Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường THPT Minh Hóa as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 11 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 204,149,400 VND, of which the total winning bid value is: 204,149,400 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường THPT Minh Hóa as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 204,149,400 VND, in which the total winning value is: 204,149,400 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THPT Minh Hóa are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted the results of the bidding package Package 01: Construction (Including contingencies) of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
30/05/2025 14:29
The Bid solicitor Trường THPT Minh Hóa has posted the results of the bidding package Construction of repairing and repairing outdoor theater at Minh Hoa High School of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
21/05/2025 16:39
Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted Tender Notice Package 01: Construction (Including contingencies) of the investor Trường THPT Minh Hóa with the form Competitive Offer.
19/05/2025 15:14
The Bid solicitor Trường THPT Minh Hóa has posted the request Repair and upgrade of 02 -storey houses 08 rooms (Zone C), Housing of 02 -storey 10 -storey room - Minh Hoa High School of the investor Trường THPT Minh Hóa with 4 bidding package.
16/05/2025 14:47
Investor Trường THPT Minh Hóa has posted an investment and development project Repair and upgrade of 02 -storey houses 08 rooms (Zone C), Housing of 02 -storey 10 -storey room - Minh Hoa High School.
16/05/2025 14:14
The Bid solicitor Trường THPT Minh Hóa has posted the request The outdoor stage repair works of Minh Hoa High School of the investor Trường THPT Minh Hóa with 1 bidding package.
12/05/2025 21:34
The Bid solicitor Trường THPT Minh Hóa has posted the results of the bidding package Construction and repair of student garages at Minh Hoa High School of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
19/12/2024 09:15
The Bid solicitor Trường THPT Minh Hóa has posted the request Repairing student garages at Minh Hoa High School of the investor Trường THPT Minh Hóa with 1 bidding package.
19/12/2024 09:11
The Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted the results of the bidding package Tender package No 01: Construction and installation of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
22/07/2024 15:31
Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted Tender Notice Tender package No 01: Construction and installation of the investor Trường THPT Minh Hóa with the form Competitive Offer.
19/06/2024 13:51
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THPT Minh Hóa announced the results of the bid package Construction of repairing and repairing outdoor theater at Minh Hoa High School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
21/05/2025 16:39
Trường THPT Minh Hóa publishes the plan Repair and upgrade of 02 -storey houses 08 rooms (Zone C), Housing of 02 -storey 10 -storey room - Minh Hoa High School with 4 bidding package .
16/05/2025 14:47
Trường THPT Minh Hóa publishes the plan The outdoor stage repair works of Minh Hoa High School with 1 bidding package .
12/05/2025 21:34
Trường THPT Minh Hóa announced the results of the bid package Construction and repair of student garages at Minh Hoa High School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
19/12/2024 09:15
Trường THPT Minh Hóa publishes the plan Repairing student garages at Minh Hoa High School with 1 bidding package .
19/12/2024 09:11
Trường THPT Minh Hóa announced the results of the bid package Package No. 05: Evaluation of the Bidding Documents and the CMP .
- Winning bidder: Công ty TNHH Đầu tư tổng hợp Nhật Minh
14/06/2024 16:57
Trường THPT Minh Hóa announced the results of the bid package Package 04: Preparation of Bid Documents and Bid Evaluation .
- Winning bidder: CÔNG TY TNHH ĐINH PHÚC NHÂN
14/06/2024 16:56
Trường THPT Minh Hóa publishes the plan Repairing building block B, 2-story, 10-room classroom of Minh Hoa High School with 5 bidding package .
14/06/2024 16:53
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted the results of the bidding package Package 01: Construction (Including contingencies) of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
30/05/2025 14:29
The Bid solicitor Trường THPT Minh Hóa has posted the results of the bidding package Construction of repairing and repairing outdoor theater at Minh Hoa High School of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
21/05/2025 16:39
Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted Tender Notice Package 01: Construction (Including contingencies) of the investor Trường THPT Minh Hóa with the form Competitive Offer.
19/05/2025 15:14
The Bid solicitor Trường THPT Minh Hóa has posted the request Repair and upgrade of 02 -storey houses 08 rooms (Zone C), Housing of 02 -storey 10 -storey room - Minh Hoa High School of the investor Trường THPT Minh Hóa with 4 bidding package.
16/05/2025 14:47
Investor Trường THPT Minh Hóa has posted an investment and development project Repair and upgrade of 02 -storey houses 08 rooms (Zone C), Housing of 02 -storey 10 -storey room - Minh Hoa High School.
16/05/2025 14:14
The Bid solicitor Trường THPT Minh Hóa has posted the request The outdoor stage repair works of Minh Hoa High School of the investor Trường THPT Minh Hóa with 1 bidding package.
12/05/2025 21:34
The Bid solicitor Trường THPT Minh Hóa has posted the results of the bidding package Construction and repair of student garages at Minh Hoa High School of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
19/12/2024 09:15
The Bid solicitor Trường THPT Minh Hóa has posted the request Repairing student garages at Minh Hoa High School of the investor Trường THPT Minh Hóa with 1 bidding package.
19/12/2024 09:11
The Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted the results of the bidding package Tender package No 01: Construction and installation of the investor Trường THPT Minh Hóa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI TỔNG HỢP TUẤN LÀI
22/07/2024 15:31
Bid solicitor CÔNG TY TNHH ĐINH PHÚC NHÂN has posted Tender Notice Tender package No 01: Construction and installation of the investor Trường THPT Minh Hóa with the form Competitive Offer.
19/06/2024 13:51
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THPT Minh Hóa has posted 4 of the contractor selection plan, which contains 11 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THPT Minh Hóa has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THPT Minh Hóa has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THPT Minh Hóa has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects