Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Kim Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 14 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 793,479,000 VND, of which the total winning bid value is: 791,259,000 VND.
- The savings rate is: 0.28%.
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Kim Sơn as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 793,479,000 VND, in which the total winning value is: 791,259,000 VND.
- The savings rate is: 0.28%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường mầm non Kim Sơn are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 10 contractor selection plans, of which 8 were self-published, and 2 were published by other entities.
- Is the investor of 3 Tender Notices, of which 2 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường mầm non Kim Sơn announced the results of the bid package Providing food and food for semi-boarding meals in the school year 2025-2026 of Kim Son MN School .
- Winning bidder: Hợp tác xã sản xuất và tiêu thụ nông sản sạch viên sơn
05/09/2025 16:41
Trường mầm non Kim Sơn announced the results of the bid package Provide gas boiling for semi-boarding cooking year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: Hộ kinh doanh Nguyễn Đức Thanh
05/09/2025 16:35
Trường mầm non Kim Sơn announced the results of the bid package Providing milk for semi-boarding student meals in the school year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: Công ty cổ phần chế biến sữa Ba Vì
05/09/2025 09:29
Trường mầm non Kim Sơn announced the results of the bid package Supplying bottles for students in the school year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: TUAN CUONG JOINT STOCK COMPANY
05/09/2025 09:16
Trường mầm non Kim Sơn publishes the plan Plan for selecting contractors to supply fuel food for semi-boarding food in the school year 2025-2026 of Kim Son Kindergarten with 4 bidding package .
04/09/2025 08:00
Trường mầm non Kim Sơn publishes the plan Plan for selecting contractors to supply fuel food for semi-boarding food in the school year 2025-2026 of Kim Son Kindergarten with 4 bidding package .
29/08/2025 22:45
The Bid solicitor DONG VY COMPANY LIMITED has posted the results of the bidding package Equipment Purchasing of the investor Trường mầm non Kim Sơn.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN SẢN XUẤT THƯƠNG MẠI MINH TƯỜNG PHÁT
11/12/2024 20:37
The Bid solicitor Trường mầm non Kim Sơn has posted the results of the bidding package Construction costs of the investor Trường mầm non Kim Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI XUÂN TRÂM ANH
05/12/2024 15:26
The Bid solicitor Trường mầm non Kim Sơn has posted the request Contractor selection plan Project: Repairing door systems of functional rooms, warehouses, bedrooms (children) in the central area and auxiliary works in Dong Lay area, Kim Son kindergarten, Luc Ngan district, province Bac Giang of the investor Trường mầm non Kim Sơn with 1 bidding package.
05/12/2024 15:23
Bid solicitor DONG VY COMPANY LIMITED has posted Tender Notice Equipment Purchasing of the investor Trường mầm non Kim Sơn with the form Competitive Offer.
18/11/2024 20:49
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Kim Sơn announced the results of the bid package Construction costs .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI XUÂN TRÂM ANH
05/12/2024 15:26
Trường mầm non Kim Sơn publishes the plan Contractor selection plan Project: Repairing door systems of functional rooms, warehouses, bedrooms (children) in the central area and auxiliary works in Dong Lay area, Kim Son kindergarten, Luc Ngan district, province Bac Giang with 1 bidding package .
05/12/2024 15:23
Trường mầm non Kim Sơn publishes the plan Shopping for electronic equipment and wooden furniture with 3 bidding package .
11/11/2024 20:46
Trường mầm non Kim Sơn publishes the plan Shopping for electronic equipment and wooden furniture with 1 bidding package .
08/11/2024 11:00
Trường mầm non Kim Sơn publishes the plan Choosing a contractor Renew sun protection blinds, anti-insect net for the kitchen area, paint the front wall with 1 bidding package .
08/11/2024 08:59
Trường mầm non Kim Sơn publishes the plan Bidding package for making sun protection curtains for the back porch of classes in 2024 with 1 bidding package .
08/11/2024 08:53
Trường mầm non Kim Sơn publishes the plan Choosing a contractor to construct and decorate artificial grass, supply pebbles and decorative gravel with 1 bidding package .
08/11/2024 08:49
Trường mầm non Kim Sơn announced the results of the bid package Package 06: Supply and installation of projectors .
- Winning bidder: Trung Tâm Thương Mại Và Viễn Thông Osaka
27/01/2022 16:05
Trường mầm non Kim Sơn announced the results of the bidding package Package 06: Supply and installation of projectors with 2 participating contractors .
17/12/2021 21:15
Trường mầm non Kim Sơn publishes Tender Notice Package 06: Supply and installation of projectors in the form National Competitive Bidding .
10/12/2021 21:01
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Kim Sơn announced the results of the bid package Providing food and food for semi-boarding meals in the school year 2025-2026 of Kim Son MN School .
- Winning bidder: Hợp tác xã sản xuất và tiêu thụ nông sản sạch viên sơn
05/09/2025 16:41
Trường mầm non Kim Sơn announced the results of the bid package Provide gas boiling for semi-boarding cooking year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: Hộ kinh doanh Nguyễn Đức Thanh
05/09/2025 16:35
Trường mầm non Kim Sơn announced the results of the bid package Providing milk for semi-boarding student meals in the school year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: Công ty cổ phần chế biến sữa Ba Vì
05/09/2025 09:29
Trường mầm non Kim Sơn announced the results of the bid package Supplying bottles for students in the school year 2025-2026 of Kim Son Kindergarten .
- Winning bidder: TUAN CUONG JOINT STOCK COMPANY
05/09/2025 09:16
Trường mầm non Kim Sơn publishes the plan Plan for selecting contractors to supply fuel food for semi-boarding food in the school year 2025-2026 of Kim Son Kindergarten with 4 bidding package .
04/09/2025 08:00
Trường mầm non Kim Sơn publishes the plan Plan for selecting contractors to supply fuel food for semi-boarding food in the school year 2025-2026 of Kim Son Kindergarten with 4 bidding package .
29/08/2025 22:45
The Bid solicitor DONG VY COMPANY LIMITED has posted the results of the bidding package Equipment Purchasing of the investor Trường mầm non Kim Sơn.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN SẢN XUẤT THƯƠNG MẠI MINH TƯỜNG PHÁT
11/12/2024 20:37
The Bid solicitor Trường mầm non Kim Sơn has posted the results of the bidding package Construction costs of the investor Trường mầm non Kim Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI XUÂN TRÂM ANH
05/12/2024 15:26
The Bid solicitor Trường mầm non Kim Sơn has posted the request Contractor selection plan Project: Repairing door systems of functional rooms, warehouses, bedrooms (children) in the central area and auxiliary works in Dong Lay area, Kim Son kindergarten, Luc Ngan district, province Bac Giang of the investor Trường mầm non Kim Sơn with 1 bidding package.
05/12/2024 15:23
Bid solicitor DONG VY COMPANY LIMITED has posted Tender Notice Equipment Purchasing of the investor Trường mầm non Kim Sơn with the form Competitive Offer.
18/11/2024 20:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường mầm non Kim Sơn has posted 8 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường mầm non Kim Sơn has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường mầm non Kim Sơn has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường mầm non Kim Sơn has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường mầm non Kim Sơn has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường mầm non Kim Sơn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects