Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LÝ TỰ TRỌNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 22 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 23 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 22 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 20 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,315,813,533 VND, of which the total winning bid value is: 3,141,474,542 VND.
- The savings rate is: 5.26%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LÝ TỰ TRỌNG as follows:
- Has relationships with 22 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,315,813,533 VND, in which the total winning value is: 3,141,474,542 VND.
- The savings rate is: 5.26%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS LÝ TỰ TRỌNG are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 22 contractor selection plans, of which 13 were self-published, and 9 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Procurement of student desks and chairs to serve teaching activities of Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) .
- Winning bidder: HỘ KINH DOANH ĐỖ THỊ XUÂN
08/12/2025 16:49
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Procurement and installation of sunshades for Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) .
- Winning bidder: HỘ KINH DOANH - NGUYỄN THỊ VÂN ANH 2000
03/12/2025 15:25
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Contractor selection plan Estimate: Procurement of student desks and chairs to serve teaching activities of Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) with 1 bidding package .
03/12/2025 14:51
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Estimated contractor selection plan: Procurement and installation of sunshade nets for Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) with 1 bidding package .
27/11/2025 17:31
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package 03: Project Management Consulting .
26/11/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: Công ty TNHH 1TV xây dựng và thương mại Anh Việt
26/11/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Adjusting the contractor selection plan: Repairing some items at Ly Tu Trong Secondary School, Cua Ong ward with 3 bidding package .
24/11/2025 16:39
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ TƯ VẤN XÂY DỰNG TCC
03/11/2025 16:58
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Contractor selection plan: Repairing some items at Ly Tu Trong Secondary School, Cua Ong ward with 3 bidding package .
15/10/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Consulting on making construction technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN KIẾN TRÚC - HẠ TẦNG TÂM THÀNH
01/10/2025 18:13
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Shopping, installing surveillance camera systems in classrooms of Ly Tu Trong Secondary School in 2025 .
- Winning bidder: PC INVESTMENT & DEVELOPMENT TECHNONOGY JOINT STOCK COMPANY
23/05/2025 14:46
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Shopping, installing surveillance camera systems in classrooms of Ly Tu Trong Secondary School with 1 bidding package .
16/05/2025 16:23
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Shopping, installation of sunshine of the school yard of Ly Tu Trong Secondary School 2025 .
- Winning bidder: HỘ KINH DOANH - NGUYỄN THỊ VÂN ANH 2000
14/03/2025 16:52
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Shopping, installation of sunshine of the school yard of Ly Tu Trong Secondary School 2025 with 1 bidding package .
14/03/2025 13:54
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI QUANG BÁCH
16/12/2024 23:07
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY TNHH MTV THƯƠNG MẠI XÂY DỰNG 212
11/12/2024 22:23
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Purchasing (dispersing) minimum teaching equipment for Ly Tu Trong Secondary School in 2024 .
- Winning bidder: SET GROUP JOINT STOCK COMPANY
09/12/2024 13:05
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package 05: Construction project management consulting .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN QUY HOẠCH VÀ THIẾT KẾ XÂY DỰNG CẨM PHẢ
05/12/2024 16:15
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN QUY HOẠCH VÀ THIẾT KẾ XÂY DỰNG CẨM PHẢ
04/12/2024 16:04
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package 05: Construction project management consulting .
- Winning bidder: CAM PHA CONSTRUCTION CONSULTANT LIMITED COMPANY
03/12/2024 09:41
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Procurement of student desks and chairs to serve teaching activities of Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) .
- Winning bidder: HỘ KINH DOANH ĐỖ THỊ XUÂN
08/12/2025 16:49
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Procurement and installation of sunshades for Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) .
- Winning bidder: HỘ KINH DOANH - NGUYỄN THỊ VÂN ANH 2000
03/12/2025 15:25
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Contractor selection plan Estimate: Procurement of student desks and chairs to serve teaching activities of Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) with 1 bidding package .
03/12/2025 14:51
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Estimated contractor selection plan: Procurement and installation of sunshade nets for Ly Tu Trong Secondary School (receiving estimates approved by Cam Son Secondary School) with 1 bidding package .
27/11/2025 17:31
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package 03: Project Management Consulting .
26/11/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: Công ty TNHH 1TV xây dựng và thương mại Anh Việt
26/11/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Adjusting the contractor selection plan: Repairing some items at Ly Tu Trong Secondary School, Cua Ong ward with 3 bidding package .
24/11/2025 16:39
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ TƯ VẤN XÂY DỰNG TCC
03/11/2025 16:58
TRƯỜNG THCS LÝ TỰ TRỌNG publishes the plan Contractor selection plan: Repairing some items at Ly Tu Trong Secondary School, Cua Ong ward with 3 bidding package .
15/10/2025 14:12
TRƯỜNG THCS LÝ TỰ TRỌNG announced the results of the bid package Consulting on making construction technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN KIẾN TRÚC - HẠ TẦNG TÂM THÀNH
01/10/2025 18:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS LÝ TỰ TRỌNG has posted 14 of the contractor selection plan, which contains 23 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG THCS LÝ TỰ TRỌNG has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS LÝ TỰ TRỌNG has posted 22 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 22 package, canceled the bid 0 package (among the bidding packages above).
- There are 20 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS LÝ TỰ TRỌNG has a relationship with 22 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS LÝ TỰ TRỌNG has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS LÝ TỰ TRỌNG has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects