Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 15 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 331,130,000 VND, of which the total winning bid value is: 331,130,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 331,130,000 VND, in which the total winning value is: 331,130,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 10 contractor selection plans, of which 9 were self-published, and 1 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Purchasing racks for students' meals, installing insect-proof screen doors and carrying aluminum around the rack, installing corrugated iron roofs in hall C - kitchen, hall A - parking shed .
- Winning bidder: HỘ KINH DOANH VŨ ĐỨC CƯỜNG
15/10/2025 17:22
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Purchasing racks for students' meals, installing insect-proof screen doors and carrying aluminum around the rack, installing corrugated iron roofs in hall C - kitchen, hall A - parking shed with 1 bidding package .
15/10/2025 17:15
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Procurement to strengthen facilities of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
21/12/2024 18:15
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Procurement to strengthen facilities of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
16/12/2024 21:27
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
16/10/2024 09:54
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
09/10/2024 15:37
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Buy projectors for teaching and learning of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: Hộ kinh doanh Vũ Văn Phong
03/06/2024 19:51
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Buy projectors for teaching and learning of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
29/05/2024 16:31
The Bid solicitor CÔNG TY CỔ PHẦN ĐẤU THẦU CỬU LONG THANH HÓA has posted the results of the bidding package Package No. 3: Procurement of goods Procurement of air conditioners for Nguyen Luong Bang Secondary School of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: DINH LONG VIET NAM JOINT STOCK COMPANY
14/05/2024 18:42
The Bid solicitor CÔNG TY CỔ PHẦN ĐẤU THẦU CỬU LONG THANH HÓA has posted the results of the bidding package Package No. 03: Procurement of Cameras for Nguyen Luong Bang Secondary School. of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: DINH LONG VIET NAM JOINT STOCK COMPANY
17/04/2024 10:17
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Procurement to strengthen facilities .
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
21/12/2024 18:15
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Procurement to strengthen facilities with 1 bidding package .
16/12/2024 21:27
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens .
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
16/10/2024 09:54
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens with 1 bidding package .
09/10/2024 15:37
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Buy projectors for teaching and learning .
- Winning bidder: Hộ kinh doanh Vũ Văn Phong
03/06/2024 19:51
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Buy projectors for teaching and learning with 1 bidding package .
29/05/2024 16:31
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Procurement of air conditioners for Nguyen Luong Bang Secondary School with 3 bidding package .
07/03/2024 15:57
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Procurement of Camera for Nguyen Luong Bang Secondary School with 3 bidding package .
31/01/2024 17:15
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Procurement of air conditioning system for Nguyen Luong Bang Secondary School .
- Winning bidder: Hộ kinh doanh Trần Phương
18/09/2023 15:58
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Procurement of air conditioning system for Nguyen Luong Bang Secondary School with 1 bidding package .
04/08/2023 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG announced the results of the bid package Purchasing racks for students' meals, installing insect-proof screen doors and carrying aluminum around the rack, installing corrugated iron roofs in hall C - kitchen, hall A - parking shed .
- Winning bidder: HỘ KINH DOANH VŨ ĐỨC CƯỜNG
15/10/2025 17:22
TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG publishes the plan Purchasing racks for students' meals, installing insect-proof screen doors and carrying aluminum around the rack, installing corrugated iron roofs in hall C - kitchen, hall A - parking shed with 1 bidding package .
15/10/2025 17:15
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Procurement to strengthen facilities of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
21/12/2024 18:15
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Procurement to strengthen facilities of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
16/12/2024 21:27
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: HỘ KINH DOANH ĐỨC CƯỜNG
16/10/2024 09:54
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Construction and installation of corrugated iron roofs for vehicle sheds and semi-boarding kitchens of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
09/10/2024 15:37
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the results of the bidding package Buy projectors for teaching and learning of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: Hộ kinh doanh Vũ Văn Phong
03/06/2024 19:51
The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted the request Buy projectors for teaching and learning of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG with 1 bidding package.
29/05/2024 16:31
The Bid solicitor CÔNG TY CỔ PHẦN ĐẤU THẦU CỬU LONG THANH HÓA has posted the results of the bidding package Package No. 3: Procurement of goods Procurement of air conditioners for Nguyen Luong Bang Secondary School of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: DINH LONG VIET NAM JOINT STOCK COMPANY
14/05/2024 18:42
The Bid solicitor CÔNG TY CỔ PHẦN ĐẤU THẦU CỬU LONG THANH HÓA has posted the results of the bidding package Package No. 03: Procurement of Cameras for Nguyen Luong Bang Secondary School. of the investor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG.
- Winning bidder: DINH LONG VIET NAM JOINT STOCK COMPANY
17/04/2024 10:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted 9 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS NGUYỄN LƯƠNG BẰNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects