Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors không as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 4 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 183,736,000 VND, of which the total winning bid value is: 183,736,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors không as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 183,736,000 VND, in which the total winning value is: 183,736,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor không are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 3 contractor selection plans, of which 2 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
không announced the results of the bid package Supply of milk powder to perform school milk for semi-boarding students in the school year 2025-2026 .
- Winning bidder: HỘ KINH DOANH AN NGỌC DAN
15/09/2025 10:33
không announced the results of the bid package Supplying yogurt to perform snacks for semi-boarding students in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THƯƠNG MẠI VÀ DỊCH VỤ A&T
15/09/2025 10:26
không announced the results of the bid package Supply food, fresh food, vegetables, fruits, spices and packaged foods to perform boarding meals for the school year 2025-2026 .
- Winning bidder: NGUYỄN THỊ HOÀNG DUNG
04/09/2025 17:12
không publishes the plan Supply food, fresh food, vegetables, fruits, spices and packaged foods to perform boarding meals for the school year 2025-2026 with 3 bidding package .
26/08/2025 14:41
The Bid solicitor không has posted the results of the bidding package Construction supervision of the investor không.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIA HUY - HỘI AN
29/05/2025 15:52
The Bid solicitor không has posted the results of the bidding package Construction of painting rail of the investor không.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KIM AN
29/05/2025 15:48
The Bid solicitor không has posted the request Paint railing, door of Cam Pho kindergarten room of the investor không with 2 bidding package.
16/05/2025 16:02
The Bid solicitor không has posted the results of the bidding package Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG XUÂN BÁCH
19/02/2025 16:49
The Bid solicitor không has posted the results of the bidding package Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không.
- Winning bidder: Công ty TNHH Cơ khí và Xây dựng Hùng Phương
19/02/2025 16:45
The Bid solicitor không has posted the request Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không with 2 bidding package.
14/02/2025 09:22
The data sheet has been partially hidden, to see the full information please Login or Register
không announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIA HUY - HỘI AN
29/05/2025 15:52
không announced the results of the bid package Construction of painting rail .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KIM AN
29/05/2025 15:48
không publishes the plan Paint railing, door of Cam Pho kindergarten room with 2 bidding package .
16/05/2025 16:02
không announced the results of the bid package Repair fan system, fence wall paint, gate, waterproofing, toilet repair .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG XUÂN BÁCH
19/02/2025 16:49
không announced the results of the bid package Repair fan system, fence wall paint, gate, waterproofing, toilet repair .
- Winning bidder: Công ty TNHH Cơ khí và Xây dựng Hùng Phương
19/02/2025 16:45
không publishes the plan Repair fan system, fence wall paint, gate, waterproofing, toilet repair with 2 bidding package .
14/02/2025 09:22
The data sheet has been partially hidden, to see the full information please Login or Register
không announced the results of the bid package Supply of milk powder to perform school milk for semi-boarding students in the school year 2025-2026 .
- Winning bidder: HỘ KINH DOANH AN NGỌC DAN
15/09/2025 10:33
không announced the results of the bid package Supplying yogurt to perform snacks for semi-boarding students in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THƯƠNG MẠI VÀ DỊCH VỤ A&T
15/09/2025 10:26
không announced the results of the bid package Supply food, fresh food, vegetables, fruits, spices and packaged foods to perform boarding meals for the school year 2025-2026 .
- Winning bidder: NGUYỄN THỊ HOÀNG DUNG
04/09/2025 17:12
không publishes the plan Supply food, fresh food, vegetables, fruits, spices and packaged foods to perform boarding meals for the school year 2025-2026 with 3 bidding package .
26/08/2025 14:41
The Bid solicitor không has posted the results of the bidding package Construction supervision of the investor không.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIA HUY - HỘI AN
29/05/2025 15:52
The Bid solicitor không has posted the results of the bidding package Construction of painting rail of the investor không.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KIM AN
29/05/2025 15:48
The Bid solicitor không has posted the request Paint railing, door of Cam Pho kindergarten room of the investor không with 2 bidding package.
16/05/2025 16:02
The Bid solicitor không has posted the results of the bidding package Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG XUÂN BÁCH
19/02/2025 16:49
The Bid solicitor không has posted the results of the bidding package Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không.
- Winning bidder: Công ty TNHH Cơ khí và Xây dựng Hùng Phương
19/02/2025 16:45
The Bid solicitor không has posted the request Repair fan system, fence wall paint, gate, waterproofing, toilet repair of the investor không with 2 bidding package.
14/02/2025 09:22
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s không has posted 2 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor không has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor không has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity không has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects