Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON LỘC THÀNH B as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 99,500,000 VND, of which the total winning bid value is: 99,500,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON LỘC THÀNH B as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 99,500,000 VND, in which the total winning value is: 99,500,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON LỘC THÀNH B are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 1 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package All construction costs .
- Winning bidder: CỬA HÀNG GIA HUY
30/12/2025 15:26
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package Consulting and Supervision of construction works .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN KIẾN TRÚC CAO NGUYÊN XANH
30/12/2025 15:23
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package Construction project management consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ DỊCH VỤ MINH HOÀNG LN
30/12/2025 15:18
TRƯỜNG MẦM NON LỘC THÀNH B publishes the plan Well drilling and installation of crude filter system at Loc Thanh B Kindergarten with 3 bidding package .
17/12/2025 14:38
The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has posted the results of the bidding package Package No. 01: Supply installation of the main field water filtration system of the investor TRƯỜNG MẦM NON LỘC THÀNH B.
- Winning bidder: BẢO THÁI
10/04/2025 21:56
The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has posted the request Provide installation of main school water filtration system of the investor TRƯỜNG MẦM NON LỘC THÀNH B with 1 bidding package.
10/04/2025 21:50
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package Package No. 01: Supply installation of the main field water filtration system .
- Winning bidder: BẢO THÁI
10/04/2025 21:56
TRƯỜNG MẦM NON LỘC THÀNH B publishes the plan Provide installation of main school water filtration system with 1 bidding package .
10/04/2025 21:50
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package All construction costs .
- Winning bidder: CỬA HÀNG GIA HUY
30/12/2025 15:26
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package Consulting and Supervision of construction works .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN KIẾN TRÚC CAO NGUYÊN XANH
30/12/2025 15:23
TRƯỜNG MẦM NON LỘC THÀNH B announced the results of the bid package Construction project management consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ DỊCH VỤ MINH HOÀNG LN
30/12/2025 15:18
TRƯỜNG MẦM NON LỘC THÀNH B publishes the plan Well drilling and installation of crude filter system at Loc Thanh B Kindergarten with 3 bidding package .
17/12/2025 14:38
The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has posted the results of the bidding package Package No. 01: Supply installation of the main field water filtration system of the investor TRƯỜNG MẦM NON LỘC THÀNH B.
- Winning bidder: BẢO THÁI
10/04/2025 21:56
The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has posted the request Provide installation of main school water filtration system of the investor TRƯỜNG MẦM NON LỘC THÀNH B with 1 bidding package.
10/04/2025 21:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON LỘC THÀNH B has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON LỘC THÀNH B has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON LỘC THÀNH B has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects