Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trại giam Số 6, Cục C10, Bộ Công an as follows:
- Has relationships with 1 project owners.
- Has relationships with 48 contractor.
- Announced 13 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 53 contractor selection plans with a total of 75 bidding packages, of which 50 prequalification documents have not found the investment project.
- Has invited bids for 17 packages (with 20 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 61 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 46 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 90.00%, Construction 10.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 56,928,193,266 VND, of which the total winning bid value is: 55,165,244,985 VND.
- The savings rate is: 3.10%.
Data analysis results of DauThau.info software for bid solicitors Trại giam Số 6, Cục C10, Bộ Công an as follows:
- Has relationships with 48 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 90.00%, Construction 10.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 56,928,193,266 VND, in which the total winning value is: 55,165,244,985 VND.
- The savings rate is: 3.10%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trại giam Số 6, Cục C10, Bộ Công an are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 109 contractor selection plans, of which 44 were self-published, and 65 were published by other entities.
- Is the investor of 37 Tender Notices, of which 20 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package No. 03: Providing food and necessities for the first 6 months of 2026 for inmates of Prison No. 6 .
- Winning bidder: HOAN PHU CONSTRUCTION AND TRADING COMPANY LIMITED
30/12/2025 09:19
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package No. 03: Providing necessities to serve prisoners' regime in the first 6 months of 2026 at Prison No. 6 .
- Winning bidder: RAM VIETNAM MTV COMPANY LIMITED
29/12/2025 21:05
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Supply, installation and replacement of equipment and maintenance of pure filtered water systems to serve officers and prisoners at the camps and professional teams of Prison No. 6 .
- Winning bidder: Nguyen Minh Environmental Technology Co., Ltd.
24/12/2025 11:15
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchase zinc-coded box steel materials to construct and repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty cổ phần cơ khí xây dựng Bắc Miền Trung
23/12/2025 16:52
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Purchasing galvanized steel box materials to construct and repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:49
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchasing corrugated iron materials to repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty trách nhiệm hữu hạn dịch vụ tổng hợp Hoàng Anh
23/12/2025 16:28
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Purchase cold-corrugated roofing materials to repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:25
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchasing painting materials to repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty cổ phần Sonata Việt Nam
23/12/2025 16:17
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Buying painting materials to repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:12
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Supply, installation and replacement of equipment and maintenance of pure filtered water systems to serve officers and prisoners at the camps and professional teams of Prison No. 6 with 1 bidding package .
23/12/2025 15:40
The data sheet has been partially hidden, to see the full information please Login or Register
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package 02: Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Thu
07/07/2025 09:09
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 with 1 bidding package .
07/07/2025 09:07
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package No. 01: Providing food including (chicken, fish cakes and duck eggs) in July 2025 for prison No. 6 .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ LINH
07/07/2025 09:00
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Providing food includes (chicken, fish cakes and duck eggs) in July 2025 for prison No. 6 with 1 bidding package .
07/07/2025 08:58
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Providing food includes (chicken, fish cakes and duck eggs) in July 2025 for prison No. 6 with 1 bidding package .
07/07/2025 08:51
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package 01: Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Thu
04/07/2025 08:34
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 with 1 bidding package .
04/07/2025 08:27
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package 01: Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ LINH
04/07/2025 08:23
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Providing food including (silk rolls, scad and fried tofu) in July 2025 for prison No. 6 with 1 bidding package .
04/07/2025 08:17
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Buy repair supplies, paving factories in the camp No. 1 with 1 bidding package .
19/06/2025 17:27
The data sheet has been partially hidden, to see the full information please Login or Register
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package No. 03: Providing food and necessities for the first 6 months of 2026 for inmates of Prison No. 6 .
- Winning bidder: HOAN PHU CONSTRUCTION AND TRADING COMPANY LIMITED
30/12/2025 09:19
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Package No. 03: Providing necessities to serve prisoners' regime in the first 6 months of 2026 at Prison No. 6 .
- Winning bidder: RAM VIETNAM MTV COMPANY LIMITED
29/12/2025 21:05
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Supply, installation and replacement of equipment and maintenance of pure filtered water systems to serve officers and prisoners at the camps and professional teams of Prison No. 6 .
- Winning bidder: Nguyen Minh Environmental Technology Co., Ltd.
24/12/2025 11:15
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchase zinc-coded box steel materials to construct and repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty cổ phần cơ khí xây dựng Bắc Miền Trung
23/12/2025 16:52
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Purchasing galvanized steel box materials to construct and repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:49
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchasing corrugated iron materials to repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty trách nhiệm hữu hạn dịch vụ tổng hợp Hoàng Anh
23/12/2025 16:28
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Purchase cold-corrugated roofing materials to repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:25
Trại giam Số 6, Cục C10, Bộ Công an announced the results of the bid package Bidding package: Purchasing painting materials to repair works damaged by natural disasters in Prison Unit No. 6 .
- Winning bidder: Công ty cổ phần Sonata Việt Nam
23/12/2025 16:17
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Buying painting materials to repair works damaged by natural disasters in Prison Unit No. 6 with 1 bidding package .
23/12/2025 16:12
Trại giam Số 6, Cục C10, Bộ Công an publishes the plan Supply, installation and replacement of equipment and maintenance of pure filtered water systems to serve officers and prisoners at the camps and professional teams of Prison No. 6 with 1 bidding package .
23/12/2025 15:40
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trại giam Số 6, Cục C10, Bộ Công an has posted 53 of the contractor selection plan, which contains 75 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trại giam Số 6, Cục C10, Bộ Công an has posted 20 Tender Notices in 17 bidding packages. Among these, 20 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trại giam Số 6, Cục C10, Bộ Công an has posted 61 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 61 package, canceled the bid 0 package (among the bidding packages above).
- There are 46 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trại giam Số 6, Cục C10, Bộ Công an has a relationship with 48 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trại giam Số 6, Cục C10, Bộ Công an has a relationship with 10 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trại giam Số 6, Cục C10, Bộ Công an has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects