEST
15/08/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management.
31/10/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction part of C1C2 Factory. of the investor Tin Nghia Project Management.
06/10/2022 13:20
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
The Bid solicitor Tin Nghia Project Management has posted the request Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with 1 bidding package.
29/08/2022 13:52
The Bid solicitor Tin Nghia Project Management has posted the request Construction of Route 6 (from Km 0+139.4 to Km 0+254.3) of the investor Tin Nghia Project Management with 1 bidding package.
29/08/2022 13:24
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction part of C1C2 Factory. of the investor Tin Nghia Project Management with the form National competitive bidding.
25/08/2022 17:47
The Bid solicitor Tin Nghia Project Management has posted the request Tender Package for Construction of C1C2 Factory Building C1C2 . Factory Construction of the investor Tin Nghia Project Management with 1 bidding package.
22/08/2022 16:11
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse of the investor Tin Nghia Project Management.
15/08/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, supply of equipment, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of An Phuoc Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Tin Nghia Project Management has posted 92 of the contractor selection plan, which contains 106 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Tin Nghia Project Management has posted 125 Tender Notice in the 115 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tin Nghia Project Management has posted 86 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 86 package, canceled the bid 1 package (among the bidding packages above).
- There are 21 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Tin Nghia Project Management has a relationship with 55 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Tin Nghia Project Management has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Tin Nghia Project Management is the investor of 65 package, of which 65 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Tin Nghia Project Management is the owner of 64 contractor selection plan. In which, they self-invite 64 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Tin Nghia Project Management is an investor with 52 contractor. The data sheet has been partially hidden, to see the full information please Login or Register