Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TH CƠ SỞ TRỌNG QUAN as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 6 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 289,144,000 VND, of which the total winning bid value is: 289,144,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TH CƠ SỞ TRỌNG QUAN as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 289,144,000 VND, in which the total winning value is: 289,144,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 5 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Install the corrugated iron roof behind the brand area of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: Bao Ha Joint Stock Company
04/06/2025 16:29
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Install the corrugated iron roof behind the brand area of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 1 bidding package.
04/06/2025 16:23
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: CÔNG TY TNHH HÙNG MẠNH
28/03/2025 12:20
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request The Decision approves the plan to select the contractor of the work of the project: Repairing classrooms, handling roof waterproofing between the two houses, replacing the surface window after 6 schools of Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 1 bidding package.
28/03/2025 12:12
Investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted an investment and development project Repair classrooms, handle roof waterproofing between 2 houses, replace the surface window after 6 schools of Trong Quan Secondary School.
28/03/2025 08:08
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 3 bidding package.
28/12/2024 07:19
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Tender package No 01: Construction work of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THÀNH VINH
27/12/2024 21:02
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Tender package No 03: Construction supervision consultancy of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: Công ty cổ phần tư vấn xây dựng Thịnh Vượng Group
27/12/2024 20:58
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Bidding package No. 02: Construction investment project management consulting of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: LONG GIANG DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
27/12/2024 20:55
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 3 bidding package.
27/12/2024 20:29
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG TH CƠ SỞ TRỌNG QUAN announced the results of the bid package Install the corrugated iron roof behind the brand area .
- Winning bidder: Bao Ha Joint Stock Company
04/06/2025 16:29
TRƯỜNG TH CƠ SỞ TRỌNG QUAN publishes the plan Install the corrugated iron roof behind the brand area with 1 bidding package .
04/06/2025 16:23
TRƯỜNG TH CƠ SỞ TRỌNG QUAN announced the results of the bid package Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School .
- Winning bidder: CÔNG TY TNHH HÙNG MẠNH
28/03/2025 12:20
TRƯỜNG TH CƠ SỞ TRỌNG QUAN publishes the plan The Decision approves the plan to select the contractor of the work of the project: Repairing classrooms, handling roof waterproofing between the two houses, replacing the surface window after 6 schools of Trong Quan Secondary School with 1 bidding package .
28/03/2025 12:12
TRƯỜNG TH CƠ SỞ TRỌNG QUAN publishes the plan Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School with 3 bidding package .
28/12/2024 07:19
TRƯỜNG TH CƠ SỞ TRỌNG QUAN announced the results of the bid package Tender package No 01: Construction work .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THÀNH VINH
27/12/2024 21:02
TRƯỜNG TH CƠ SỞ TRỌNG QUAN announced the results of the bid package Tender package No 03: Construction supervision consultancy .
- Winning bidder: Công ty cổ phần tư vấn xây dựng Thịnh Vượng Group
27/12/2024 20:58
TRƯỜNG TH CƠ SỞ TRỌNG QUAN announced the results of the bid package Bidding package No. 02: Construction investment project management consulting .
- Winning bidder: LONG GIANG DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
27/12/2024 20:55
TRƯỜNG TH CƠ SỞ TRỌNG QUAN publishes the plan Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School with 3 bidding package .
27/12/2024 20:29
TRƯỜNG TH CƠ SỞ TRỌNG QUAN publishes the plan Plan for selecting contractors for bidding packages in the preparation phase of preparing construction reports: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School with 1 bidding package .
27/12/2024 20:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Install the corrugated iron roof behind the brand area of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: Bao Ha Joint Stock Company
04/06/2025 16:29
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Install the corrugated iron roof behind the brand area of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 1 bidding package.
04/06/2025 16:23
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: CÔNG TY TNHH HÙNG MẠNH
28/03/2025 12:20
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request The Decision approves the plan to select the contractor of the work of the project: Repairing classrooms, handling roof waterproofing between the two houses, replacing the surface window after 6 schools of Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 1 bidding package.
28/03/2025 12:12
Investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted an investment and development project Repair classrooms, handle roof waterproofing between 2 houses, replace the surface window after 6 schools of Trong Quan Secondary School.
28/03/2025 08:08
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 3 bidding package.
28/12/2024 07:19
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Tender package No 01: Construction work of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THÀNH VINH
27/12/2024 21:02
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Tender package No 03: Construction supervision consultancy of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: Công ty cổ phần tư vấn xây dựng Thịnh Vượng Group
27/12/2024 20:58
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the results of the bidding package Bidding package No. 02: Construction investment project management consulting of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN.
- Winning bidder: LONG GIANG DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
27/12/2024 20:55
The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted the request Plan for selecting contractors for packages under the project: Repairing classrooms, waterproofing the roof between 2 houses, replacing windows at the back of 6 classrooms at Trong Quan Secondary School of the investor TRƯỜNG TH CƠ SỞ TRỌNG QUAN with 3 bidding package.
27/12/2024 20:29
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted 5 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG TH CƠ SỞ TRỌNG QUAN has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG TH CƠ SỞ TRỌNG QUAN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects