Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON MẠ NON as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 1 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 12 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 178,964,526 VND, of which the total winning bid value is: 178,964,405 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON MẠ NON as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 178,964,526 VND, in which the total winning value is: 178,964,405 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON MẠ NON are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 3 were self-published, and 2 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON MẠ NON publishes the plan Supplying cakes and fermented dairy products with 1 bidding package .
09/10/2025 08:48
TRƯỜNG MẦM NON MẠ NON publishes the plan Providing food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 with 1 bidding package .
08/10/2025 10:43
The Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted the results of the bidding package Device of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI GIA BẢO A.B
15/09/2023 17:13
Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted Tender Notice Device of the investor TRƯỜNG MẦM NON MẠ NON with the form Competitive Offer.
18/08/2023 15:00
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the request Ma Non Kindergarten of the investor TRƯỜNG MẦM NON MẠ NON with 5 bidding package.
18/08/2023 11:18
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the request Project: Ma Non Kindergarten of the investor TRƯỜNG MẦM NON MẠ NON with 1 bidding package.
24/07/2023 10:19
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package The plan to select a contractor to repair and build new plasterboard ceilings in Ma Non Kindergarten classrooms of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: SONG GIANH SAI GON CONTRUCTION COMPANY LIMITED
18/04/2023 14:36
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Construction supervision consultancy of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/12/2022 10:51
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: Công ty CP tư vấn đầu tư và phát triển công nghệ Nam Sài Gòn
28/09/2022 10:08
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Prepare economic and technical reports of the investor TRƯỜNG MẦM NON MẠ NON.
16/09/2022 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON MẠ NON publishes the plan Ma Non Kindergarten with 5 bidding package .
18/08/2023 11:18
TRƯỜNG MẦM NON MẠ NON publishes the plan Project: Ma Non Kindergarten with 1 bidding package .
24/07/2023 10:19
TRƯỜNG MẦM NON MẠ NON announced the results of the bid package The plan to select a contractor to repair and build new plasterboard ceilings in Ma Non Kindergarten classrooms .
- Winning bidder: SONG GIANH SAI GON CONTRUCTION COMPANY LIMITED
18/04/2023 14:36
TRƯỜNG MẦM NON MẠ NON publishes the plan The plan to select a contractor to repair and build new plasterboard ceilings in Ma Non Kindergarten classrooms with 1 bidding package .
14/04/2023 15:27
TRƯỜNG MẦM NON MẠ NON announced the results of the bid package Construction supervision consultancy .
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/12/2022 10:51
TRƯỜNG MẦM NON MẠ NON publishes the plan Plan to select contractor for repair and renovation works of Ma Non Kindergarten (Project implementation phase) with 3 bidding package .
05/12/2022 09:20
TRƯỜNG MẦM NON MẠ NON announced the results of the bid package Verification of construction drawing design and cost estimate .
- Winning bidder: Công ty CP tư vấn đầu tư và phát triển công nghệ Nam Sài Gòn
28/09/2022 10:08
TRƯỜNG MẦM NON MẠ NON announced the results of the bid package Prepare economic and technical reports .
- Winning bidder: Công ty TNHH Tư vấn đầu tư và xây dựng Trung Mỹ
16/09/2022 17:49
TRƯỜNG MẦM NON MẠ NON announced the results of the bid package Project management consultancy .
- Winning bidder: Công ty TNHH Tư vấn Thiết kế và Xây dựng Song Hoàng
16/09/2022 17:41
TRƯỜNG MẦM NON MẠ NON publishes the plan The plan to select contractors for the repair and renovation works of Ma Non Kindergarten with 3 bidding package .
14/09/2022 15:52
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON MẠ NON publishes the plan Supplying cakes and fermented dairy products with 1 bidding package .
09/10/2025 08:48
TRƯỜNG MẦM NON MẠ NON publishes the plan Providing food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 with 1 bidding package .
08/10/2025 10:43
The Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted the results of the bidding package Device of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI GIA BẢO A.B
15/09/2023 17:13
Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted Tender Notice Device of the investor TRƯỜNG MẦM NON MẠ NON with the form Competitive Offer.
18/08/2023 15:00
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the request Ma Non Kindergarten of the investor TRƯỜNG MẦM NON MẠ NON with 5 bidding package.
18/08/2023 11:18
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the request Project: Ma Non Kindergarten of the investor TRƯỜNG MẦM NON MẠ NON with 1 bidding package.
24/07/2023 10:19
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package The plan to select a contractor to repair and build new plasterboard ceilings in Ma Non Kindergarten classrooms of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: SONG GIANH SAI GON CONTRUCTION COMPANY LIMITED
18/04/2023 14:36
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Construction supervision consultancy of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/12/2022 10:51
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor TRƯỜNG MẦM NON MẠ NON.
- Winning bidder: Công ty CP tư vấn đầu tư và phát triển công nghệ Nam Sài Gòn
28/09/2022 10:08
The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted the results of the bidding package Prepare economic and technical reports of the investor TRƯỜNG MẦM NON MẠ NON.
16/09/2022 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON MẠ NON has posted 5 of the contractor selection plan, which contains 12 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON MẠ NON has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON MẠ NON has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON MẠ NON has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects