Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 61 contractor.
- Announced 51 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 136 contractor selection plans with a total of 152 bidding packages, of which 31 prequalification documents have not found the investment project.
- Has invited bids for 61 packages (with 68 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 46 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 50 packages that have not fully posted the contractor selection results. Of these 46 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.26 contractors.
- Breakdown by bidding field: Goods 7.35%, Construction 67.65%, Consultancy 22.06%, Non-consultancy 0%, Mixed 2.94%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 618,995,038,659 VND, of which the total winning bid value is: 598,338,180,678 VND.
- The savings rate is: 3.34%.
Data analysis results of DauThau.info software for bid solicitors VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 61 contractor.
- The average number of contractors participating in each bidding package is: 1.26 contractors.
- Proportion of bidding fields: Goods 7.35%, Construction 67.65%, Consulting 22.06%, Non-consulting 0%, Mixed 2.94%, Other 0%.
- The total value according to the bidding package with valid IMP is: 618,995,038,659 VND, in which the total winning value is: 598,338,180,678 VND.
- The savings rate is: 3.34%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 51 investment and development projects.
- As the owner of 50 Contractor selection plan in which 50 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 17 bidding packages in which 17 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.52% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Thanh Hoá (1), Nghệ An (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consulting on surveys, construction drawing designs and estimates Project: Repairing damage to the surface of National Highway 5, section Km36+400 to Km41+689 on the left side of the route (from Hai Phong to Hanoi) of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: SAO KHUE INVESTMENT- CONSTRUCTION JOINT STOCK COMPANY
30/10/2024 15:15
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
28/10/2024 11:18
Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Construction project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
18/10/2024 16:58
Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
24/09/2024 09:20
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Contractor selection plan for the package Consulting and supervision of construction works Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
23/09/2024 14:43
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Plan for selecting contractors to execute the project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
23/09/2024 14:37
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Construction and installation works Repairing bridge decks and bridgeheads of Lach Tray bridge, bridge No. 02 and Quan Toan bridge on National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: Xí nghiệp xây dựng và bảo trì đường bộ VIDIFI
11/09/2024 15:25
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consulting and supervision of construction and installation works Repairing bridge decks and bridgeheads of Lach Tray bridge, No. 02 bridge and Quan Toan bridge on National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: HUY HUNG PHAT CONSTRUCTION AND CONSULTANT COMPANY LIMITED
11/09/2024 15:15
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Consulting on construction supervision of repairing road surface damage at intersection Km77+600 on National Highway 5 according to the content of document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
04/09/2024 15:11
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Bidding package KT02.2024 - Audit of completed project settlement reports for 12 projects, works, and bidding packages completed in 2024 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
30/08/2024 13:46
The data sheet has been partially hidden, to see the full information please Login or Register
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Consulting on surveys, construction drawing designs and estimates Project: Repairing damage to the surface of National Highway 5, section Km36+400 to Km41+689 on the left side of the route (from Hai Phong to Hanoi) .
- Winning bidder: SAO KHUE INVESTMENT- CONSTRUCTION JOINT STOCK COMPANY
30/10/2024 15:15
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department .
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
28/10/2024 11:18
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Construction project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 with 1 participating contractors .
28/10/2024 09:11
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Construction project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 in the form Open bidding .
18/10/2024 16:58
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department with 2 participating contractors .
03/10/2024 09:42
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department in the form Open bidding .
24/09/2024 09:20
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY publishes the plan Contractor selection plan for the package Consulting and supervision of construction works Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 with 1 bidding package .
23/09/2024 14:43
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY publishes the plan Plan for selecting contractors to execute the project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 with 1 bidding package .
23/09/2024 14:37
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Consulting on surveys, construction drawing designs and estimates Project: Repairing damage to the surface of National Highway 5, section Km36+400 to Km41+689 on the left side of the route (from Hai Phong to Hanoi) with 3 participating contractors .
12/09/2024 09:11
VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Construction and installation works Repairing bridge decks and bridgeheads of Lach Tray bridge, bridge No. 02 and Quan Toan bridge on National Highway 5 .
- Winning bidder: Xí nghiệp xây dựng và bảo trì đường bộ VIDIFI
11/09/2024 15:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consulting on surveys, construction drawing designs and estimates Project: Repairing damage to the surface of National Highway 5, section Km36+400 to Km41+689 on the left side of the route (from Hai Phong to Hanoi) of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: SAO KHUE INVESTMENT- CONSTRUCTION JOINT STOCK COMPANY
30/10/2024 15:15
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
28/10/2024 11:18
Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Construction project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
18/10/2024 16:58
Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Repairing damage to the road surface at the Km77+600 intersection on National Highway 5 according to document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
24/09/2024 09:20
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Contractor selection plan for the package Consulting and supervision of construction works Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
23/09/2024 14:43
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Plan for selecting contractors to execute the project Procurement and installation of generators at Toll Station No. 1 & 2, National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
23/09/2024 14:37
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Construction and installation works Repairing bridge decks and bridgeheads of Lach Tray bridge, bridge No. 02 and Quan Toan bridge on National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: Xí nghiệp xây dựng và bảo trì đường bộ VIDIFI
11/09/2024 15:25
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consulting and supervision of construction and installation works Repairing bridge decks and bridgeheads of Lach Tray bridge, No. 02 bridge and Quan Toan bridge on National Highway 5 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: HUY HUNG PHAT CONSTRUCTION AND CONSULTANT COMPANY LIMITED
11/09/2024 15:15
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Consulting on construction supervision of repairing road surface damage at intersection Km77+600 on National Highway 5 according to the content of document No. 2771/CDBVN-KHDT dated April 25, 2024 of the Vietnam Road Department of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
04/09/2024 15:11
The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted the request Bidding package KT02.2024 - Audit of completed project settlement reports for 12 projects, works, and bidding packages completed in 2024 of the investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY with 1 bidding package.
30/08/2024 13:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted 136 of the contractor selection plan, which contains 152 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted 68 Tender Notice in the 61 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has posted 46 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 46 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has a relationship with 61 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY is the investor of 17 package, of which 17 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY is the owner of 50 contractor selection plan. In which, they self-invite 50 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY is an investor with 58 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY is the investor of 51 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code