Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường THCS Trường Chinh as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 15 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 756,306,000 VND, of which the total winning bid value is: 701,331,639 VND.
- The savings rate is: 7.27%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Trường Chinh as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 756,306,000 VND, in which the total winning value is: 701,331,639 VND.
- The savings rate is: 7.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Trường Chinh are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 6 contractor selection plans, of which 5 were self-published, and 1 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Trường Chinh announced the results of the bid package Provide semi -boarding lunch for students at Chinh Secondary School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI - DỊCH VỤ TÂM TUẤN PHÁT
29/08/2025 16:15
Trường THCS Trường Chinh publishes the plan Provide lunch capacity for semi -boarding students at the Secondary School for the 2025 - 2026 school year with 1 bidding package .
29/08/2025 16:08
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Construction of the investor Trường THCS Trường Chinh.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ THIẾT KẾ XÂY DỰNG AN GIA NGUYỄN
21/08/2025 13:54
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Expenses for making bidding documents and evaluating bidding bidding packages for construction package of the investor Trường THCS Trường Chinh.
- Winning bidder: HOANG GIA PHAT TRADING CONSTRUCTION CONSULTING COMPANY LIMITED
04/07/2025 11:27
The Bid solicitor Trường THCS Trường Chinh has posted the request Repair and reform of Chinh Secondary School of the investor Trường THCS Trường Chinh with 5 bidding package.
04/07/2025 11:22
Investor Trường THCS Trường Chinh has posted an investment and development project Repair and reform of Chinh Secondary School.
04/07/2025 11:11
The Bid solicitor TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED has posted the results of the bidding package Procurement of assets and equipment for professional services in 2024 of the investor Trường THCS Trường Chinh.
- Winning bidder: DUC TU IMPORT EXPORT SERVICE TRADING COMPANY LIMITED
27/12/2024 17:25
Bid solicitor TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED has posted Tender Notice Procurement of assets and equipment for professional services in 2024 of the investor Trường THCS Trường Chinh with the form Competitive Offer.
28/11/2024 10:25
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Package No. 01: Consulting for E-HSMT preparation and E-HSDT evaluation of the investor Trường THCS Trường Chinh.
- Winning bidder: TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED
15/11/2024 11:05
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Consulting on appraisal of E-HSMT and KQLCNT of the investor Trường THCS Trường Chinh.
- Winning bidder: CÔNG TY TNHH TM DV TƯ VẤN THIẾT KẾ XÂY DỰNG KQ GROUP
15/11/2024 11:03
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Trường Chinh announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ THIẾT KẾ XÂY DỰNG AN GIA NGUYỄN
21/08/2025 13:54
Trường THCS Trường Chinh announced the results of the bid package Expenses for making bidding documents and evaluating bidding bidding packages for construction package .
- Winning bidder: HOANG GIA PHAT TRADING CONSTRUCTION CONSULTING COMPANY LIMITED
04/07/2025 11:27
Trường THCS Trường Chinh publishes the plan Repair and reform of Chinh Secondary School with 5 bidding package .
04/07/2025 11:22
Trường THCS Trường Chinh announced the results of the bid package Package No. 01: Consulting for E-HSMT preparation and E-HSDT evaluation .
- Winning bidder: TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED
15/11/2024 11:05
Trường THCS Trường Chinh announced the results of the bid package Consulting on appraisal of E-HSMT and KQLCNT .
- Winning bidder: CÔNG TY TNHH TM DV TƯ VẤN THIẾT KẾ XÂY DỰNG KQ GROUP
15/11/2024 11:03
Trường THCS Trường Chinh publishes the plan Procurement of assets and equipment for professional services in 2024 with 3 bidding package .
11/11/2024 16:51
Trường THCS Trường Chinh publishes the plan Supply and installation of air conditioners for Truong Chinh Secondary School with 1 bidding package .
22/08/2024 15:37
Trường THCS Trường Chinh announced the results of the bid package Expenses for appraisal of bidding documents and appraisal of construction contractor selection results .
- Winning bidder: VO TUAN TRUONG CONSULTING COMPANY LIMITED
06/10/2023 14:39
Trường THCS Trường Chinh announced the results of the bid package Expenses for preparation of bidding documents and evaluation of construction bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HIỆP HÒA
06/10/2023 14:35
Trường THCS Trường Chinh publishes the plan Repair Truong Chinh Secondary School with 6 bidding package .
26/09/2023 16:18
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Trường Chinh announced the results of the bid package Provide semi -boarding lunch for students at Chinh Secondary School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI - DỊCH VỤ TÂM TUẤN PHÁT
29/08/2025 16:15
Trường THCS Trường Chinh publishes the plan Provide lunch capacity for semi -boarding students at the Secondary School for the 2025 - 2026 school year with 1 bidding package .
29/08/2025 16:08
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Construction of the investor Trường THCS Trường Chinh.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ THIẾT KẾ XÂY DỰNG AN GIA NGUYỄN
21/08/2025 13:54
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Expenses for making bidding documents and evaluating bidding bidding packages for construction package of the investor Trường THCS Trường Chinh.
- Winning bidder: HOANG GIA PHAT TRADING CONSTRUCTION CONSULTING COMPANY LIMITED
04/07/2025 11:27
The Bid solicitor Trường THCS Trường Chinh has posted the request Repair and reform of Chinh Secondary School of the investor Trường THCS Trường Chinh with 5 bidding package.
04/07/2025 11:22
Investor Trường THCS Trường Chinh has posted an investment and development project Repair and reform of Chinh Secondary School.
04/07/2025 11:11
The Bid solicitor TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED has posted the results of the bidding package Procurement of assets and equipment for professional services in 2024 of the investor Trường THCS Trường Chinh.
- Winning bidder: DUC TU IMPORT EXPORT SERVICE TRADING COMPANY LIMITED
27/12/2024 17:25
Bid solicitor TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED has posted Tender Notice Procurement of assets and equipment for professional services in 2024 of the investor Trường THCS Trường Chinh with the form Competitive Offer.
28/11/2024 10:25
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Package No. 01: Consulting for E-HSMT preparation and E-HSDT evaluation of the investor Trường THCS Trường Chinh.
- Winning bidder: TRUONG THINH SERVICE CONSTRUCTION DESIGN COMPANY LIMITED
15/11/2024 11:05
The Bid solicitor Trường THCS Trường Chinh has posted the results of the bidding package Consulting on appraisal of E-HSMT and KQLCNT of the investor Trường THCS Trường Chinh.
- Winning bidder: CÔNG TY TNHH TM DV TƯ VẤN THIẾT KẾ XÂY DỰNG KQ GROUP
15/11/2024 11:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THCS Trường Chinh has posted 5 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Trường Chinh has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THCS Trường Chinh has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THCS Trường Chinh has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects