Data analysis results of DauThau.info software for bid solicitors Trường THPT Anh Sơn 2 as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 7 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 386,769,000 VND, of which the total winning bid value is: 386,769,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường THPT Anh Sơn 2 as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 386,769,000 VND, in which the total winning value is: 386,769,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THPT Anh Sơn 2 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC has posted the results of the bidding package Package 06: The entire cost of construction works of the investor Trường THPT Anh Sơn 2.
- Winning bidder: Công ty cổ phần xây dựng và thương mại Hùng Tâm
19/02/2025 08:49
Bid solicitor CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC has posted Tender Notice Package 06: The entire cost of construction works of the investor Trường THPT Anh Sơn 2 with the form Open bidding.
21/01/2025 14:51
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bidding package No. 04: Consulting on E-HSMT appraisal and contractor selection results for bidding package No. 06 of the investor Trường THPT Anh Sơn 2.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XD PHÚ CƯỜNG
20/01/2025 17:49
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bid package No. 03: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package No. 06 of the investor Trường THPT Anh Sơn 2.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC
20/01/2025 17:47
The Bid solicitor Trường THPT Anh Sơn 2 has posted the request Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district of the investor Trường THPT Anh Sơn 2 with 6 bidding package.
20/01/2025 17:44
Investor Trường THPT Anh Sơn 2 has posted an investment and development project Renovate and upgrade the school's house at Anh Son 2 High School, Anh Son District.
20/01/2025 17:17
Investor Trường THPT Anh Sơn 2 has posted an investment and development project Renovate and upgrade the school's house at Anh Son 2 High School, Anh Son District.
20/01/2025 17:17
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bidding package TV-01: Survey and preparation of Economic - Technical report on construction investment of the investor Trường THPT Anh Sơn 2.
- Winning bidder: DAI NAM CONSTRUCTION & DESIGN CONSULTANT JOINT STOCK COMPANY
09/10/2024 10:48
The Bid solicitor Trường THPT Anh Sơn 2 has posted the request Contractor selection plan (Phase 1) project: Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district of the investor Trường THPT Anh Sơn 2 with 1 bidding package.
09/10/2024 10:45
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THPT Anh Sơn 2 announced the results of the bid package Bidding package No. 04: Consulting on E-HSMT appraisal and contractor selection results for bidding package No. 06 .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XD PHÚ CƯỜNG
20/01/2025 17:49
Trường THPT Anh Sơn 2 announced the results of the bid package Bid package No. 03: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package No. 06 .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC
20/01/2025 17:47
Trường THPT Anh Sơn 2 publishes the plan Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district with 6 bidding package .
20/01/2025 17:44
Trường THPT Anh Sơn 2 announced the results of the bid package Bidding package TV-01: Survey and preparation of Economic - Technical report on construction investment .
- Winning bidder: DAI NAM CONSTRUCTION & DESIGN CONSULTANT JOINT STOCK COMPANY
09/10/2024 10:48
Trường THPT Anh Sơn 2 publishes the plan Contractor selection plan (Phase 1) project: Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district with 1 bidding package .
09/10/2024 10:45
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC has posted the results of the bidding package Package 06: The entire cost of construction works of the investor Trường THPT Anh Sơn 2.
- Winning bidder: Công ty cổ phần xây dựng và thương mại Hùng Tâm
19/02/2025 08:49
Bid solicitor CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC has posted Tender Notice Package 06: The entire cost of construction works of the investor Trường THPT Anh Sơn 2 with the form Open bidding.
21/01/2025 14:51
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bidding package No. 04: Consulting on E-HSMT appraisal and contractor selection results for bidding package No. 06 of the investor Trường THPT Anh Sơn 2.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XD PHÚ CƯỜNG
20/01/2025 17:49
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bid package No. 03: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package No. 06 of the investor Trường THPT Anh Sơn 2.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC
20/01/2025 17:47
The Bid solicitor Trường THPT Anh Sơn 2 has posted the request Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district of the investor Trường THPT Anh Sơn 2 with 6 bidding package.
20/01/2025 17:44
Investor Trường THPT Anh Sơn 2 has posted an investment and development project Renovate and upgrade the school's house at Anh Son 2 High School, Anh Son District.
20/01/2025 17:17
Investor Trường THPT Anh Sơn 2 has posted an investment and development project Renovate and upgrade the school's house at Anh Son 2 High School, Anh Son District.
20/01/2025 17:17
The Bid solicitor Trường THPT Anh Sơn 2 has posted the results of the bidding package Bidding package TV-01: Survey and preparation of Economic - Technical report on construction investment of the investor Trường THPT Anh Sơn 2.
- Winning bidder: DAI NAM CONSTRUCTION & DESIGN CONSULTANT JOINT STOCK COMPANY
09/10/2024 10:48
The Bid solicitor Trường THPT Anh Sơn 2 has posted the request Contractor selection plan (Phase 1) project: Renovating and upgrading the school building of Anh Son 2 High School, Anh Son district of the investor Trường THPT Anh Sơn 2 with 1 bidding package.
09/10/2024 10:45
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THPT Anh Sơn 2 has posted 2 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor Trường THPT Anh Sơn 2 has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THPT Anh Sơn 2 has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THPT Anh Sơn 2 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects