Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors TRẠM THUỶ LỢI QUẬN BÌNH THUỶ as follows:
- Has relationships with 5 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 6 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 118,420,000 VND, of which the total winning bid value is: 117,898,000 VND.
- The savings rate is: 0.44%.
Data analysis results of DauThau.info software for bid solicitors TRẠM THUỶ LỢI QUẬN BÌNH THUỶ as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 118,420,000 VND, in which the total winning value is: 117,898,000 VND.
- The savings rate is: 0.44%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 0 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on construction supervision (package no. 04) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG NGUYỄN TOÀN TÀI
05/09/2024 15:30
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on appraisal of bidding documents and appraisal of contractor selection results for construction packages (package no. 02) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HƯNG ĐẠI THẮNG
02/08/2024 14:16
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on preparing bidding documents and evaluating bid documents for construction packages (package no. 01) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: ABC GENERAL CONSULTANTS AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
30/07/2024 14:37
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Plan to select contractors for the project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 6 bidding package.
25/07/2024 15:51
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 6 bidding package.
25/07/2024 15:48
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consultancy and verification of construction drawings and project estimates of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Tư vấn Đầu tư Xây dựng Huy Phát
03/06/2024 10:08
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ VÀ XÂY DỰNG NGUYỄN TOÀN PHÁT
24/05/2024 16:33
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 2 bidding package.
20/05/2024 09:39
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ Posted Development Investment Project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward.
20/05/2024 09:09
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ Posted Development Investment Project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward.
16/05/2024 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ announced the results of the bid package Consulting on construction supervision (package no. 04) .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG NGUYỄN TOÀN TÀI
05/09/2024 15:30
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ announced the results of the bid package Consulting on appraisal of bidding documents and appraisal of contractor selection results for construction packages (package no. 02) .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HƯNG ĐẠI THẮNG
02/08/2024 14:16
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ announced the results of the bid package Consulting on preparing bidding documents and evaluating bid documents for construction packages (package no. 01) .
- Winning bidder: ABC GENERAL CONSULTANTS AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
30/07/2024 14:37
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ publishes the plan Plan to select contractors for the project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward with 6 bidding package .
25/07/2024 15:51
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ publishes the plan Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward with 6 bidding package .
25/07/2024 15:48
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ announced the results of the bid package Consultancy and verification of construction drawings and project estimates .
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Tư vấn Đầu tư Xây dựng Huy Phát
03/06/2024 10:08
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ VÀ XÂY DỰNG NGUYỄN TOÀN PHÁT
24/05/2024 16:33
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ publishes the plan Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward with 2 bidding package .
20/05/2024 09:39
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on construction supervision (package no. 04) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG NGUYỄN TOÀN TÀI
05/09/2024 15:30
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on appraisal of bidding documents and appraisal of contractor selection results for construction packages (package no. 02) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HƯNG ĐẠI THẮNG
02/08/2024 14:16
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consulting on preparing bidding documents and evaluating bid documents for construction packages (package no. 01) of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: ABC GENERAL CONSULTANTS AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
30/07/2024 14:37
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Plan to select contractors for the project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 6 bidding package.
25/07/2024 15:51
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 6 bidding package.
25/07/2024 15:48
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consultancy and verification of construction drawings and project estimates of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Tư vấn Đầu tư Xây dựng Huy Phát
03/06/2024 10:08
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ VÀ XÂY DỰNG NGUYỄN TOÀN PHÁT
24/05/2024 16:33
The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted the request Contractor selection plan for the investment preparation phase Project: Reinforcing the dike section at risk of landslides at Con Son and dredging the top of Vam Ho canal, Bui Huu Nghia ward of the investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ with 2 bidding package.
20/05/2024 09:39
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ Posted Development Investment Project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward.
20/05/2024 09:09
TRẠM THUỶ LỢI QUẬN BÌNH THUỶ Posted Development Investment Project Reinforcing the dike section at risk of landslides at Con Son and dredging Vam Ho canal, Bui Huu Nghia ward.
16/05/2024 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted 3 of the contractor selection plan, which contains 6 of the bidding package. See full list here
Summary: The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ is an investor with 6 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRẠM THUỶ LỢI QUẬN BÌNH THUỶ is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code