Data analysis results of DauThau.info software for bid solicitors TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU as follows:
- Has relationships with 31 contractor.
- Announced 45 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 65 contractor selection plans with a total of 145 bidding packages, of which 24 prequalification documents have not found the investment project.
- Has invited bids for 55 packages (with 56 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 96 packages that have not fully posted the contractor selection results. Of these 96 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.88 contractors.
- Breakdown by bidding field: Goods 7.14%, Construction 66.07%, Consultancy 17.86%, Non-consultancy 5.36%, Mixed 3.57%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU as follows:
- Has relationships with 31 contractor.
- The average number of contractors participating in each bidding package is: 1.88 contractors.
- Proportion of bidding fields: Goods 7.14%, Construction 66.07%, Consulting 17.86%, Non-consulting 5.36%, Mixed 3.57%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 45 investment and development projects.
- As the owner of 40 Contractor selection plan in which 16 Contractor selection plan is self-published, and 24 Contractor selection plan is posted by other units.
- Being the investor of 20 bidding packages in which 10 packages are self-invited, and 10 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing the manager of Da Den reservoir, Phu My town.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing Song Ray canal manager, Chau Duc district.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing pumping station Chau Pha - Song Xoai, Phu My town.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Construction of anti-spill at key sections of Chu Hai dike, Ba Ria city and Phu My town.
30/07/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Construction of anti-spill at key sections of Chu Hai dike, Ba Ria city and Phu My town.
29/07/2022 07:00
The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted the request Surveying, measuring, planting landmarks to map Gia Hoet 2 reservoir (setting landmarks at the elevation of the reinforced water level, recovering the land area from reinforcement of the investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU with 2 bidding package.
31/05/2022 08:06
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Surveying, measuring, planting landmarks to map Suoi Giau reservoir (planting landmarks at the elevation of the water level increase, recovering the part of the land from the reinforcement down to the lake bed).
18/05/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing and upgrading the Phuoc Thanh Village Dam, Dat Do town, Dat Do district.
12/05/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Treating termite nests that hide the dam body and the environment around the river Ray lake dam body.
09/05/2022 07:00
The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted the request Surveying, measuring, planting landmarks to map Suoi Doi 1 reservoir (planting landmarks at the elevation of the reinforced water level, recovering the area of land from the reinforcement down to the lake bed) of the investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU with 2 bidding package.
21/04/2022 13:44
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Gia Hoet 2 reservoir (setting landmarks at the elevation of the reinforced water level, recovering the land area from reinforcement with 2 bidding package .
31/05/2022 08:06
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Suoi Doi 1 reservoir (planting landmarks at the elevation of the reinforced water level, recovering the area of land from the reinforcement down to the lake bed) with 2 bidding package .
21/04/2022 13:44
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Lo O reservoir (planting landmarks at the elevation of the reinforced water level, recovering the part of the land from the reinforcement down to the lake bed) with 2 bidding package .
21/04/2022 13:36
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Gia Hoet 1 reservoir (planting landmarks at the height of the water level rise reinforcement, recovering the area of land from reinforcement down to the lake bed) with 2 bidding package .
21/04/2022 13:29
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Suoi Giau reservoir (planting landmarks at the elevation of the water level increase, recovering the part of the land from the reinforcement down to the lake bed) with 6 bidding package .
21/04/2022 13:15
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Treating termite nests that hide the dam body and the environment around the river Ray lake dam body with 6 bidding package .
21/04/2022 12:57
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Repairing and upgrading the Phuoc Thanh Village Dam, Dat Do town, Dat Do district with 6 bidding package .
21/04/2022 11:01
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Repairing the office of the Center for Management and Exploitation of Irrigation Works with 5 bidding package .
28/02/2022 08:11
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Surveying, measuring, planting landmarks to map Kim Long reservoir (planting landmarks at the height of the water level rise reinforcement, recovering the area of land from reinforcement down to the lake bed) with 2 bidding package .
20/01/2022 09:26
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU publishes the plan Repair and upgrade Suoi Cac reservoir, Hoa Hiep commune, Xuyen Moc district with 3 bidding package .
12/01/2022 15:19
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing the manager of Da Den reservoir, Phu My town.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing Song Ray canal manager, Chau Duc district.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing pumping station Chau Pha - Song Xoai, Phu My town.
25/08/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Construction of anti-spill at key sections of Chu Hai dike, Ba Ria city and Phu My town.
30/07/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Construction of anti-spill at key sections of Chu Hai dike, Ba Ria city and Phu My town.
29/07/2022 07:00
The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted the request Surveying, measuring, planting landmarks to map Gia Hoet 2 reservoir (setting landmarks at the elevation of the reinforced water level, recovering the land area from reinforcement of the investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU with 2 bidding package.
31/05/2022 08:06
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Surveying, measuring, planting landmarks to map Suoi Giau reservoir (planting landmarks at the elevation of the water level increase, recovering the part of the land from the reinforcement down to the lake bed).
18/05/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Repairing and upgrading the Phuoc Thanh Village Dam, Dat Do town, Dat Do district.
12/05/2022 07:00
TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU Posted Development Investment Project Treating termite nests that hide the dam body and the environment around the river Ray lake dam body.
09/05/2022 07:00
The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted the request Surveying, measuring, planting landmarks to map Suoi Doi 1 reservoir (planting landmarks at the elevation of the reinforced water level, recovering the area of land from the reinforcement down to the lake bed) of the investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU with 2 bidding package.
21/04/2022 13:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted 65 of the contractor selection plan, which contains 145 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has posted 56 Tender Notice in the 55 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has a relationship with 31 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU is the investor of 20 package, of which 10 package is self-invited, other units invite bid 10 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU is the owner of 40 contractor selection plan. In which, they self-invite 16 of contractor selection plan, other units invite bids of 24 of contractor selection plan.
Summary: Investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU is an investor with 28 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUNG TÂM QUẢN LÝ, KHAI THÁC CÔNG TRÌNH THỦY LỢI TỈNH BÀ RỊA - VŨNG TÀU is the investor of 45 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code