Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors trường thpt kim thành as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 3 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 9 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors trường thpt kim thành as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor trường thpt kim thành are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 4 contractor selection plans, of which 3 were self-published, and 1 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
trường thpt kim thành announced the results of the bid package Package No. 07 .
- Winning bidder: VNSTAR CONSTRUCTION AND TRADING JOINT STOCK COMPANY
20/11/2025 07:59
trường thpt kim thành publishes the plan Renovating and repairing classroom A1; Student garage, fence of Kim Thanh High School with 7 bidding package .
18/11/2025 16:14
The Bid solicitor CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI THÁI DƯƠNG HD has posted the results of the bidding package Package No. 06: Construction of the investor trường thpt kim thành.
- Winning bidder: VNSTAR CONSTRUCTION AND TRADING JOINT STOCK COMPANY
07/12/2023 15:32
Bid solicitor CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI THÁI DƯƠNG HD has posted Tender Notice Tender package No 06: Construction of the investor trường thpt kim thành with the form Competitive Offer.
21/11/2023 21:38
The Bid solicitor trường thpt kim thành has posted the request Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School of the investor trường thpt kim thành with 6 bidding package.
21/11/2023 16:26
The Bid solicitor trường thpt kim thành has posted the request Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School of the investor trường thpt kim thành with 6 bidding package.
21/11/2023 16:21
Investor trường thpt kim thành has posted an investment and development project Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School.
21/11/2023 16:16
The Bid solicitor trường thpt kim thành has posted the request Contractor selection plan for project investment preparation steps: Maintenance and repair of Building A, Building B, Principal Building and Student Toilets of Kim Thanh High School of the investor trường thpt kim thành with 2 bidding package.
21/11/2023 16:06
The Bid solicitor THANG LONG DEVELOPMENT CONSTRUCTION CONSULTING JSC,CO has posted the results of the bidding package Package No. 7: Construction of works of the investor trường thpt kim thành.
- Winning bidder: BACH DANG CONSTRUCTION DESIGN CONSULTING JOINT STOCK COMPANY
27/08/2023 16:34
Bid solicitor THANG LONG DEVELOPMENT CONSTRUCTION CONSULTING JSC,CO has posted Tender Notice Tender package No 7: Construction of works of the investor trường thpt kim thành with the form Competitive Offer.
19/12/2022 23:41
The data sheet has been partially hidden, to see the full information please Login or Register
trường thpt kim thành publishes the plan Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School with 6 bidding package .
21/11/2023 16:26
trường thpt kim thành publishes the plan Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School with 6 bidding package .
21/11/2023 16:21
trường thpt kim thành publishes the plan Contractor selection plan for project investment preparation steps: Maintenance and repair of Building A, Building B, Principal Building and Student Toilets of Kim Thanh High School with 2 bidding package .
21/11/2023 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
trường thpt kim thành announced the results of the bid package Package No. 07 .
- Winning bidder: VNSTAR CONSTRUCTION AND TRADING JOINT STOCK COMPANY
20/11/2025 07:59
trường thpt kim thành publishes the plan Renovating and repairing classroom A1; Student garage, fence of Kim Thanh High School with 7 bidding package .
18/11/2025 16:14
The Bid solicitor CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI THÁI DƯƠNG HD has posted the results of the bidding package Package No. 06: Construction of the investor trường thpt kim thành.
- Winning bidder: VNSTAR CONSTRUCTION AND TRADING JOINT STOCK COMPANY
07/12/2023 15:32
Bid solicitor CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI THÁI DƯƠNG HD has posted Tender Notice Tender package No 06: Construction of the investor trường thpt kim thành with the form Competitive Offer.
21/11/2023 21:38
The Bid solicitor trường thpt kim thành has posted the request Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School of the investor trường thpt kim thành with 6 bidding package.
21/11/2023 16:26
The Bid solicitor trường thpt kim thành has posted the request Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School of the investor trường thpt kim thành with 6 bidding package.
21/11/2023 16:21
Investor trường thpt kim thành has posted an investment and development project Maintenance and repair of building A, building B, rectory and student restrooms at Kim Thanh High School.
21/11/2023 16:16
The Bid solicitor trường thpt kim thành has posted the request Contractor selection plan for project investment preparation steps: Maintenance and repair of Building A, Building B, Principal Building and Student Toilets of Kim Thanh High School of the investor trường thpt kim thành with 2 bidding package.
21/11/2023 16:06
The Bid solicitor THANG LONG DEVELOPMENT CONSTRUCTION CONSULTING JSC,CO has posted the results of the bidding package Package No. 7: Construction of works of the investor trường thpt kim thành.
- Winning bidder: BACH DANG CONSTRUCTION DESIGN CONSULTING JOINT STOCK COMPANY
27/08/2023 16:34
Bid solicitor THANG LONG DEVELOPMENT CONSTRUCTION CONSULTING JSC,CO has posted Tender Notice Tender package No 7: Construction of works of the investor trường thpt kim thành with the form Competitive Offer.
19/12/2022 23:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s trường thpt kim thành has posted 4 of the contractor selection plan, which contains 9 of the bidding package. See full list here
Summary: The Bid solicitor trường thpt kim thành has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity trường thpt kim thành has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects