Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ as follows:
- Has relationships with 1 project owners.
- Has relationships with 31 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 22 bidding packages, of which 25 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 12 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 71.43%, Construction 0%, Consultancy 0%, Non-consultancy 28.57%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 22,366,943,200 VND, of which the total winning bid value is: 22,116,603,067 VND.
- The savings rate is: 1.12%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ as follows:
- Has relationships with 31 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 71.43%, Construction 0%, Consulting 0%, Non-consulting 28.57%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 22,366,943,200 VND, in which the total winning value is: 22,116,603,067 VND.
- The savings rate is: 1.12%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 38 contractor selection plans, of which 23 were self-published, and 15 were published by other entities.
- Is the investor of 9 Tender Notices, of which 7 were self-invited, and 2 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 27 bidding packages, of which 27 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 92.87% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.81% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (16), Cà Mau (4), Vĩnh Long (3), Tây Ninh (2), TP.Hồ Chí Minh (1), (1), An Giang (1), Đồng Tháp (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Cần Thơ (7), Bạc Liêu (4), Trà Vinh (2), Long An (2), Sóc Trăng (2), TP.Hồ Chí Minh (1), Cà Mau (1), Hậu Giang (1), Kiên Giang (1), Bến Tre (1), Vĩnh Long (1), Tiền Giang (1), An Giang (1), Đồng Tháp (1), Undefined (13)
- Has relationships with 12 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Consulting survey, making feasibility study report .
- Winning bidder: VIETNAM ITD TECHNOLOGY JOINT STOCK COMPANY
22/12/2025 20:32
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Consulting survey, making feasibility study report with 1 bidding package .
19/12/2025 15:27
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Purchase mandatory fire and explosion insurance to expand fire and special risks for assets of the Vietnam Television Center in the Southwest region 2025 .
- Winning bidder: PVI Insurance
28/11/2025 18:21
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Purchase mandatory fire and explosion insurance to expand fire and special risks for assets of the Vietnam Television Center in the Southwest region 2025 with 1 bidding package .
28/11/2025 18:15
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 11: Prepare environmental registration documents .
- Winning bidder: CÔNG TY TNHH MTV CÔNG NGHỆ VÀ GIẢI PHÁP MÔI TRƯỜNG TÍN VIỆT
25/11/2025 15:51
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Bidding packages under the project investment preparation category: "Investment in infrastructure construction, auxiliary works of Vietnam Television Center in the Southwest region" with 5 bidding package .
25/11/2025 15:47
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 01: Procurement of replacement equipment for mobile television and generators of the Vietnam Western Vietnam Center .
- Winning bidder: TEKSCOM TECHNOLOGY TECHNIQUE COMPANY LIMITED
14/11/2025 16:46
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 10: Prepare documents for technical infrastructure connection agreement .
- Winning bidder: VIETNAM INVESTMENT CONSULTING AND CONSTRUCTION DESIGN JOINT STOCK COMPANY
12/11/2025 10:47
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 09: Verification of feasibility study report .
- Winning bidder: VINHGROUP TRADING AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
12/11/2025 10:45
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 08: Prepare feasibility study report .
- Winning bidder: VIETNAM INVESTMENT CONSULTING AND CONSTRUCTION DESIGN JOINT STOCK COMPANY
12/11/2025 10:43
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 02: Examining estimates of investment preparation items for the project "Investment in infrastructure construction, auxiliary works of Vietnam Television Center in the Southwest region" .
- Winning bidder: VINHGROUP TRADING AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
16/06/2025 10:15
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 01: Estimating the investment items for investment projects "Investment in infrastructure construction, auxiliary works of Vietnam Television Center in the Southwest region" .
- Winning bidder: Công ty cổ phần tư vấn xây dựng Sao Phương Đông
16/06/2025 10:14
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Estimating and verifying the estimates of the investment items of the project "Investment in infrastructure construction, auxiliary works of Vietnam Television Center in the Southwest region" with 2 bidding package .
06/06/2025 15:35
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 01: Procurement of furniture and office equipment for the Southwestern Region THVN Center .
- Winning bidder: EVS SYSTEM AND SOLUTIONS DEVELOPMENT COMPANY LIMITED, HOANG GIA FURNITURE AND CONSTRUCT JOINT STOCK COMPANY
31/12/2024 14:55
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bidding package Package 01: Procurement of furniture and office equipment for the Southwestern Region THVN Center with 1 participating contractors .
25/12/2024 11:11
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes Tender Notice Package 01: Procurement of furniture and office equipment for the Southwestern Region THVN Center in the form Open bidding .
19/12/2024 10:30
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes Tender Notice Package 01: Procurement of furniture and office equipment for the Southwestern Region THVN Center in the form Open bidding .
09/12/2024 09:04
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 03: Consultancy on appraisal of bidding documents, appraisal of contractor selection results .
- Winning bidder: CFTD INNOVATION JOINT STOCK COMPANY
04/12/2024 17:11
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Bidding package 02: Consultancy on preparation of bidding documents, evaluation of bids .
- Winning bidder: PHD CONSULTANT INVESTMENT AND TRADING JOINT STOCK COMPANY
04/12/2024 17:08
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Procurement of furniture and office equipment for the Vietnam Television Center in the Southwest region with 3 bidding package .
03/12/2024 09:37
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Consulting survey, making feasibility study report .
- Winning bidder: VIETNAM ITD TECHNOLOGY JOINT STOCK COMPANY
22/12/2025 20:32
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Consulting survey, making feasibility study report with 1 bidding package .
19/12/2025 15:27
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Purchase mandatory fire and explosion insurance to expand fire and special risks for assets of the Vietnam Television Center in the Southwest region 2025 .
- Winning bidder: PVI Insurance
28/11/2025 18:21
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Purchase mandatory fire and explosion insurance to expand fire and special risks for assets of the Vietnam Television Center in the Southwest region 2025 with 1 bidding package .
28/11/2025 18:15
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 11: Prepare environmental registration documents .
- Winning bidder: CÔNG TY TNHH MTV CÔNG NGHỆ VÀ GIẢI PHÁP MÔI TRƯỜNG TÍN VIỆT
25/11/2025 15:51
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ publishes the plan Bidding packages under the project investment preparation category: "Investment in infrastructure construction, auxiliary works of Vietnam Television Center in the Southwest region" with 5 bidding package .
25/11/2025 15:47
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 01: Procurement of replacement equipment for mobile television and generators of the Vietnam Western Vietnam Center .
- Winning bidder: TEKSCOM TECHNOLOGY TECHNIQUE COMPANY LIMITED
14/11/2025 16:46
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 10: Prepare documents for technical infrastructure connection agreement .
- Winning bidder: VIETNAM INVESTMENT CONSULTING AND CONSTRUCTION DESIGN JOINT STOCK COMPANY
12/11/2025 10:47
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 09: Verification of feasibility study report .
- Winning bidder: VINHGROUP TRADING AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
12/11/2025 10:45
Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ announced the results of the bid package Package 08: Prepare feasibility study report .
- Winning bidder: VIETNAM INVESTMENT CONSULTING AND CONSTRUCTION DESIGN JOINT STOCK COMPANY
12/11/2025 10:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has posted 25 of the contractor selection plan, which contains 22 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has posted 7 Tender Notices in 6 bidding packages. Among these, 7 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 12 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has a relationship with 31 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trung tâm Truyền hình Việt Nam khu vực Tây Nam Bộ has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects