Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT HÒA BÌNH as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 10 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 530,972,000 VND, of which the total winning bid value is: 518,320,500 VND.
- The savings rate is: 2.38%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT HÒA BÌNH as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 530,972,000 VND, in which the total winning value is: 518,320,500 VND.
- The savings rate is: 2.38%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THPT HÒA BÌNH are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 5 contractor selection plans, of which 3 were self-published, and 2 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Project management consultancy .
13/12/2025 17:38
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Consulting, surveying, preparing economic reports .
- Winning bidder: LTD CONSTRUCTION CONSULTING A.C.T
13/12/2025 17:37
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Consultancy on design verification and construction costing .
- Winning bidder: Công ty TNHH tư vấn xây dựng Lạc Việt
13/12/2025 17:36
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package The entire volume of renovation and repair works: Renovation and repair of the Principal buildings, teachers' motels and medical rooms, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG QUANG THẮNG
13/12/2025 17:34
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG DK
13/12/2025 17:31
TRƯỜNG THPT HÒA BÌNH publishes the plan Project: Hoa Binh High School, Category: Renovation and repair of the Principal's building, teacher's motel and medical room, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items with 4 bidding package .
13/12/2025 17:25
TRƯỜNG THPT HÒA BÌNH publishes the plan Planning and investment preparation phase of the project: Hoa Binh High School, Item: Renovating and repairing the Principal buildings, teachers' motels and medical rooms, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items with 2 bidding package .
13/12/2025 17:14
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Shopping for teaching equipment of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ TASLA VIỆT NAM
02/12/2024 14:43
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Construction investment project management consulting of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG B.K
03/10/2024 11:33
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Construction supervision consultancy of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG TÍN PHÁT
03/10/2024 11:31
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Shopping for teaching equipment .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ TASLA VIỆT NAM
02/12/2024 14:43
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Construction investment project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG B.K
03/10/2024 11:33
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG TÍN PHÁT
03/10/2024 11:31
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package The entire volume of repair work at Hoa Binh High School .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG QUANG THẮNG
03/10/2024 11:28
TRƯỜNG THPT HÒA BÌNH publishes the plan Hoa Binh High School; Category: Repairing stairs of subject classroom buildings with 3 bidding package .
03/10/2024 11:24
TRƯỜNG THPT HÒA BÌNH announced the results of the bidding package Shopping for teaching equipment with 2 participating contractors .
23/09/2024 16:21
TRƯỜNG THPT HÒA BÌNH publishes Tender Notice Shopping for teaching equipment in the form Competitive Offer .
14/09/2024 13:48
TRƯỜNG THPT HÒA BÌNH publishes the plan Procurement of minimum teaching equipment for grade 12 according to the new GDPT program of Hoa Binh High School in 2024 with 3 bidding package .
22/08/2024 12:00
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Procurement of minimum grade 11 teaching equipment from Hoa Binh High School .
- Winning bidder: CÔNG TY TNHH THIẾT BỊ HÀ AN
30/08/2023 09:11
TRƯỜNG THPT HÒA BÌNH publishes the plan Procurement of minimum grade 11 teaching equipment from Hoa Binh High School with 1 bidding package .
18/08/2023 10:42
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Project management consultancy .
13/12/2025 17:38
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Consulting, surveying, preparing economic reports .
- Winning bidder: LTD CONSTRUCTION CONSULTING A.C.T
13/12/2025 17:37
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Consultancy on design verification and construction costing .
- Winning bidder: Công ty TNHH tư vấn xây dựng Lạc Việt
13/12/2025 17:36
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package The entire volume of renovation and repair works: Renovation and repair of the Principal buildings, teachers' motels and medical rooms, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG QUANG THẮNG
13/12/2025 17:34
TRƯỜNG THPT HÒA BÌNH announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG DK
13/12/2025 17:31
TRƯỜNG THPT HÒA BÌNH publishes the plan Project: Hoa Binh High School, Category: Renovation and repair of the Principal's building, teacher's motel and medical room, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items with 4 bidding package .
13/12/2025 17:25
TRƯỜNG THPT HÒA BÌNH publishes the plan Planning and investment preparation phase of the project: Hoa Binh High School, Item: Renovating and repairing the Principal buildings, teachers' motels and medical rooms, blocks A, B, C, D, male and female student restrooms, student and teacher parking garages and a number of other ancillary items with 2 bidding package .
13/12/2025 17:14
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Shopping for teaching equipment of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ TASLA VIỆT NAM
02/12/2024 14:43
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Construction investment project management consulting of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG B.K
03/10/2024 11:33
The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted the results of the bidding package Construction supervision consultancy of the investor TRƯỜNG THPT HÒA BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG TÍN PHÁT
03/10/2024 11:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THPT HÒA BÌNH has posted 5 of the contractor selection plan, which contains 10 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THPT HÒA BÌNH has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THPT HÒA BÌNH has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THPT HÒA BÌNH has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THPT HÒA BÌNH has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects