Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Mỹ Thạnh An as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 8 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Mỹ Thạnh An as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm Non Mỹ Thạnh An are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 3 were self-published, and 2 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide milk powder .
24/09/2025 21:33
Trường Mầm Non Mỹ Thạnh An publishes the plan Estimated and planning planning plan to adjust food to serve the semi-boarding work in 2025-2026 of My Thanh An Kindergarten with 6 bidding package .
24/09/2025 21:25
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply fresh food, food ingredients, hygienic detergents .
- Winning bidder: Công ty TMHH MTV Sản xuất-Thương mại Cô Gẩm
06/09/2025 11:03
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply food, food ingredients .
- Winning bidder: Cửa hàng Lương thực và Bách hóa tổng hợp Đăng Khoa
06/09/2025 10:58
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide cooking gas .
- Winning bidder: Công ty TNHH MTV Thuận Bảo Gas
06/09/2025 10:54
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply yogurt .
- Winning bidder: Nhà phân phối Thuận Điền
06/09/2025 10:49
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide drinking water and cooking .
- Winning bidder: Công ty TNHH Kỹ thuật & Môi trường KIM VÂN SƠN
06/09/2025 10:40
Trường Mầm Non Mỹ Thạnh An publishes the plan Estimates and plans to select food contractors for food for semi-boarding in 2025-2026 of My Thanh An Kindergarten with 6 bidding package .
04/09/2025 16:49
The Bid solicitor CAT AN BIDDING CONSULTING COMPANY LIMITTED has posted the results of the bidding package Construction of the investor Trường Mầm Non Mỹ Thạnh An.
- Winning bidder: Công ty TNHH Xây dựng và Thương mại Hải Vân
06/11/2024 17:02
Bid solicitor CAT AN BIDDING CONSULTING COMPANY LIMITTED has posted Tender Notice Construction of the investor Trường Mầm Non Mỹ Thạnh An with the form Open bidding.
16/09/2024 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Mỹ Thạnh An publishes the plan contractor selection plan
Project: Repairing My Thanh An Kindergarten; Items: Reinforcing the frame, roofing with corrugated iron to cover the school yard, treating cracks on the back wall, painting the outside wall with 6 bidding package .
15/08/2024 16:12
Trường Mầm Non Mỹ Thạnh An publishes the plan Project: Repairing My Thanh An Kindergarten; Item: Waterproofing roof, reinforcing processing area floor with 2 bidding package .
25/09/2023 09:52
Trường Mầm Non Mỹ Thạnh An publishes the plan Project: Repairing My Thanh An Kindergarten; Item: Waterproofing roof, reinforcing processing area floor with 2 bidding package .
25/09/2023 09:50
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide milk powder .
24/09/2025 21:33
Trường Mầm Non Mỹ Thạnh An publishes the plan Estimated and planning planning plan to adjust food to serve the semi-boarding work in 2025-2026 of My Thanh An Kindergarten with 6 bidding package .
24/09/2025 21:25
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply fresh food, food ingredients, hygienic detergents .
- Winning bidder: Công ty TMHH MTV Sản xuất-Thương mại Cô Gẩm
06/09/2025 11:03
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply food, food ingredients .
- Winning bidder: Cửa hàng Lương thực và Bách hóa tổng hợp Đăng Khoa
06/09/2025 10:58
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide cooking gas .
- Winning bidder: Công ty TNHH MTV Thuận Bảo Gas
06/09/2025 10:54
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Supply yogurt .
- Winning bidder: Nhà phân phối Thuận Điền
06/09/2025 10:49
Trường Mầm Non Mỹ Thạnh An announced the results of the bid package Provide drinking water and cooking .
- Winning bidder: Công ty TNHH Kỹ thuật & Môi trường KIM VÂN SƠN
06/09/2025 10:40
Trường Mầm Non Mỹ Thạnh An publishes the plan Estimates and plans to select food contractors for food for semi-boarding in 2025-2026 of My Thanh An Kindergarten with 6 bidding package .
04/09/2025 16:49
The Bid solicitor CAT AN BIDDING CONSULTING COMPANY LIMITTED has posted the results of the bidding package Construction of the investor Trường Mầm Non Mỹ Thạnh An.
- Winning bidder: Công ty TNHH Xây dựng và Thương mại Hải Vân
06/11/2024 17:02
Bid solicitor CAT AN BIDDING CONSULTING COMPANY LIMITTED has posted Tender Notice Construction of the investor Trường Mầm Non Mỹ Thạnh An with the form Open bidding.
16/09/2024 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm Non Mỹ Thạnh An has posted 3 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor Trường Mầm Non Mỹ Thạnh An has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm Non Mỹ Thạnh An has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects