Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 14B as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 8 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 134,055,242 VND, of which the total winning bid value is: 130,700,000 VND.
- The savings rate is: 2.50%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 14B as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 134,055,242 VND, in which the total winning value is: 130,700,000 VND.
- The savings rate is: 2.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON 14B are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 5 contractor selection plans, of which 2 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON 14B announced the results of the bid package Organize foreign language learning using supplementary software for students in the first and second grades .
- Winning bidder: EDUCATION SOLUTIONS VIET NAM COMPANY LIMITED
11/11/2025 08:30
TRƯỜNG MẦM NON 14B publishes the plan Providing foreign language learning services using supplementary software for students in the bud and leaf grades at Kindergarten 14B in the 2025-2026 school year with 1 bidding package .
11/11/2025 08:28
TRƯỜNG MẦM NON 14B announced the results of the bid package Providing milk in 2025-2026 for preschool 14B .
- Winning bidder: CÔNG TY TNHH SCHOOL NUTRITION METAMILK VN
15/09/2025 09:17
TRƯỜNG MẦM NON 14B publishes the plan Providing milk in 2025-2026 for preschool 14B with 1 bidding package .
15/09/2025 09:09
The Bid solicitor TRƯỜNG MẦM NON 14B has posted the results of the bidding package Problem supervision consultant of the investor TRƯỜNG MẦM NON 14B.
- Winning bidder: TRUNG LONG DESIGN CONSTRUCTION COMPANY LIMITED
04/09/2025 14:56
TRƯỜNG MẦM NON 14B announced the results of the bid package Civil Works .
- Winning bidder: QUAN KIM CONSULTANT CONSTRUCTION COMPANY LIMITED
29/08/2025 15:03
TRƯỜNG MẦM NON 14B announced the results of the bid package Buy food and goods of all kinds of 2025 - 2026 .
- Winning bidder: CÔNG TY TNHH THỰC PHẨM THIÊN HƯNG
18/08/2025 08:48
TRƯỜNG MẦM NON 14B publishes the plan Buy food and goods of all kinds for the school year 2025 - 2026 with 1 bidding package .
15/08/2025 16:59
The Bid solicitor TRƯỜNG MẦM NON 14B has posted the results of the bidding package Consulting on appraising bids and results of selection of construction packages for construction and installation of the investor TRƯỜNG MẦM NON 14B.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CTCONS
31/07/2025 11:38
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 14B announced the results of the bid package Problem supervision consultant .
- Winning bidder: TRUNG LONG DESIGN CONSTRUCTION COMPANY LIMITED
04/09/2025 14:56
TRƯỜNG MẦM NON 14B announced the results of the bid package Consulting on appraising bids and results of selection of construction packages for construction and installation .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CTCONS
31/07/2025 11:38
TRƯỜNG MẦM NON 14B announced the results of the bid package Consulting to compile bidding documents, evaluate bidding documents for construction and construction package .
- Winning bidder: NAM LONG CONSULTANTS - INVESTMENT -CONTRUCTION CO.,LTD
31/07/2025 11:32
TRƯỜNG MẦM NON 14B publishes the plan Repair of preschool 14B with 5 bidding package .
09/07/2025 08:46
TRƯỜNG MẦM NON 14B announced the results of the bid package Consultancy on verification of economic and technical reports .
- Winning bidder: HUNG THINH CONSTRUCTION AND INVESTMENT TM COMPANY LIMITED
29/05/2025 09:05
TRƯỜNG MẦM NON 14B announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: Liriver Construction Company Limited
29/05/2025 08:59
TRƯỜNG MẦM NON 14B announced the results of the bid package Project management consultancy .
- Winning bidder: NAM LONG CONSULTANTS - INVESTMENT -CONTRUCTION CO.,LTD
29/05/2025 08:56
TRƯỜNG MẦM NON 14B publishes the plan Plan for contractor selection of consulting packages in the preparation of investment projects for preschool repair works 14B with 3 bidding package .
22/05/2025 09:15
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 14B announced the results of the bid package Organize foreign language learning using supplementary software for students in the first and second grades .
- Winning bidder: EDUCATION SOLUTIONS VIET NAM COMPANY LIMITED
11/11/2025 08:30
TRƯỜNG MẦM NON 14B publishes the plan Providing foreign language learning services using supplementary software for students in the bud and leaf grades at Kindergarten 14B in the 2025-2026 school year with 1 bidding package .
11/11/2025 08:28
TRƯỜNG MẦM NON 14B announced the results of the bid package Providing milk in 2025-2026 for preschool 14B .
- Winning bidder: CÔNG TY TNHH SCHOOL NUTRITION METAMILK VN
15/09/2025 09:17
TRƯỜNG MẦM NON 14B publishes the plan Providing milk in 2025-2026 for preschool 14B with 1 bidding package .
15/09/2025 09:09
The Bid solicitor TRƯỜNG MẦM NON 14B has posted the results of the bidding package Problem supervision consultant of the investor TRƯỜNG MẦM NON 14B.
- Winning bidder: TRUNG LONG DESIGN CONSTRUCTION COMPANY LIMITED
04/09/2025 14:56
TRƯỜNG MẦM NON 14B announced the results of the bid package Civil Works .
- Winning bidder: QUAN KIM CONSULTANT CONSTRUCTION COMPANY LIMITED
29/08/2025 15:03
TRƯỜNG MẦM NON 14B announced the results of the bid package Buy food and goods of all kinds of 2025 - 2026 .
- Winning bidder: CÔNG TY TNHH THỰC PHẨM THIÊN HƯNG
18/08/2025 08:48
TRƯỜNG MẦM NON 14B publishes the plan Buy food and goods of all kinds for the school year 2025 - 2026 with 1 bidding package .
15/08/2025 16:59
The Bid solicitor TRƯỜNG MẦM NON 14B has posted the results of the bidding package Consulting on appraising bids and results of selection of construction packages for construction and installation of the investor TRƯỜNG MẦM NON 14B.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CTCONS
31/07/2025 11:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON 14B has posted 2 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON 14B has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON 14B has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON 14B has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON 14B has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects