Data analysis results of DauThau.info software for bid solicitors Trường mầm non Sao Mai as follows:
- Has relationships with 1 project owners.
- Has relationships with 14 contractor.
- Announced 3 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 20 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 12 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 57.14%, Construction 42.86%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,739,528,000 VND, of which the total winning bid value is: 4,733,258,000 VND.
- The savings rate is: 0.13%.
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Sao Mai as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 57.14%, Construction 42.86%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,739,528,000 VND, in which the total winning value is: 4,733,258,000 VND.
- The savings rate is: 0.13%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường mầm non Sao Mai are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 10 contractor selection plans, of which 7 were self-published, and 3 were published by other entities.
- Is the investor of 7 Tender Notices, of which 4 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường mầm non Sao Mai publishes the plan Estimation "Buy food, food, raw materials, inputs to provide meals, school meals" at Sao Mai Kindergarten with 1 bidding package .
12/09/2025 15:59
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG MINH HƯNG HÀ GIANG has posted the results of the bidding package Tender package No 03: Construction of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN ANH DŨNG HÀ GIANG
31/12/2024 16:17
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG MINH HƯNG HÀ GIANG has posted Tender Notice Tender package No 03: Construction of the investor Trường mầm non Sao Mai with the form Competitive Offer.
21/10/2024 19:25
The Bid solicitor Trường mầm non Sao Mai has posted the results of the bidding package Repairing toilets at Tha Mang village school of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TIẾN ĐẠT KS
16/10/2024 14:53
The Bid solicitor Trường mầm non Sao Mai has posted the request LCNT plan to repair the school toilet in Tha Mang village of the investor Trường mầm non Sao Mai with 1 bidding package.
16/10/2024 14:28
The Bid solicitor H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted the results of the bidding package Construction and Repair of Sao Mai Primary School of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TNHH THẠNH MINH VY
09/10/2024 14:24
The Bid solicitor Trường mầm non Sao Mai has posted the request Approving the contractor selection plan of the investor Trường mầm non Sao Mai with 3 bidding package.
08/10/2024 17:15
Investor Trường mầm non Sao Mai has posted an investment and development project Sao Mai Kindergarten, Ha Giang City. Category: Renovating and replacing the roof of a 2-story classroom..
08/10/2024 16:16
Bid solicitor H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted Tender Notice Construction and Repair of Sao Mai Primary School of the investor Trường mầm non Sao Mai with the form Competitive Offer.
20/07/2024 09:38
The Bid solicitor Trường mầm non Sao Mai has posted the request Repairing Sao Mai Kindergarten of the investor Trường mầm non Sao Mai with 5 bidding package.
20/07/2024 08:24
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Sao Mai announced the results of the bid package Repairing toilets at Tha Mang village school .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TIẾN ĐẠT KS
16/10/2024 14:53
Trường mầm non Sao Mai publishes the plan LCNT plan to repair the school toilet in Tha Mang village with 1 bidding package .
16/10/2024 14:28
Trường mầm non Sao Mai publishes the plan Approving the contractor selection plan with 3 bidding package .
08/10/2024 17:15
Trường mầm non Sao Mai publishes the plan Repairing Sao Mai Kindergarten with 5 bidding package .
20/07/2024 08:24
Trường mầm non Sao Mai publishes the plan LCNT Plan to Repair Sao Mai Kindergarten (hamlet 8) with 5 bidding package .
21/12/2023 09:57
Trường mầm non Sao Mai publishes the plan Repair classrooms with 1 bidding package .
17/11/2023 08:59
Trường mầm non Sao Mai publishes the plan Repairing some items of school facilities to ensure national standards, Sao Mai Kindergarten with 2 bidding package .
05/07/2022 17:04
Trường mầm non Sao Mai announced the results of the bid package Shopping for student cafeteria tables and chairs .
- Winning bidder: Hộ kinh doanh Cơ sở thiết bị văn phòng Đức Thành
22/01/2020 15:15
Trường mầm non Sao Mai announced the results of the bid package Supply and installation of construction equipment .
- Winning bidder: Công ty TNHH thiết bị giáo dục Hà Lân
13/03/2019 11:32
Trường mầm non Sao Mai publishes Tender Notice Supply and installation of construction equipment in the form National Competitive Bidding .
14/02/2019 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Sao Mai publishes the plan Estimation "Buy food, food, raw materials, inputs to provide meals, school meals" at Sao Mai Kindergarten with 1 bidding package .
12/09/2025 15:59
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG MINH HƯNG HÀ GIANG has posted the results of the bidding package Tender package No 03: Construction of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN ANH DŨNG HÀ GIANG
31/12/2024 16:17
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG MINH HƯNG HÀ GIANG has posted Tender Notice Tender package No 03: Construction of the investor Trường mầm non Sao Mai with the form Competitive Offer.
21/10/2024 19:25
The Bid solicitor Trường mầm non Sao Mai has posted the results of the bidding package Repairing toilets at Tha Mang village school of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TIẾN ĐẠT KS
16/10/2024 14:53
The Bid solicitor Trường mầm non Sao Mai has posted the request LCNT plan to repair the school toilet in Tha Mang village of the investor Trường mầm non Sao Mai with 1 bidding package.
16/10/2024 14:28
The Bid solicitor H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted the results of the bidding package Construction and Repair of Sao Mai Primary School of the investor Trường mầm non Sao Mai.
- Winning bidder: CÔNG TY TNHH THẠNH MINH VY
09/10/2024 14:24
The Bid solicitor Trường mầm non Sao Mai has posted the request Approving the contractor selection plan of the investor Trường mầm non Sao Mai with 3 bidding package.
08/10/2024 17:15
Investor Trường mầm non Sao Mai has posted an investment and development project Sao Mai Kindergarten, Ha Giang City. Category: Renovating and replacing the roof of a 2-story classroom..
08/10/2024 16:16
Bid solicitor H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted Tender Notice Construction and Repair of Sao Mai Primary School of the investor Trường mầm non Sao Mai with the form Competitive Offer.
20/07/2024 09:38
The Bid solicitor Trường mầm non Sao Mai has posted the request Repairing Sao Mai Kindergarten of the investor Trường mầm non Sao Mai with 5 bidding package.
20/07/2024 08:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường mầm non Sao Mai has posted 7 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường mầm non Sao Mai has posted 7 Tender Notices in 7 bidding packages. Among these, 3 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường mầm non Sao Mai has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường mầm non Sao Mai has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường mầm non Sao Mai has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects