Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HỒNG LÝ as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 6 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 830,061,868 VND, of which the total winning bid value is: 830,061,868 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HỒNG LÝ as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 830,061,868 VND, in which the total winning value is: 830,061,868 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON HỒNG LÝ are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 5 contractor selection plans, of which 5 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Works: Repairing, renovating and upgrading car plates of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
07/06/2025 13:41
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading car plates of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
07/06/2025 13:37
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Installing the roof of the teacher of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
10/05/2025 13:45
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request Installing the roof of the teacher of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
10/05/2025 13:42
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI HÀ NGUYÊN
11/04/2025 13:47
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Tender package No 01: Construction of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
11/04/2025 13:44
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading the school yard. of the investor TRƯỜNG MẦM NON HỒNG LÝ with 2 bidding package.
11/04/2025 13:37
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Sunshades of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Công ty TNHH Rèm Cửa Nội Thất Dũng Hương
29/03/2025 15:31
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request Sunshades of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
29/03/2025 15:11
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Installing and repairing corrugated iron roofs of the physical movement area of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
26/03/2025 16:01
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Works: Repairing, renovating and upgrading car plates .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
07/06/2025 13:41
TRƯỜNG MẦM NON HỒNG LÝ publishes the plan contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading car plates with 1 bidding package .
07/06/2025 13:37
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Installing the roof of the teacher .
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
10/05/2025 13:45
TRƯỜNG MẦM NON HỒNG LÝ publishes the plan Installing the roof of the teacher with 1 bidding package .
10/05/2025 13:42
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI HÀ NGUYÊN
11/04/2025 13:47
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Tender package No 01: Construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
11/04/2025 13:44
TRƯỜNG MẦM NON HỒNG LÝ publishes the plan contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading the school yard. with 2 bidding package .
11/04/2025 13:37
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Sunshades .
- Winning bidder: Công ty TNHH Rèm Cửa Nội Thất Dũng Hương
29/03/2025 15:31
TRƯỜNG MẦM NON HỒNG LÝ announced the results of the bid package Installing and repairing corrugated iron roofs of the physical movement area .
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
26/03/2025 16:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Works: Repairing, renovating and upgrading car plates of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
07/06/2025 13:41
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading car plates of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
07/06/2025 13:37
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Installing the roof of the teacher of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
10/05/2025 13:45
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request Installing the roof of the teacher of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
10/05/2025 13:42
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI HÀ NGUYÊN
11/04/2025 13:47
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Tender package No 01: Construction of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐĂNG BÌNH
11/04/2025 13:44
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request contractor selection plan, shopping estimate
Works: Repairing, renovating and upgrading the school yard. of the investor TRƯỜNG MẦM NON HỒNG LÝ with 2 bidding package.
11/04/2025 13:37
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Sunshades of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Công ty TNHH Rèm Cửa Nội Thất Dũng Hương
29/03/2025 15:31
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the request Sunshades of the investor TRƯỜNG MẦM NON HỒNG LÝ with 1 bidding package.
29/03/2025 15:11
The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted the results of the bidding package Installing and repairing corrugated iron roofs of the physical movement area of the investor TRƯỜNG MẦM NON HỒNG LÝ.
- Winning bidder: Hộ kinh doanh Nguyễn Minh Tiến
26/03/2025 16:01
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON HỒNG LÝ has posted 5 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON HỒNG LÝ has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON HỒNG LÝ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects