Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON NAM HÀ as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 15 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,585,657,000 VND, of which the total winning bid value is: 1,577,948,000 VND.
- The savings rate is: 0.49%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON NAM HÀ as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,585,657,000 VND, in which the total winning value is: 1,577,948,000 VND.
- The savings rate is: 0.49%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON NAM HÀ are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 4 contractor selection plans, of which 3 were self-published, and 1 were published by other entities.
- Is the investor of 2 Tender Notices, of which 1 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH NĂNG LƯỢNG NAM PHẠM
31/10/2025 20:27
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THƯƠNG MẠI PHƯƠNG TRANG
28/10/2025 21:43
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY CỔ PHẦN GIẢI PHÁP DINH DƯỠNG FINDKOSTS
28/10/2025 21:30
TRƯỜNG MẦM NON NAM HÀ publishes the plan Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year with 3 bidding package .
24/10/2025 11:47
The Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ.
- Winning bidder: AT TRADING CONSTRUCTION INTERNATIONAL JOINT STOCK COMPANY
30/11/2024 10:32
Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ with the form Competitive Offer.
16/11/2024 17:04
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the request Repair damage to facilities caused by storm No. 3 at Nam Ha Kindergarten of the investor TRƯỜNG MẦM NON NAM HÀ with 5 bidding package.
15/11/2024 16:21
Investor TRƯỜNG MẦM NON NAM HÀ has posted an investment and development project Repair damage to facilities caused by storm No. 3 at Nam Ha Kindergarten.
15/11/2024 15:15
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ.
- Winning bidder: GIA PHAM CONSTRUCTION AND TRADE INVESTMENT JOINT STOCK COMPANY
10/08/2023 14:34
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the request Construction contractor selection plan: Repairing the roof system, door, kitchen and some rooms of Nam Ha Kindergarten of the investor TRƯỜNG MẦM NON NAM HÀ with 5 bidding package.
07/08/2023 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON NAM HÀ publishes the plan Repair damage to facilities caused by storm No. 3 at Nam Ha Kindergarten with 5 bidding package .
15/11/2024 16:21
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Civil Works .
- Winning bidder: GIA PHAM CONSTRUCTION AND TRADE INVESTMENT JOINT STOCK COMPANY
10/08/2023 14:34
TRƯỜNG MẦM NON NAM HÀ publishes the plan Construction contractor selection plan: Repairing the roof system, door, kitchen and some rooms of Nam Ha Kindergarten with 5 bidding package .
07/08/2023 14:33
TRƯỜNG MẦM NON NAM HÀ announced the results of the bidding package Civil Works with 1 participating contractors .
01/08/2023 15:06
TRƯỜNG MẦM NON NAM HÀ publishes Tender Notice Civil Works in the form Competitive Offer .
25/07/2023 14:26
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package HSYC appraisal consultancy, appraisal of construction contractor selection results .
- Winning bidder: THANH LONG CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
25/07/2023 11:42
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Consulting on setting up HSYC, evaluating bidding documents for construction and installation packages .
- Winning bidder: DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY
25/07/2023 11:38
TRƯỜNG MẦM NON NAM HÀ publishes the plan Silk plan to select the construction contractor: Repairing the roof system, door, kitchen and some rooms of Nam Ha Kindergarten with 5 bidding package .
20/07/2023 10:07
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH NĂNG LƯỢNG NAM PHẠM
31/10/2025 20:27
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THƯƠNG MẠI PHƯƠNG TRANG
28/10/2025 21:43
TRƯỜNG MẦM NON NAM HÀ announced the results of the bid package Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year .
- Winning bidder: CÔNG TY CỔ PHẦN GIẢI PHÁP DINH DƯỠNG FINDKOSTS
28/10/2025 21:30
TRƯỜNG MẦM NON NAM HÀ publishes the plan Procurement of food, nutritional products (Grow plus powdered milk), ingredients, GAS fuel to serve boarding children at Nam Ha Kindergarten in the 2025-2026 school year with 3 bidding package .
24/10/2025 11:47
The Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ.
- Winning bidder: AT TRADING CONSTRUCTION INTERNATIONAL JOINT STOCK COMPANY
30/11/2024 10:32
Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ with the form Competitive Offer.
16/11/2024 17:04
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the request Repair damage to facilities caused by storm No. 3 at Nam Ha Kindergarten of the investor TRƯỜNG MẦM NON NAM HÀ with 5 bidding package.
15/11/2024 16:21
Investor TRƯỜNG MẦM NON NAM HÀ has posted an investment and development project Repair damage to facilities caused by storm No. 3 at Nam Ha Kindergarten.
15/11/2024 15:15
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON NAM HÀ.
- Winning bidder: GIA PHAM CONSTRUCTION AND TRADE INVESTMENT JOINT STOCK COMPANY
10/08/2023 14:34
The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted the request Construction contractor selection plan: Repairing the roof system, door, kitchen and some rooms of Nam Ha Kindergarten of the investor TRƯỜNG MẦM NON NAM HÀ with 5 bidding package.
07/08/2023 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON NAM HÀ has posted 3 of the contractor selection plan, which contains 15 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON NAM HÀ has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON NAM HÀ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects