Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non 3 as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 3 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 216,677,587 VND, of which the total winning bid value is: 216,581,248 VND.
- The savings rate is: 0.04%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non 3 as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 216,677,587 VND, in which the total winning value is: 216,581,248 VND.
- The savings rate is: 0.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non 3 are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 2 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm non 3 announced the results of the bid package Provide equipment and supplies for semi -boarding .
29/10/2025 16:20
Trường Mầm non 3 announced the results of the bid package Providing boarding supplies for the 2025 - 2026 school year .
- Winning bidder: HỘ KINH DOANH LÊ HIỀN
29/10/2025 16:20
Trường Mầm non 3 publishes the plan Approve the contractor selection plan. Procurement estimate: Providing boarding supplies; Equipment and supplies for boarding school year 2025 - 2026 with 2 bidding package .
29/10/2025 15:43
Trường Mầm non 3 announced the results of the bid package Procurement of goods: yogurt, fresh milk and dairy products, flan ice cream, cakes for meals for semi -boarding students .
09/09/2025 10:17
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Milk powder for meals for semi -boarding students .
09/09/2025 10:16
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Meat and products from meat, pate, eggs for meals for semi -boarding students .
09/09/2025 10:15
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Fresh food, dried food, pre -packed food, food additives for cooking, instant food, input materials to provide meals for semi -boarding students .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC LONG FOOD
09/09/2025 10:14
Trường Mầm non 3 publishes the plan Approving the plan to select the contractor for shopping estimates: Providing fresh food, dried food, pre -packaging food, food additives for cooking, instant food, input materials to provide meals for semi -boarding students in the school year 2025 - 2026 with 4 bidding package .
04/09/2025 15:39
The Bid solicitor Trường Mầm non 3 has posted the results of the bidding package Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) of the investor Trường Mầm non 3.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ TẤN HUY
11/07/2024 08:32
The Bid solicitor Trường Mầm non 3 has posted the request Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) of the investor Trường Mầm non 3 with 1 bidding package.
11/07/2024 08:30
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non 3 announced the results of the bid package Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ TẤN HUY
11/07/2024 08:32
Trường Mầm non 3 publishes the plan Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) with 1 bidding package .
11/07/2024 08:30
Trường Mầm non 3 announced the results of the bid package Project: Repairing Kindergarten 3.Item: Covering the parking lot and playground for children .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ TẤN HUY
16/03/2023 15:05
Trường Mầm non 3 publishes the plan Project: Repairing Kindergarten 3.Item: Covering the parking lot and playground for children with 1 bidding package .
16/03/2023 14:59
Trường Mầm non 3 announced the results of the bid package Repairing Kindergarten 3. Item: Replacing the tile floor in the reception hall, installing a washbasin, gluing heat-resistant panels to the roof in front of the accounting room .
- Winning bidder: Công ty TNHH Xây Dựng Thương Mại Dịch Vụ Tấn Huy
20/06/2022 15:22
Trường Mầm non 3 publishes the plan Repairing Kindergarten 3. Item: Replacing the tile floor in the reception hall, installing a washbasin, gluing heat-resistant panels to the roof in front of the accounting room with 1 bidding package .
20/06/2022 15:19
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non 3 announced the results of the bid package Provide equipment and supplies for semi -boarding .
29/10/2025 16:20
Trường Mầm non 3 announced the results of the bid package Providing boarding supplies for the 2025 - 2026 school year .
- Winning bidder: HỘ KINH DOANH LÊ HIỀN
29/10/2025 16:20
Trường Mầm non 3 publishes the plan Approve the contractor selection plan. Procurement estimate: Providing boarding supplies; Equipment and supplies for boarding school year 2025 - 2026 with 2 bidding package .
29/10/2025 15:43
Trường Mầm non 3 announced the results of the bid package Procurement of goods: yogurt, fresh milk and dairy products, flan ice cream, cakes for meals for semi -boarding students .
09/09/2025 10:17
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Milk powder for meals for semi -boarding students .
09/09/2025 10:16
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Meat and products from meat, pate, eggs for meals for semi -boarding students .
09/09/2025 10:15
Trường Mầm non 3 announced the results of the bid package Procurement of goods: Fresh food, dried food, pre -packed food, food additives for cooking, instant food, input materials to provide meals for semi -boarding students .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC LONG FOOD
09/09/2025 10:14
Trường Mầm non 3 publishes the plan Approving the plan to select the contractor for shopping estimates: Providing fresh food, dried food, pre -packaging food, food additives for cooking, instant food, input materials to provide meals for semi -boarding students in the school year 2025 - 2026 with 4 bidding package .
04/09/2025 15:39
The Bid solicitor Trường Mầm non 3 has posted the results of the bidding package Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) of the investor Trường Mầm non 3.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ TẤN HUY
11/07/2024 08:32
The Bid solicitor Trường Mầm non 3 has posted the request Repair of Kindergarten 3.Category: Roof repair and waterproofing; Handling and repairing cracked walls (3rd floor) of the investor Trường Mầm non 3 with 1 bidding package.
11/07/2024 08:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non 3 has posted 3 of the contractor selection plan, which contains 3 of the bidding package. See full list here
Summary: The Bid solicitor Trường Mầm non 3 has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non 3 has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm non 3 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects