Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors BACH DANG CONSTRUCTION CORPORATION - JSC as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors BACH DANG CONSTRUCTION CORPORATION - JSC as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
You need to Login or Sign up to view all informations.
- Participated in 103 bidding packages, of which 53 were won, 43 were lost, 2 are pending results, and 5 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 55.06% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 87.57% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (10), TP.Hồ Chí Minh (9), Đồng Nai (6), Quảng Trị (6), Đà Nẵng (6), Bắc Ninh (5), Hưng Yên (3), Quảng Ninh (3), Thái Nguyên (3), An Giang (3), Khánh Hòa (2), Vĩnh Long (2), Lâm Đồng (2), Hà Tĩnh (2), Nghệ An (1), Lào Cai (1), Lạng Sơn (1), Undefined (38)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (7), TP.Hồ Chí Minh (6), Đà Nẵng (6), Bình Phước (4), Quảng Bình (4), Quảng Ninh (3), Hải Dương (3), Bắc Ninh (3), Thái Nguyên (2), Khánh Hòa (2), Quảng Trị (2), Bến Tre (2), Hưng Yên (2), Hà Tĩnh (2), Kiên Giang (2), Bắc Giang (2), Thái Bình (1), Nghệ An (1), Lào Cai (1), Lâm Đồng (1), Bà Rịa - Vũng Tàu (1), Bình Dương (1), An Giang (1), Lạng Sơn (1), Undefined (43)
- Has relationships with 73 Bid Solicitors
- Has competed against 306 contractors in 62 bidding packages, won 14 packages, lost 43 packages, 0 are pending results, and 5 were canceled.
- Has collaborated with 67 contractors in 50 bidding packages, won 21 packages, lost 27 packages, 0 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
- Name of construction organization: TỔNG CÔNG TY XÂY DỰNG BẠCH ĐẰNG - CTCP
- Code of capacity certificate of construction activities: 00001100
- Issuer: Sở Kế hoạch và Đầu tư thành phố Hải Phòng
- Fields:
⚬ Thi công xây dựng công trình: Dân dụng, Công nghiệp (năng lượng), Giao thông đường bộ, Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
BACH DANG CONSTRUCTION CORPORATION - JSC publishes the plan TA with 1 bidding package .
14/01/2020 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BACH DANG CONSTRUCTION CORPORATION - JSC has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects