Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HÒA LONG as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 6 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 448,084,000 VND, of which the total winning bid value is: 392,066,000 VND.
- The savings rate is: 12.50%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HÒA LONG as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 448,084,000 VND, in which the total winning value is: 392,066,000 VND.
- The savings rate is: 12.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON HÒA LONG are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 9 contractor selection plans, of which 6 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Supervision of construction and installation works: Maintaining and repairing tilted and cracked fence walls; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG T-CONS
29/11/2025 13:02
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Construction and installation works: Maintaining and repairing tilted and cracked fence walls; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY TNHH MÔI TRƯỜNG GREEN PHÚ AN
29/11/2025 12:57
TRƯỜNG MẦM NON HÒA LONG publishes the plan Construction and installation supervision: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten with 2 bidding package .
26/11/2025 16:22
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package number 3:
Buy yogurt to provide meals for boarding students for the 2025-2026 school year .
- Winning bidder: CÔNG TY VINH THẮNG - TNHH
17/11/2025 16:56
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Package No. 02: Purchasing gas to provide meals for boarding students for the 2025-2026 school year .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI BÌNH MINH BN
17/11/2025 16:51
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Package No. 01: Purchasing fresh food and input materials to provide meals for boarding students in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VIET ECO
17/11/2025 16:45
TRƯỜNG MẦM NON HÒA LONG publishes the plan Purchase food, raw materials, and fuel inputs to provide meals for boarding students in the 2025-2026 school year of Hoa Long Kindergarten with 3 bidding package .
17/11/2025 16:40
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Consulting on physical protection design and project estimates. Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
14/11/2025 17:11
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Consulting on design verification and project estimates: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG TÂN TRƯỜNG THỊNH
14/11/2025 17:10
TRƯỜNG MẦM NON HÒA LONG publishes the plan Consulting on preparing documents for maintenance and repair of public assets: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten with 2 bidding package .
10/11/2025 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Maintaining and repairing Hoa Long kindergarten's facilities. Category: Installing toilet partitions .
- Winning bidder: CÔNG TY CỔ PHẦN TRỌNG TÍN KINH BẮC
05/12/2024 10:07
TRƯỜNG MẦM NON HÒA LONG publishes the plan Maintaining and repairing Hoa Long kindergarten's facilities. Category: Installing toilet partitions with 1 bidding package .
27/11/2024 14:51
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package for purchasing outdoor sound equipment for Hoa Long Kindergarten .
- Winning bidder: Sao Viet Digiworld Company Limited
11/11/2024 11:22
TRƯỜNG MẦM NON HÒA LONG publishes the plan Plan for selecting a contractor for the outdoor sound equipment procurement package of Hoa Long Kindergarten with 1 bidding package .
05/11/2024 15:58
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package for purchasing teaching equipment for Hoa Long Kindergarten .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ ĐẦU TƯ CÔNG NGHỆ NAM VIỆT
24/09/2024 10:45
TRƯỜNG MẦM NON HÒA LONG publishes the plan Plan for selecting contractors for the procurement package of teaching equipment for Hoa Long Kindergarten with 1 bidding package .
20/09/2024 09:05
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package for purchasing tables and chairs for the 2023-2024 school year for Hoa Long Kindergarten .
- Winning bidder: CỬA HÀNG NỘI THẤT VÀ THIẾT BỊ GIÁO DỤC CÔNG MINH
20/12/2023 16:17
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package for procurement of equipment for Hoa Long Kindergarten in 2023 .
- Winning bidder: Sao Viet Digiworld Company Limited
19/12/2023 16:33
TRƯỜNG MẦM NON HÒA LONG publishes the plan Plan to select contractors for equipment procurement package for Hoa Long Kindergarten in 2023 with 1 bidding package .
19/12/2023 16:24
TRƯỜNG MẦM NON HÒA LONG announced the results of the bidding package Bidding package for purchasing tables and chairs for the 2023-2024 school year for Hoa Long Kindergarten with 2 participating contractors .
01/11/2023 10:53
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Supervision of construction and installation works: Maintaining and repairing tilted and cracked fence walls; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG T-CONS
29/11/2025 13:02
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Construction and installation works: Maintaining and repairing tilted and cracked fence walls; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY TNHH MÔI TRƯỜNG GREEN PHÚ AN
29/11/2025 12:57
TRƯỜNG MẦM NON HÒA LONG publishes the plan Construction and installation supervision: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten with 2 bidding package .
26/11/2025 16:22
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Bidding package number 3:
Buy yogurt to provide meals for boarding students for the 2025-2026 school year .
- Winning bidder: CÔNG TY VINH THẮNG - TNHH
17/11/2025 16:56
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Package No. 02: Purchasing gas to provide meals for boarding students for the 2025-2026 school year .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI BÌNH MINH BN
17/11/2025 16:51
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Package No. 01: Purchasing fresh food and input materials to provide meals for boarding students in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VIET ECO
17/11/2025 16:45
TRƯỜNG MẦM NON HÒA LONG publishes the plan Purchase food, raw materials, and fuel inputs to provide meals for boarding students in the 2025-2026 school year of Hoa Long Kindergarten with 3 bidding package .
17/11/2025 16:40
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Consulting on physical protection design and project estimates. Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
14/11/2025 17:11
TRƯỜNG MẦM NON HÒA LONG announced the results of the bid package Consulting on design verification and project estimates: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG TÂN TRƯỜNG THỊNH
14/11/2025 17:10
TRƯỜNG MẦM NON HÒA LONG publishes the plan Consulting on preparing documents for maintenance and repair of public assets: Maintaining and repairing tilted and cracked fences; Rebuild the car shed due to the impact of repairing the fence of Hoa Long Kindergarten with 2 bidding package .
10/11/2025 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON HÒA LONG has posted 6 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG MẦM NON HÒA LONG has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON HÒA LONG has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON HÒA LONG has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON HÒA LONG has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON HÒA LONG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects