Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Tuổi Ngọc as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 7 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 130,410,901 VND, of which the total winning bid value is: 129,322,234 VND.
- The savings rate is: 0.83%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Tuổi Ngọc as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 130,410,901 VND, in which the total winning value is: 129,322,234 VND.
- The savings rate is: 0.83%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non Tuổi Ngọc are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 4 contractor selection plans, of which 1 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm non Tuổi Ngọc announced the results of the bid package Construction .
- Winning bidder: DINH GIA CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
18/11/2025 16:46
Trường Mầm non Tuổi Ngọc publishes the plan Repair and renovate Tuoi Ngoc Kindergarten with 5 bidding package .
18/11/2025 16:41
Investor Trường Mầm non Tuổi Ngọc has posted an investment and development project Repair and renovate Tuoi Ngoc Kindergarten.
18/11/2025 16:16
Trường Mầm non Tuổi Ngọc publishes the plan Repair and renovate Tuoi Ngoc Kindergarten with 3 bidding package .
07/11/2025 16:15
Trường Mầm non Tuổi Ngọc announced the results of the bid package Supply food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 .
- Winning bidder: FRESCO FOODS JOINT STOCK
24/09/2025 09:36
Trường Mầm non Tuổi Ngọc publishes the plan Supply food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 with 1 bidding package .
24/09/2025 09:32
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the request Plan for selecting contractors to install aluminum and glass glass walls of the investor Trường Mầm non Tuổi Ngọc with 1 bidding package.
20/12/2023 15:17
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Construction supervision of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/11/2022 15:43
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Civil Works of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: DINH GIA CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
21/11/2022 15:38
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
24/10/2022 08:59
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Tuổi Ngọc publishes the plan Plan for selecting contractors to install aluminum and glass glass walls with 1 bidding package .
20/12/2023 15:17
Trường Mầm non Tuổi Ngọc publishes the plan (Adjustment) The plan to select the contractor for the repair and renovation works of Tuoi Ngoc Kindergarten with 1 bidding package .
19/12/2022 11:08
Trường Mầm non Tuổi Ngọc publishes the plan Adjustment of the contractor selection plan for the repair and renovation works of Tuoi Ngoc Kindergarten (Project implementation phase) with 1 bidding package .
25/11/2022 16:22
Trường Mầm non Tuổi Ngọc announced the results of the bid package Construction supervision .
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/11/2022 15:43
Trường Mầm non Tuổi Ngọc announced the results of the bid package Civil Works .
- Winning bidder: DINH GIA CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
21/11/2022 15:38
Trường Mầm non Tuổi Ngọc publishes the plan Plan to select contractor for repair and renovation works of Tuoi Ngoc Kindergarten (Project implementation phase) with 2 bidding package .
04/11/2022 10:09
Trường Mầm non Tuổi Ngọc announced the results of the bid package Verification of construction drawing design and cost estimate .
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
24/10/2022 08:59
Trường Mầm non Tuổi Ngọc announced the results of the bid package Design construction drawings and cost estimates .
- Winning bidder: TRUNG MY CONSTRUCTION & INVESTMENT CONSULTING CO., LTD
24/10/2022 08:52
Trường Mầm non Tuổi Ngọc publishes the plan Plan to select contractor for repair and renovation works of Tuoi Ngoc Kindergarten with 2 bidding package .
21/10/2022 13:51
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Tuổi Ngọc announced the results of the bid package Construction .
- Winning bidder: DINH GIA CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
18/11/2025 16:46
Trường Mầm non Tuổi Ngọc publishes the plan Repair and renovate Tuoi Ngoc Kindergarten with 5 bidding package .
18/11/2025 16:41
Investor Trường Mầm non Tuổi Ngọc has posted an investment and development project Repair and renovate Tuoi Ngoc Kindergarten.
18/11/2025 16:16
Trường Mầm non Tuổi Ngọc publishes the plan Repair and renovate Tuoi Ngoc Kindergarten with 3 bidding package .
07/11/2025 16:15
Trường Mầm non Tuổi Ngọc announced the results of the bid package Supply food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 .
- Winning bidder: FRESCO FOODS JOINT STOCK
24/09/2025 09:36
Trường Mầm non Tuổi Ngọc publishes the plan Supply food, raw materials, fuel for school meals for semi-boarding students in the school year 2025-2026 with 1 bidding package .
24/09/2025 09:32
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the request Plan for selecting contractors to install aluminum and glass glass walls of the investor Trường Mầm non Tuổi Ngọc with 1 bidding package.
20/12/2023 15:17
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Construction supervision of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: BLT CONSTRUCTION INVESTMENT AND DESIGN CONSULTANT COMPANY LIMITED.
21/11/2022 15:43
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Civil Works of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: DINH GIA CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
21/11/2022 15:38
The Bid solicitor Trường Mầm non Tuổi Ngọc has posted the results of the bidding package Verification of construction drawing design and cost estimate of the investor Trường Mầm non Tuổi Ngọc.
- Winning bidder: SOUTHERN SAI GON CONSULTANTS INVESTMENT AND TECHNOLOGIES DEVELOPMENT JOINT STOCK COMPANY
24/10/2022 08:59
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non Tuổi Ngọc has posted 5 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm non Tuổi Ngọc has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non Tuổi Ngọc has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm non Tuổi Ngọc has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects