Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Họa Mi as follows:
- Has relationships with 7 contractor.
- Announced 6 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 9 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 5 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,064,576,373 VND, of which the total winning bid value is: 1,040,686,373 VND.
- The savings rate is: 2.24%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Họa Mi as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,064,576,373 VND, in which the total winning value is: 1,040,686,373 VND.
- The savings rate is: 2.24%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 6 investment and development projects.
- As the owner of 7 Contractor selection plan in which 5 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 10 bidding packages in which 1 packages are self-invited, and 9 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trường Mầm non Họa Mi has posted the request Repairing the meeting room of Hoa Mi Kindergarten, Quang Dien commune of the investor Trường Mầm non Họa Mi with 3 bidding package.
16/10/2024 10:30
The Bid solicitor Trường Mầm non Họa Mi has posted the request Installing water filtration systems for classrooms of the investor Trường Mầm non Họa Mi with 3 bidding package.
03/10/2024 15:33
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten of the investor Trường Mầm non Họa Mi.
- Winning bidder: Trường Thành
24/06/2024 17:34
The Bid solicitor Trường Mầm non Họa Mi has posted the request Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten of the investor Trường Mầm non Họa Mi with 1 bidding package.
20/06/2024 13:46
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Construction supervision of the investor Trường Mầm non Họa Mi.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ KIẾN TRÚC VÀ XÂY DỰNG NGHI HÂN
17/08/2023 11:04
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Prepare Bidding Documents, evaluate bids for construction and installation bidding packages (short competitive offer) of the investor Trường Mầm non Họa Mi.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ GIÁM SÁT THI CÔNG XÂY DỰNG AN THỊNH
13/07/2023 14:44
Trường Mầm non Họa Mi Posted Development Investment Project Repairing and renovating Hoa Mi Kindergarten (base 1).
13/06/2023 11:11
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Construction drawing design - estimate of the investor Trường Mầm non Họa Mi.
10/05/2023 15:04
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor Trường Mầm non Họa Mi.
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
10/05/2023 15:03
Trường Mầm non Họa Mi Posted Development Investment Project Procurement of equipment for teaching and learning Hoa Mi Kindergarten.
09/08/2022 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Họa Mi publishes the plan Repairing the meeting room of Hoa Mi Kindergarten, Quang Dien commune with 3 bidding package .
16/10/2024 10:30
Trường Mầm non Họa Mi publishes the plan Installing water filtration systems for classrooms with 3 bidding package .
03/10/2024 15:33
Trường Mầm non Họa Mi announced the results of the bid package Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten .
- Winning bidder: Trường Thành
24/06/2024 17:34
Trường Mầm non Họa Mi publishes the plan Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten with 1 bidding package .
20/06/2024 13:46
Trường Mầm non Họa Mi announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ KIẾN TRÚC VÀ XÂY DỰNG NGHI HÂN
17/08/2023 11:04
Trường Mầm non Họa Mi announced the results of the bid package Prepare Bidding Documents, evaluate bids for construction and installation bidding packages (short competitive offer) .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ GIÁM SÁT THI CÔNG XÂY DỰNG AN THỊNH
13/07/2023 14:44
Trường Mầm non Họa Mi announced the results of the bid package Construction drawing design - estimate .
- Winning bidder: TRUNG MY CONSTRUCTION & INVESTMENT CONSULTING CO., LTD
10/05/2023 15:04
Trường Mầm non Họa Mi announced the results of the bid package Verification of construction drawing design and cost estimate .
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
10/05/2023 15:03
Trường Mầm non Họa Mi publishes the plan Procurement of equipment for teaching in 2022 of Hoa Mi 2 Kindergarten with 1 bidding package .
13/07/2022 22:23
Trường Mầm non Họa Mi announced the results of the bid package Tender package: Procurement of assets, teaching and learning equipment of Hoa Mi Kindergarten .
- Winning bidder: Công ty cổ phần Đầu tư phát triển văn hóa và đô thị
22/11/2019 19:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường Mầm non Họa Mi has posted the request Repairing the meeting room of Hoa Mi Kindergarten, Quang Dien commune of the investor Trường Mầm non Họa Mi with 3 bidding package.
16/10/2024 10:30
The Bid solicitor Trường Mầm non Họa Mi has posted the request Installing water filtration systems for classrooms of the investor Trường Mầm non Họa Mi with 3 bidding package.
03/10/2024 15:33
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten of the investor Trường Mầm non Họa Mi.
- Winning bidder: Trường Thành
24/06/2024 17:34
The Bid solicitor Trường Mầm non Họa Mi has posted the request Procurement of automatic fire alarm equipment in 2024 for Hoa Mi Kindergarten of the investor Trường Mầm non Họa Mi with 1 bidding package.
20/06/2024 13:46
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Construction supervision of the investor Trường Mầm non Họa Mi.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ KIẾN TRÚC VÀ XÂY DỰNG NGHI HÂN
17/08/2023 11:04
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Prepare Bidding Documents, evaluate bids for construction and installation bidding packages (short competitive offer) of the investor Trường Mầm non Họa Mi.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ GIÁM SÁT THI CÔNG XÂY DỰNG AN THỊNH
13/07/2023 14:44
Trường Mầm non Họa Mi Posted Development Investment Project Repairing and renovating Hoa Mi Kindergarten (base 1).
13/06/2023 11:11
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Construction drawing design - estimate of the investor Trường Mầm non Họa Mi.
10/05/2023 15:04
The Bid solicitor Trường Mầm non Họa Mi has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor Trường Mầm non Họa Mi.
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
10/05/2023 15:03
Trường Mầm non Họa Mi Posted Development Investment Project Procurement of equipment for teaching and learning Hoa Mi Kindergarten.
09/08/2022 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non Họa Mi has posted 6 of the contractor selection plan, which contains 9 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường Mầm non Họa Mi has posted 5 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm non Họa Mi has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non Họa Mi has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm non Họa Mi has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm non Họa Mi is the investor of 10 package, of which 1 package is self-invited, other units invite bid 9 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm non Họa Mi is the owner of 7 contractor selection plan. In which, they self-invite 5 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Trường Mầm non Họa Mi is an investor with 17 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm non Họa Mi is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register