Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Tòa án nhân dân huyện Ba Vì as follows:
- Has relationships with 2 project owners.
- Has relationships with 8 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 15 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 12 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 33.33%, Consultancy 66.67%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 61,623,000 VND, of which the total winning bid value is: 57,032,000 VND.
- The savings rate is: 7.45%.
Data analysis results of DauThau.info software for bid solicitors Tòa án nhân dân huyện Ba Vì as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 33.33%, Consulting 66.67%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 61,623,000 VND, in which the total winning value is: 57,032,000 VND.
- The savings rate is: 7.45%.
This Bid solicitor is also an investor. The analysis results of data for the investor Tòa án nhân dân huyện Ba Vì are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 15: Cost of determining the boundary boundary in the field; Map mapping for land clearance of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: SONG DA DEVELOPMENT JOINT STOCK COMPANY
24/02/2025 16:01
Bid solicitor Tòa án nhân dân huyện Ba Vì has posted Tender Notice Tender package No 12: Design construction drawings and prepare estimates of the investor Tòa án nhân dân huyện Ba Vì with the form Open bidding.
24/02/2025 11:38
Bid solicitor Tòa án nhân dân huyện Ba Vì has posted Tender Notice Bidding package 11: Project management consultancy in the investment period of the investor Tòa án nhân dân huyện Ba Vì with the form Open bidding.
24/02/2025 11:37
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the request The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City of the investor Tòa án nhân dân huyện Ba Vì with 8 bidding package.
20/02/2025 10:10
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 10 of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng nhà hà nội
19/02/2025 09:11
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 9 of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: QUANG HUNG INVESTMENT CONSULTING CONSTRUCTION JOINT STOCK COMPANY
19/02/2025 09:11
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the request The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City of the investor Tòa án nhân dân huyện Ba Vì with 8 bidding package.
13/02/2025 14:56
Investor Tòa án nhân dân huyện Ba Vì has posted an investment and development project Approving the project to build a new headquarters of the People's Court of Ba Vi district, Hanoi city.
13/02/2025 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
Tòa án nhân dân huyện Ba Vì announced the results of the bidding package Bidding package 11: Project management consultancy in the investment period with 1 participating contractors .
14/03/2025 09:11
Tòa án nhân dân huyện Ba Vì announced the results of the bidding package Tender package No 12: Design construction drawings and prepare estimates with 1 participating contractors .
14/03/2025 09:11
Tòa án nhân dân huyện Ba Vì announced the results of the bid package Package No. 15: Cost of determining the boundary boundary in the field; Map mapping for land clearance .
- Winning bidder: SONG DA DEVELOPMENT JOINT STOCK COMPANY
24/02/2025 16:01
Tòa án nhân dân huyện Ba Vì publishes Tender Notice Tender package No 12: Design construction drawings and prepare estimates in the form Open bidding .
24/02/2025 11:38
Tòa án nhân dân huyện Ba Vì publishes Tender Notice Bidding package 11: Project management consultancy in the investment period in the form Open bidding .
24/02/2025 11:37
Tòa án nhân dân huyện Ba Vì publishes the plan The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City with 8 bidding package .
20/02/2025 10:10
Tòa án nhân dân huyện Ba Vì announced the results of the bid package Package No. 10 .
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng nhà hà nội
19/02/2025 09:11
Tòa án nhân dân huyện Ba Vì announced the results of the bid package Package No. 9 .
- Winning bidder: QUANG HUNG INVESTMENT CONSULTING CONSTRUCTION JOINT STOCK COMPANY
19/02/2025 09:11
Tòa án nhân dân huyện Ba Vì publishes the plan The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City with 8 bidding package .
13/02/2025 14:56
Tòa án nhân dân huyện Ba Vì announced the results of the bidding package Tender package No 03: Construction and installation with 1 participating contractors .
10/09/2021 17:09
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 15: Cost of determining the boundary boundary in the field; Map mapping for land clearance of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: SONG DA DEVELOPMENT JOINT STOCK COMPANY
24/02/2025 16:01
Bid solicitor Tòa án nhân dân huyện Ba Vì has posted Tender Notice Tender package No 12: Design construction drawings and prepare estimates of the investor Tòa án nhân dân huyện Ba Vì with the form Open bidding.
24/02/2025 11:38
Bid solicitor Tòa án nhân dân huyện Ba Vì has posted Tender Notice Bidding package 11: Project management consultancy in the investment period of the investor Tòa án nhân dân huyện Ba Vì with the form Open bidding.
24/02/2025 11:37
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the request The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City of the investor Tòa án nhân dân huyện Ba Vì with 8 bidding package.
20/02/2025 10:10
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 10 of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng nhà hà nội
19/02/2025 09:11
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the results of the bidding package Package No. 9 of the investor Tòa án nhân dân huyện Ba Vì.
- Winning bidder: QUANG HUNG INVESTMENT CONSULTING CONSTRUCTION JOINT STOCK COMPANY
19/02/2025 09:11
The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted the request The contractor selection plan for a number of consulting packages for the project implementation phase of the project: New construction of the People's Court of Ba Vi District, Hanoi City of the investor Tòa án nhân dân huyện Ba Vì with 8 bidding package.
13/02/2025 14:56
Investor Tòa án nhân dân huyện Ba Vì has posted an investment and development project Approving the project to build a new headquarters of the People's Court of Ba Vi district, Hanoi city.
13/02/2025 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Tòa án nhân dân huyện Ba Vì has posted 3 of the contractor selection plan, which contains 15 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted 3 Tender Notices in 3 bidding packages. Among these, 2 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tòa án nhân dân huyện Ba Vì has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Tòa án nhân dân huyện Ba Vì has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tòa án nhân dân huyện Ba Vì has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Tòa án nhân dân huyện Ba Vì has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects