Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Bắc Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 5 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 505,967,561 VND, of which the total winning bid value is: 505,967,561 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Bắc Sơn as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 505,967,561 VND, in which the total winning value is: 505,967,561 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non Bắc Sơn are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 8 contractor selection plans, of which 8 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 10:56
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 10:52
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 10:50
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 09:38
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Making a corrugated iron roof for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 08:28
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Making a corrugated iron roof for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 08:14
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Buy music equipment, equipment to familiarize yourself with information technology and foreign languages of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: SON TUNG ELECTRONICS COMPANY LIMITED
14/12/2024 10:51
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Buy music equipment, equipment to familiarize yourself with information technology and foreign languages of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
09/12/2024 10:15
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
28/11/2024 14:58
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
28/11/2024 14:56
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Bắc Sơn announced the results of the bid package Repairing the corrugated iron roof after the storm for Bac Son Kindergarten .
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 10:56
Trường Mầm non Bắc Sơn publishes the plan Repairing the corrugated iron roof after the storm for Bac Son Kindergarten with 1 bidding package .
17/12/2024 10:52
Trường Mầm non Bắc Sơn publishes the plan Repairing the corrugated iron roof after the storm for Bac Son Kindergarten with 1 bidding package .
17/12/2024 10:50
Trường Mầm non Bắc Sơn publishes the plan Repairing the corrugated iron roof after the storm for Bac Son Kindergarten with 1 bidding package .
17/12/2024 09:38
Trường Mầm non Bắc Sơn announced the results of the bid package Making a corrugated iron roof for Bac Son Kindergarten .
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 08:28
Trường Mầm non Bắc Sơn publishes the plan Making a corrugated iron roof for Bac Son Kindergarten with 1 bidding package .
17/12/2024 08:14
Trường Mầm non Bắc Sơn announced the results of the bid package Buy music equipment, equipment to familiarize yourself with information technology and foreign languages .
- Winning bidder: SON TUNG ELECTRONICS COMPANY LIMITED
14/12/2024 10:51
Trường Mầm non Bắc Sơn publishes the plan Buy music equipment, equipment to familiarize yourself with information technology and foreign languages with 1 bidding package .
09/12/2024 10:15
Trường Mầm non Bắc Sơn announced the results of the bid package Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras .
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
28/11/2024 14:58
Trường Mầm non Bắc Sơn publishes the plan Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras with 1 bidding package .
28/11/2024 14:56
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 10:56
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 10:52
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 10:50
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Repairing the corrugated iron roof after the storm for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 09:38
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Making a corrugated iron roof for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: HỘ KINH DOANH HOÀNG THỊ LOAN
17/12/2024 08:28
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Making a corrugated iron roof for Bac Son Kindergarten of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
17/12/2024 08:14
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Buy music equipment, equipment to familiarize yourself with information technology and foreign languages of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: SON TUNG ELECTRONICS COMPANY LIMITED
14/12/2024 10:51
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Buy music equipment, equipment to familiarize yourself with information technology and foreign languages of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
09/12/2024 10:15
The Bid solicitor Trường Mầm non Bắc Sơn has posted the results of the bidding package Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras of the investor Trường Mầm non Bắc Sơn.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
28/11/2024 14:58
The Bid solicitor Trường Mầm non Bắc Sơn has posted the request Shop for traditional room wall decorations, wardrobes, water heaters, electric fans, cameras of the investor Trường Mầm non Bắc Sơn with 1 bidding package.
28/11/2024 14:56
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non Bắc Sơn has posted 8 of the contractor selection plan, which contains 5 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm non Bắc Sơn has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non Bắc Sơn has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm non Bắc Sơn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects