Data analysis results of DauThau.info software for bid solicitors Trường TH Lý Tự Trọng as follows:
- Has relationships with 8 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 10 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 495,177,000 VND, of which the total winning bid value is: 486,630,000 VND.
- The savings rate is: 1.73%.
Data analysis results of DauThau.info software for bid solicitors Trường TH Lý Tự Trọng as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 495,177,000 VND, in which the total winning value is: 486,630,000 VND.
- The savings rate is: 1.73%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 13 Contractor selection plan in which 10 Contractor selection plan is self-published, and 3 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 1 packages are self-invited, and 3 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Project management of the investor Trường TH Lý Tự Trọng.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI PHÚC MINH KHANG
04/08/2024 14:19
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Verification of BVTC design and cost estimate of the investor Trường TH Lý Tự Trọng.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KỸ THUẬT HOÀNG PHÁT
04/08/2024 14:16
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Prepare economic and technical reports on construction investment of the investor Trường TH Lý Tự Trọng.
- Winning bidder: Công ty TNHH TV&XD Hưng Thịnh Phát
04/08/2024 14:11
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Appraisal of application documents, LCNT . results of the investor Trường TH Lý Tự Trọng.
- Winning bidder: DTAH LIMITED LIABILITY COMPANY
25/07/2024 10:59
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Trường TH Lý Tự Trọng.
- Winning bidder: DCT TRADING - CONSTRUCTION - DESIGN COMPANY LIMITED
25/07/2024 10:54
The Bid solicitor Trường TH Lý Tự Trọng has posted the request LCNT project plan: Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 5 bidding package.
14/07/2024 21:54
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Project preparation plan: Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 2 bidding package.
14/07/2024 21:52
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 5 bidding package.
14/07/2024 21:24
Trường TH Lý Tự Trọng Posted Development Investment Project Repairing Ly Tu Trong Primary School, Ea Drang town.
14/07/2024 21:21
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 1 bidding package.
12/07/2024 13:46
The data sheet has been partially hidden, to see the full information please Login or Register
Trường TH Lý Tự Trọng announced the results of the bid package Project management .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI PHÚC MINH KHANG
04/08/2024 14:19
Trường TH Lý Tự Trọng announced the results of the bid package Verification of BVTC design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KỸ THUẬT HOÀNG PHÁT
04/08/2024 14:16
Trường TH Lý Tự Trọng announced the results of the bid package Prepare economic and technical reports on construction investment .
- Winning bidder: Công ty TNHH TV&XD Hưng Thịnh Phát
04/08/2024 14:11
Trường TH Lý Tự Trọng announced the results of the bid package Appraisal of application documents, LCNT . results .
- Winning bidder: DTAH LIMITED LIABILITY COMPANY
25/07/2024 10:59
Trường TH Lý Tự Trọng announced the results of the bid package Prepare and Evaluate Tender documents .
- Winning bidder: DCT TRADING - CONSTRUCTION - DESIGN COMPANY LIMITED
25/07/2024 10:54
Trường TH Lý Tự Trọng publishes the plan LCNT project plan: Repairing Ly Tu Trong Primary School, Ea Drang town with 5 bidding package .
14/07/2024 21:54
Trường TH Lý Tự Trọng publishes the plan Project preparation plan: Repairing Ly Tu Trong Primary School, Ea Drang town with 2 bidding package .
14/07/2024 21:52
Trường TH Lý Tự Trọng publishes the plan Repairing Ly Tu Trong Primary School, Ea Drang town with 5 bidding package .
14/07/2024 21:24
Trường TH Lý Tự Trọng publishes the plan Repairing Ly Tu Trong Primary School, Ea Drang town with 1 bidding package .
12/07/2024 13:46
Trường TH Lý Tự Trọng publishes the plan Repairing Ly Tu Trong Primary School, Ea Drang town with 1 bidding package .
12/07/2024 11:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Project management of the investor Trường TH Lý Tự Trọng.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI PHÚC MINH KHANG
04/08/2024 14:19
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Verification of BVTC design and cost estimate of the investor Trường TH Lý Tự Trọng.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KỸ THUẬT HOÀNG PHÁT
04/08/2024 14:16
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Prepare economic and technical reports on construction investment of the investor Trường TH Lý Tự Trọng.
- Winning bidder: Công ty TNHH TV&XD Hưng Thịnh Phát
04/08/2024 14:11
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Appraisal of application documents, LCNT . results of the investor Trường TH Lý Tự Trọng.
- Winning bidder: DTAH LIMITED LIABILITY COMPANY
25/07/2024 10:59
The Bid solicitor Trường TH Lý Tự Trọng has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Trường TH Lý Tự Trọng.
- Winning bidder: DCT TRADING - CONSTRUCTION - DESIGN COMPANY LIMITED
25/07/2024 10:54
The Bid solicitor Trường TH Lý Tự Trọng has posted the request LCNT project plan: Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 5 bidding package.
14/07/2024 21:54
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Project preparation plan: Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 2 bidding package.
14/07/2024 21:52
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 5 bidding package.
14/07/2024 21:24
Trường TH Lý Tự Trọng Posted Development Investment Project Repairing Ly Tu Trong Primary School, Ea Drang town.
14/07/2024 21:21
The Bid solicitor Trường TH Lý Tự Trọng has posted the request Repairing Ly Tu Trong Primary School, Ea Drang town of the investor Trường TH Lý Tự Trọng with 1 bidding package.
12/07/2024 13:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường TH Lý Tự Trọng has posted 10 of the contractor selection plan, which contains 10 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường TH Lý Tự Trọng has posted 1 Tender Notice in the 1 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường TH Lý Tự Trọng has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường TH Lý Tự Trọng has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường TH Lý Tự Trọng has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường TH Lý Tự Trọng is the investor of 4 package, of which 1 package is self-invited, other units invite bid 3 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường TH Lý Tự Trọng is the owner of 13 contractor selection plan. In which, they self-invite 10 of contractor selection plan, other units invite bids of 3 of contractor selection plan.
Summary: Investor Trường TH Lý Tự Trọng is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường TH Lý Tự Trọng is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code