Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRUONG TH&THCS KIEN BINH 1 as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 3 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 245,879,910 VND, of which the total winning bid value is: 245,879,910 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRUONG TH&THCS KIEN BINH 1 as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 245,879,910 VND, in which the total winning value is: 245,879,910 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRUONG TH&THCS KIEN BINH 1 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 10 contractor selection plans, of which 10 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Hall tiles and hall in the hall of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
03/06/2025 10:55
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:45
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:42
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:38
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
27/05/2025 18:54
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall of the hall area (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
27/05/2025 17:19
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
08/04/2025 15:32
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
08/04/2025 15:23
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
02/04/2025 09:27
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Clearance of trees and construction of new flower beds of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
16/12/2024 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
TRUONG TH&THCS KIEN BINH 1 announced the results of the bid package Hall tiles and hall in the hall .
- Winning bidder: VĂN CHUNG
03/06/2025 10:55
TRUONG TH&THCS KIEN BINH 1 publishes the plan Brick lining in the hall and hall area outside the hall (phase 1) with 1 bidding package .
03/06/2025 10:45
TRUONG TH&THCS KIEN BINH 1 publishes the plan Brick lining in the hall and hall area outside the hall (phase 1) with 1 bidding package .
03/06/2025 10:42
TRUONG TH&THCS KIEN BINH 1 publishes the plan Brick lining in the hall and hall area outside the hall (phase 1) with 1 bidding package .
03/06/2025 10:38
TRUONG TH&THCS KIEN BINH 1 publishes the plan Brick lining in the hall and hall area outside the hall (phase 1) with 1 bidding package .
27/05/2025 18:54
TRUONG TH&THCS KIEN BINH 1 publishes the plan Brick lining in the hall and hall of the hall area (phase 1) with 1 bidding package .
27/05/2025 17:19
TRUONG TH&THCS KIEN BINH 1 announced the results of the bid package Making silver roof on the side of the gate in the school yard .
- Winning bidder: VĂN CHUNG
08/04/2025 15:32
TRUONG TH&THCS KIEN BINH 1 publishes the plan Making silver roof on the side of the gate in the school yard with 1 bidding package .
08/04/2025 15:23
TRUONG TH&THCS KIEN BINH 1 publishes the plan Making silver roof on the side of the gate in the school yard with 1 bidding package .
02/04/2025 09:27
TRUONG TH&THCS KIEN BINH 1 announced the results of the bid package Clearance of trees and construction of new flower beds .
- Winning bidder: VĂN CHUNG
16/12/2024 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Hall tiles and hall in the hall of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
03/06/2025 10:55
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:45
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:42
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
03/06/2025 10:38
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall area outside the hall (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
27/05/2025 18:54
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Brick lining in the hall and hall of the hall area (phase 1) of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
27/05/2025 17:19
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
08/04/2025 15:32
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
08/04/2025 15:23
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the request Making silver roof on the side of the gate in the school yard of the investor TRUONG TH&THCS KIEN BINH 1 with 1 bidding package.
02/04/2025 09:27
The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted the results of the bidding package Clearance of trees and construction of new flower beds of the investor TRUONG TH&THCS KIEN BINH 1.
- Winning bidder: VĂN CHUNG
16/12/2024 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRUONG TH&THCS KIEN BINH 1 has posted 10 of the contractor selection plan, which contains 3 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRUONG TH&THCS KIEN BINH 1 has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRUONG TH&THCS KIEN BINH 1 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects