Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Phong Minh as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 4 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 600,000 VND, of which the total winning bid value is: 600,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Phong Minh as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 600,000 VND, in which the total winning value is: 600,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường mầm non Phong Minh are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 2 contractor selection plans, of which 1 were self-published, and 1 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Trường mầm non Phong Minh has posted an investment and development project Fired the roof of the processing area, the garage of Na Lang area and waterproofed the central area of Sa Ly kindergarten No. 1.
18/12/2025 23:23
Trường mầm non Phong Minh announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI HIẾU LINH
18/12/2025 23:17
Trường mầm non Phong Minh publishes the plan Project contractor selection plan: Roofing of preliminary processing area, garage of Na Lang area and waterproofing of central area of Sa Ly kindergarten No. 1 with 1 bidding package .
18/12/2025 23:14
The Bid solicitor NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction work: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYÊN NINH
08/11/2024 16:17
Bid solicitor NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction work: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh with the form Competitive Offer.
11/10/2024 14:43
The Bid solicitor Trường mầm non Phong Minh has posted the results of the bidding package Consulting on preparation of bidding documents, evaluation of bidding documents: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh.
- Winning bidder: NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
11/10/2024 13:38
The Bid solicitor Trường mầm non Phong Minh has posted the request Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace the toilets of the teachers' and students' restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in the Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh with 4 bidding package.
23/09/2024 14:30
Investor Trường mầm non Phong Minh has posted an investment and development project Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace the toilets of the teachers' and students' restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in the Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province.
23/09/2024 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Phong Minh announced the results of the bid package Consulting on preparation of bidding documents, evaluation of bidding documents: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province .
- Winning bidder: NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
11/10/2024 13:38
Trường mầm non Phong Minh publishes the plan Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace the toilets of the teachers' and students' restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in the Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province with 4 bidding package .
23/09/2024 14:30
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Trường mầm non Phong Minh has posted an investment and development project Fired the roof of the processing area, the garage of Na Lang area and waterproofed the central area of Sa Ly kindergarten No. 1.
18/12/2025 23:23
Trường mầm non Phong Minh announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI HIẾU LINH
18/12/2025 23:17
Trường mầm non Phong Minh publishes the plan Project contractor selection plan: Roofing of preliminary processing area, garage of Na Lang area and waterproofing of central area of Sa Ly kindergarten No. 1 with 1 bidding package .
18/12/2025 23:14
The Bid solicitor NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction work: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYÊN NINH
08/11/2024 16:17
Bid solicitor NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction work: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh with the form Competitive Offer.
11/10/2024 14:43
The Bid solicitor Trường mầm non Phong Minh has posted the results of the bidding package Consulting on preparation of bidding documents, evaluation of bidding documents: Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace toilets in teacher and student restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh.
- Winning bidder: NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
11/10/2024 13:38
The Bid solicitor Trường mầm non Phong Minh has posted the request Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace the toilets of the teachers' and students' restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in the Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province of the investor Trường mầm non Phong Minh with 4 bidding package.
23/09/2024 14:30
Investor Trường mầm non Phong Minh has posted an investment and development project Waterproofing the porch on the 2nd floor of the classroom building in the central area, Lime painting and repairing all classroom walls and rims in the central area, Giang area, Na Lang area; Replace the toilets of the teachers' and students' restrooms in the central area; Renovating the food storage warehouse in the central area; Shooting the roof of the car in the Giang area of Phong Minh kindergarten, Luc Ngan district, Bac Giang province.
23/09/2024 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường mầm non Phong Minh has posted 1 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor Trường mầm non Phong Minh has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường mầm non Phong Minh has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường mầm non Phong Minh has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects