Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG as follows:
- Has relationships with 30 contractor.
- Announced 1 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 28 contractor selection plans with a total of 53 bidding packages, of which 28 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 17 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 33 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 18 packages with results that do not have tender notice or prequalification notice.
- There are 17 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.93 contractors.
- Breakdown by bidding field: Goods 23.53%, Construction 0%, Consultancy 0%, Non-consultancy 76.47%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,526,420,647 VND, of which the total winning bid value is: 3,062,999,377 VND.
- The savings rate is: 13.14%.
Data analysis results of DauThau.info software for bid solicitors TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG as follows:
- Has relationships with 30 contractor.
- The average number of contractors participating in each bidding package is: 3.93 contractors.
- Proportion of bidding fields: Goods 23.53%, Construction 0%, Consulting 0%, Non-consulting 76.47%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,526,420,647 VND, in which the total winning value is: 3,062,999,377 VND.
- The savings rate is: 13.14%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 17 Contractor selection plan in which 17 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 17 bidding packages in which 17 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:47
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:38
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 09:01
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:52
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate
to Cau Ong Bo intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:30
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)” Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:52
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:43
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate to Ong Bo Bridge intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:36
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Procurement of supplies and stationery in 2024 for the Land Fund Development Center of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN MINH QUỐC
12/09/2024 11:30
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consultancy on appraisal of required documents; Evaluation of contractor selection results of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: NAM THONG BAO COMPANY LIMITED
10/09/2024 16:44
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:47
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:38
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection .
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 09:01
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection .
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:52
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate
to Cau Ong Bo intersection .
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:30
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG publishes the plan “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)” Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection with 1 bidding package .
08/10/2024 08:52
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG publishes the plan “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection with 1 bidding package .
08/10/2024 08:43
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG publishes the plan “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate to Ong Bo Bridge intersection with 1 bidding package .
08/10/2024 08:36
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Procurement of supplies and stationery in 2024 for the Land Fund Development Center .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN MINH QUỐC
12/09/2024 11:30
TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG announced the results of the bid package Consultancy on appraisal of required documents; Evaluation of contractor selection results .
- Winning bidder: NAM THONG BAO COMPANY LIMITED
10/09/2024 16:44
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:47
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on surveying and preparing construction drawing designs - preparing estimates for items: Relocating transformer stations of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - THƯƠNG MẠI NAM HƯNG
25/10/2024 14:38
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 09:01
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:52
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (structural survey current status - prepare design documents and detailed estimates) Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate
to Cau Ong Bo intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: KHONG GIAN HOAN HAO CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
14/10/2024 08:30
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)” Project Clearance of National Highway 13 section from Tu Do intersection to Le Hong Phong intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:52
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Ong Bo bridge to Huu Nghi intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:43
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the request “Consulting on determining the value and cost of relocating assets in addition to the unit price of compensation and asset support in Decision No. 38/2019/QD-UBND dated December 20, 2019 of the People's Committee of Binh Duong province (survey results Current status structure - prepare design documents and detailed estimates)" Project Clearance of National Highway 13 section from Vinh Phu Welcome Gate to Ong Bo Bridge intersection of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG with 1 bidding package.
08/10/2024 08:36
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Procurement of supplies and stationery in 2024 for the Land Fund Development Center of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN MINH QUỐC
12/09/2024 11:30
The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted the results of the bidding package Consultancy on appraisal of required documents; Evaluation of contractor selection results of the investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG.
- Winning bidder: NAM THONG BAO COMPANY LIMITED
10/09/2024 16:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted 28 of the contractor selection plan, which contains 53 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted 17 Tender Notice in the 15 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has posted 33 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 33 package, canceled the bid 0 package (among the bidding packages above).
- There are 18 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has a relationship with 30 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG is the investor of 17 package, of which 17 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG is the owner of 17 contractor selection plan. In which, they self-invite 17 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG is an investor with 30 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT TỈNH BÌNH DƯƠNG is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code