Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Tân Tiến as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 3 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 26 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 18 packages that have not fully posted the contractor selection results. Of these 18 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 33.33%, Construction 0%, Consultancy 0%, Non-consultancy 66.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,431,565,000 VND, of which the total winning bid value is: 1,427,546,000 VND.
- The savings rate is: 0.28%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Tân Tiến as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 33.33%, Construction 0%, Consulting 0%, Non-consulting 66.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,431,565,000 VND, in which the total winning value is: 1,427,546,000 VND.
- The savings rate is: 0.28%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm Non Tân Tiến are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 6 contractor selection plans, of which 6 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 3 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm Non Tân Tiến announced the results of the bid package Tender package No 01: Construction work .
- Winning bidder: CÔNG TY TNHH XD&TM THÀNH PHÁT HƯNG YÊN
04/08/2025 08:57
Trường Mầm Non Tân Tiến publishes Tender Notice Tender package No 01: Construction work in the form Open bidding .
18/07/2025 17:51
The Bid solicitor Trường Mầm Non Tân Tiến has posted the results of the bidding package Package No. 05: Consulting on evaluation of Bidding Documents, evaluating results for construction of construction packages of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VIỆT
18/07/2025 14:56
The Bid solicitor Trường Mầm Non Tân Tiến has posted the results of the bidding package Package No. 04: Consulting E-HSMT, E-HSDT construction package for construction of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: Công ty TNHH tư vấn xây dựng ĐTK
18/07/2025 14:54
The Bid solicitor Trường Mầm Non Tân Tiến has posted the request Plan for selecting contractors for repairing and strengthening facilities of Tan Tien Kindergarten of the investor Trường Mầm Non Tân Tiến with 6 bidding package.
18/07/2025 14:52
Investor Trường Mầm Non Tân Tiến has posted an investment and development project Repairing and strengthening facilities of Tan Tien Kindergarten.
17/07/2025 22:22
The Bid solicitor MKC CONSULTATION AND CONSTRUCTION JOINT STOCK COMPANY has posted the results of the bidding package Tender package No 01: Construction work of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: MINH HAI CONSTRUCTION TOURISM COMPANY LIMITED
19/05/2025 16:20
Bid solicitor MKC CONSULTATION AND CONSTRUCTION JOINT STOCK COMPANY has posted Tender Notice Tender package No 01: Construction work of the investor Trường Mầm Non Tân Tiến with the form Open bidding.
05/05/2025 14:30
The Bid solicitor Trường Mầm Non Tân Tiến has posted the request Maintenance and repair of Tan Tien Kindergarten, Van Giang district of the investor Trường Mầm Non Tân Tiến with 7 bidding package.
28/04/2025 10:34
Investor Trường Mầm Non Tân Tiến has posted an investment and development project Maintenance and repair of Tan Tien Kindergarten, Van Giang district.
28/04/2025 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Tân Tiến announced the results of the bid package Package No. 05: Consulting on evaluation of Bidding Documents, evaluating results for construction of construction packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VIỆT
18/07/2025 14:56
Trường Mầm Non Tân Tiến announced the results of the bid package Package No. 04: Consulting E-HSMT, E-HSDT construction package for construction .
- Winning bidder: Công ty TNHH tư vấn xây dựng ĐTK
18/07/2025 14:54
Trường Mầm Non Tân Tiến publishes the plan Plan for selecting contractors for repairing and strengthening facilities of Tan Tien Kindergarten with 6 bidding package .
18/07/2025 14:52
Trường Mầm Non Tân Tiến publishes the plan Maintenance and repair of Tan Tien Kindergarten, Van Giang district with 7 bidding package .
28/04/2025 10:34
Trường Mầm Non Tân Tiến announced the results of the bid package Package No. 01: Procurement and installation of equipment for Tan Tien Kindergarten .
- Winning bidder: HỘ KINH DOANH TRUNG TÂM THIẾT BỊ CÔNG NGHỆ HÀ NỘI
21/11/2024 23:43
Trường Mầm Non Tân Tiến announced the results of the bidding package Tender package No 01: Procurement and installation of equipment for Tan Tien Kindergarten with 1 participating contractors .
14/11/2024 09:41
Trường Mầm Non Tân Tiến publishes Tender Notice Tender package No 01: Procurement and installation of equipment for Tan Tien Kindergarten in the form Competitive Offer .
07/11/2024 10:53
Trường Mầm Non Tân Tiến announced the results of the bid package Package 03: Consulting on appraisal of bidding documents and LCNT results .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư và Xây dựng HN72
07/11/2024 10:27
Trường Mầm Non Tân Tiến announced the results of the bid package Bidding Package 02: Bid preparation consultancy and Bid evaluation .
- Winning bidder: IPC VIET COMPANY LIMITED
07/11/2024 10:25
Trường Mầm Non Tân Tiến publishes the plan Procurement and installation of equipment for Tan Tien Kindergarten with 3 bidding package .
07/11/2024 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Tân Tiến announced the results of the bid package Tender package No 01: Construction work .
- Winning bidder: CÔNG TY TNHH XD&TM THÀNH PHÁT HƯNG YÊN
04/08/2025 08:57
Trường Mầm Non Tân Tiến publishes Tender Notice Tender package No 01: Construction work in the form Open bidding .
18/07/2025 17:51
The Bid solicitor Trường Mầm Non Tân Tiến has posted the results of the bidding package Package No. 05: Consulting on evaluation of Bidding Documents, evaluating results for construction of construction packages of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VIỆT
18/07/2025 14:56
The Bid solicitor Trường Mầm Non Tân Tiến has posted the results of the bidding package Package No. 04: Consulting E-HSMT, E-HSDT construction package for construction of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: Công ty TNHH tư vấn xây dựng ĐTK
18/07/2025 14:54
The Bid solicitor Trường Mầm Non Tân Tiến has posted the request Plan for selecting contractors for repairing and strengthening facilities of Tan Tien Kindergarten of the investor Trường Mầm Non Tân Tiến with 6 bidding package.
18/07/2025 14:52
Investor Trường Mầm Non Tân Tiến has posted an investment and development project Repairing and strengthening facilities of Tan Tien Kindergarten.
17/07/2025 22:22
The Bid solicitor MKC CONSULTATION AND CONSTRUCTION JOINT STOCK COMPANY has posted the results of the bidding package Tender package No 01: Construction work of the investor Trường Mầm Non Tân Tiến.
- Winning bidder: MINH HAI CONSTRUCTION TOURISM COMPANY LIMITED
19/05/2025 16:20
Bid solicitor MKC CONSULTATION AND CONSTRUCTION JOINT STOCK COMPANY has posted Tender Notice Tender package No 01: Construction work of the investor Trường Mầm Non Tân Tiến with the form Open bidding.
05/05/2025 14:30
The Bid solicitor Trường Mầm Non Tân Tiến has posted the request Maintenance and repair of Tan Tien Kindergarten, Van Giang district of the investor Trường Mầm Non Tân Tiến with 7 bidding package.
28/04/2025 10:34
Investor Trường Mầm Non Tân Tiến has posted an investment and development project Maintenance and repair of Tan Tien Kindergarten, Van Giang district.
28/04/2025 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm Non Tân Tiến has posted 6 of the contractor selection plan, which contains 26 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường Mầm Non Tân Tiến has posted 3 Tender Notices in 2 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm Non Tân Tiến has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm Non Tân Tiến has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm Non Tân Tiến has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm Non Tân Tiến has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects