Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TÂN QUY as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 8 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 24,016,458 VND, of which the total winning bid value is: 24,007,470 VND.
- The savings rate is: 0.04%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TÂN QUY as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 24,016,458 VND, in which the total winning value is: 24,007,470 VND.
- The savings rate is: 0.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON TÂN QUY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 3 were self-published, and 4 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Supervision consultancy .
- Winning bidder: MOC HA CONSTRUCTION COMPANY LIMITED
04/12/2025 16:15
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Construction .
- Winning bidder: MINNA HOME CONSTRUCTION DESIGN COMPANY LIMITED
04/12/2025 16:09
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the repair phase of the Project: Repair and renovation of Tan Quy Kindergarten with 2 bidding package .
04/12/2025 15:57
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Verification consultancy TKBVTC and DT .
- Winning bidder: VIET KIEN PHAT CONSTRUCTION TRADING JOINT STOCK COMPANY
25/11/2025 14:48
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Consulting on setting up financial budget and revenue .
- Winning bidder: Indochina Consultant Design And Construction Corporation
21/11/2025 14:36
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Project management .
- Winning bidder: NGUYEN BAO ARCHITECTURE CONSTRUCTION JOINT STOCK COMPANY
18/11/2025 11:55
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the investment preparation phase of the project: Repair and renovation of Tan Quy Kindergarten with 3 bidding package .
13/11/2025 10:39
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the investment preparation phase of the project: Repair and renovation of Tan Quy Kindergarten with 3 bidding package .
13/11/2025 10:23
TRƯỜNG MẦM NON TÂN QUY publishes the plan Providing food ingredients for Tan Quy Kindergarten in 2025-2026 with 1 bidding package .
30/08/2025 12:19
The Bid solicitor TRƯỜNG MẦM NON TÂN QUY has posted the results of the bidding package Construction insurance of the investor TRƯỜNG MẦM NON TÂN QUY.
- Winning bidder: Sai Gon Ha Noi Insurance Corpration
20/09/2024 14:42
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Construction insurance .
- Winning bidder: Sai Gon Ha Noi Insurance Corpration
20/09/2024 14:42
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Construction supervision .
- Winning bidder: HUY KHOI CONSTRUCTION JOINT STOCK COMPANY
20/09/2024 14:38
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Appraisal of HSYC and results of contractor selection for construction packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA
23/08/2024 16:13
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Prepare Bidding Documents, evaluate Proposals for construction bidding packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG PHÚC THÀNH
13/08/2024 10:36
TRƯỜNG MẦM NON TÂN QUY publishes the plan Plan for selecting contractors for the repair of Tan Quy Kindergarten (project implementation phase) with 5 bidding package .
12/08/2024 15:16
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ KIẾN TRÚC VÀ XÂY DỰNG NGHI HÂN
05/07/2024 14:47
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Design construction drawings and cost estimates .
- Winning bidder: TRUNG MY CONSTRUCTION & INVESTMENT CONSULTING CO., LTD
05/07/2024 14:40
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Project management consultancy .
- Winning bidder: Ban Quản lý dự án đầu tư xây dựng khu vực quận 7
03/07/2024 15:18
TRƯỜNG MẦM NON TÂN QUY publishes the plan Plan for selecting contractors for the repair of Tan Quy Kindergarten (project preparation phase) with 3 bidding package .
28/06/2024 13:37
TRƯỜNG MẦM NON TÂN QUY publishes the plan Plan for selecting contractors for the repair of Tan Quy Kindergarten (project preparation phase) with 3 bidding package .
04/06/2024 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Supervision consultancy .
- Winning bidder: MOC HA CONSTRUCTION COMPANY LIMITED
04/12/2025 16:15
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Construction .
- Winning bidder: MINNA HOME CONSTRUCTION DESIGN COMPANY LIMITED
04/12/2025 16:09
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the repair phase of the Project: Repair and renovation of Tan Quy Kindergarten with 2 bidding package .
04/12/2025 15:57
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Verification consultancy TKBVTC and DT .
- Winning bidder: VIET KIEN PHAT CONSTRUCTION TRADING JOINT STOCK COMPANY
25/11/2025 14:48
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Consulting on setting up financial budget and revenue .
- Winning bidder: Indochina Consultant Design And Construction Corporation
21/11/2025 14:36
TRƯỜNG MẦM NON TÂN QUY announced the results of the bid package Project management .
- Winning bidder: NGUYEN BAO ARCHITECTURE CONSTRUCTION JOINT STOCK COMPANY
18/11/2025 11:55
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the investment preparation phase of the project: Repair and renovation of Tan Quy Kindergarten with 3 bidding package .
13/11/2025 10:39
TRƯỜNG MẦM NON TÂN QUY publishes the plan Contractor selection plan for the investment preparation phase of the project: Repair and renovation of Tan Quy Kindergarten with 3 bidding package .
13/11/2025 10:23
TRƯỜNG MẦM NON TÂN QUY publishes the plan Providing food ingredients for Tan Quy Kindergarten in 2025-2026 with 1 bidding package .
30/08/2025 12:19
The Bid solicitor TRƯỜNG MẦM NON TÂN QUY has posted the results of the bidding package Construction insurance of the investor TRƯỜNG MẦM NON TÂN QUY.
- Winning bidder: Sai Gon Ha Noi Insurance Corpration
20/09/2024 14:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON TÂN QUY has posted 3 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON TÂN QUY has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON TÂN QUY has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON TÂN QUY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects