Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS ĐẶNG THAI MAI as follows:
- Has relationships with 1 project owners.
- Has relationships with 17 contractor.
- Announced 1 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 17 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,832,673,000 VND, of which the total winning bid value is: 1,826,735,000 VND.
- The savings rate is: 0.32%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS ĐẶNG THAI MAI as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,832,673,000 VND, in which the total winning value is: 1,826,735,000 VND.
- The savings rate is: 0.32%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS ĐẶNG THAI MAI are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 23 contractor selection plans, of which 10 were self-published, and 13 were published by other entities.
- Is the investor of 8 Tender Notices, of which 1 were self-invited, and 7 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Small repair of Dang Thai Mai Secondary School: Chiseled with bricks; Removing corrugated iron roofs with car garage and roof C; Digging to cut roots of the foundation; slice 11 tanks; Dam rebuild the fence in front of the school gate with 1 bidding package .
19/09/2025 15:01
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Organize linking basketball teaching year 2025-2026 .
- Winning bidder: CÔNG TY CỔ PHẦN THỂ THAO HỌC ĐƯỜNG 4YOU SPORT
04/09/2025 14:55
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Organize teaching IC3 Informatics training program for the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH TMATH
04/09/2025 14:55
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Increasing English Education Program 2025 - 2026 .
- Winning bidder: CÔNG TY CỔ PHẦN TRUNG TÂM ANH NGỮ AMA VINH
04/09/2025 14:54
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package The training program of teaching art at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: Trường Cao đẳng Văn hóa nghệ thuật - Nghệ An
28/08/2025 16:14
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 03: Providing semi-boarding meals for students at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN Y.Ê.N
28/08/2025 10:21
TRƯỜNG THCS ĐẶNG THAI MAI publishes Tender Notice Tender package No 01: Increasing English Education Program 2025 - 2026 in the form Competitive Offer .
20/08/2025 16:38
TRƯỜNG THCS ĐẶNG THAI MAI publishes Tender Notice Tender package No 01: Increasing English Education Program 2025 - 2026 in the form Competitive Offer .
15/08/2025 17:50
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package STEM teaching training program at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: KDI EDUCATION JOINT STOCK COMPANY
15/08/2025 14:57
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Aerobic teaching training program at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: Công ty TNHH Giáo Dục Phát Triển Thể Chất Sao Vàng
15/08/2025 14:46
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Replace the front corrugated iron roof and 3 panels behind the multi -purpose house of Dang Thai Mai Secondary School with 1 bidding package .
26/03/2025 10:28
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Provide 01 85 inch Samsung TV with 1 bidding package .
13/11/2024 11:17
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Provide 140 electromechanical ceiling fans with 1 bidding package .
13/11/2024 11:14
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Provide 67 sets of student desks and chairs with 1 bidding package .
13/11/2024 11:11
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Provide 11 computer systems with 1 bidding package .
13/11/2024 11:08
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Decision to approve the plan to select a vertical cabinet air conditioning contractor with 1 bidding package .
13/11/2024 11:05
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Providing boarding meals for students at Dang Thai Mai Secondary School for the 2024-2025 school year with 3 bidding package .
21/08/2024 09:45
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Providing boarding meals for students at Dang Thai Mai Secondary School for the 2024-2025 school year with 3 bidding package .
13/08/2024 14:15
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package 01: Construction cost .
- Winning bidder: LINH CHI JOINT STOCK COMPANY
02/08/2024 14:50
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN GIA LINH KHANG
29/07/2024 14:45
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS ĐẶNG THAI MAI publishes the plan Small repair of Dang Thai Mai Secondary School: Chiseled with bricks; Removing corrugated iron roofs with car garage and roof C; Digging to cut roots of the foundation; slice 11 tanks; Dam rebuild the fence in front of the school gate with 1 bidding package .
19/09/2025 15:01
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Organize linking basketball teaching year 2025-2026 .
- Winning bidder: CÔNG TY CỔ PHẦN THỂ THAO HỌC ĐƯỜNG 4YOU SPORT
04/09/2025 14:55
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Organize teaching IC3 Informatics training program for the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH TMATH
04/09/2025 14:55
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 01: Increasing English Education Program 2025 - 2026 .
- Winning bidder: CÔNG TY CỔ PHẦN TRUNG TÂM ANH NGỮ AMA VINH
04/09/2025 14:54
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package The training program of teaching art at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: Trường Cao đẳng Văn hóa nghệ thuật - Nghệ An
28/08/2025 16:14
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Package No. 03: Providing semi-boarding meals for students at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN Y.Ê.N
28/08/2025 10:21
TRƯỜNG THCS ĐẶNG THAI MAI publishes Tender Notice Tender package No 01: Increasing English Education Program 2025 - 2026 in the form Competitive Offer .
20/08/2025 16:38
TRƯỜNG THCS ĐẶNG THAI MAI publishes Tender Notice Tender package No 01: Increasing English Education Program 2025 - 2026 in the form Competitive Offer .
15/08/2025 17:50
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package STEM teaching training program at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: KDI EDUCATION JOINT STOCK COMPANY
15/08/2025 14:57
TRƯỜNG THCS ĐẶNG THAI MAI announced the results of the bid package Aerobic teaching training program at Dang Thai Mai Secondary School in the school year 2025-2026 .
- Winning bidder: Công ty TNHH Giáo Dục Phát Triển Thể Chất Sao Vàng
15/08/2025 14:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS ĐẶNG THAI MAI has posted 10 of the contractor selection plan, which contains 17 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG THCS ĐẶNG THAI MAI has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS ĐẶNG THAI MAI has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS ĐẶNG THAI MAI has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS ĐẶNG THAI MAI has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS ĐẶNG THAI MAI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects