Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TIỂU HỌC ĐÔNG SƠN as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 4 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 361,416,000 VND, of which the total winning bid value is: 361,416,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TIỂU HỌC ĐÔNG SƠN as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 361,416,000 VND, in which the total winning value is: 361,416,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 4 contractor selection plans, of which 3 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 02: Consulting on supervision of construction and repair of flooring of Dong Son Primary School .
- Winning bidder: ANH HUNG CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY
16/09/2025 14:30
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 03: Construction of works: Repairing the floor of Dong Son Primary School .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯƠNG SƠN
16/09/2025 14:26
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 01: Advice on management of construction projects for repairing the floor of Dong Son Primary School .
- Winning bidder: Công ty cổ phần đầu tư xây dựng Thái Hoành Sơn
16/09/2025 14:24
TRƯỜNG TIỂU HỌC ĐÔNG SƠN publishes the plan Bidd Selection Plan for Bidding Packages under the Economic and Technical Report of Construction Investment: Repairing the floor of Dong Son Primary School with 3 bidding package .
16/09/2025 14:20
Investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted an investment and development project Repairing the floor of Dong Son Primary School.
16/09/2025 14:14
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: Bao Ha Joint Stock Company
09/05/2025 17:10
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the request Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN with 1 bidding package.
09/05/2025 17:03
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the request Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN with 1 bidding package.
05/05/2025 15:51
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Package No. 02: Consulting on supervision of construction and construction works of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: ANH HUNG CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY
25/04/2025 08:55
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Package No. 03: Construction of works: Repairing the floor of Dong Son Primary School in Dong Son commune, Dong Hung district of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯƠNG SƠN
25/04/2025 08:52
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Repairing corrugated iron roofs, 2 -storey window system; Fence repair .
- Winning bidder: Bao Ha Joint Stock Company
09/05/2025 17:10
TRƯỜNG TIỂU HỌC ĐÔNG SƠN publishes the plan Repairing corrugated iron roofs, 2 -storey window system; Fence repair with 1 bidding package .
09/05/2025 17:03
TRƯỜNG TIỂU HỌC ĐÔNG SƠN publishes the plan Repairing corrugated iron roofs, 2 -storey window system; Fence repair with 1 bidding package .
05/05/2025 15:51
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 02: Consulting on supervision of construction and construction works .
- Winning bidder: ANH HUNG CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY
25/04/2025 08:55
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 03: Construction of works: Repairing the floor of Dong Son Primary School in Dong Son commune, Dong Hung district .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯƠNG SƠN
25/04/2025 08:52
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 01: Advice on management of construction projects for repairing the floor of Dong Son Primary School, Dong Son Primary School, Dong Son Commune, Dong Hung District .
- Winning bidder: Công ty cổ phần đầu tư xây dựng Thái Hoành Sơn
25/04/2025 08:49
TRƯỜNG TIỂU HỌC ĐÔNG SƠN publishes the plan Bidd Selection Plan for Bidding Packages under the Economic and Technical Report of Construction Investment Investment: Repairing the floor of Dong Son Primary School in Dong Son Commune, Dong Hung District with 3 bidding package .
25/04/2025 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 02: Consulting on supervision of construction and repair of flooring of Dong Son Primary School .
- Winning bidder: ANH HUNG CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY
16/09/2025 14:30
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 03: Construction of works: Repairing the floor of Dong Son Primary School .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯƠNG SƠN
16/09/2025 14:26
TRƯỜNG TIỂU HỌC ĐÔNG SƠN announced the results of the bid package Package No. 01: Advice on management of construction projects for repairing the floor of Dong Son Primary School .
- Winning bidder: Công ty cổ phần đầu tư xây dựng Thái Hoành Sơn
16/09/2025 14:24
TRƯỜNG TIỂU HỌC ĐÔNG SƠN publishes the plan Bidd Selection Plan for Bidding Packages under the Economic and Technical Report of Construction Investment: Repairing the floor of Dong Son Primary School with 3 bidding package .
16/09/2025 14:20
Investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted an investment and development project Repairing the floor of Dong Son Primary School.
16/09/2025 14:14
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: Bao Ha Joint Stock Company
09/05/2025 17:10
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the request Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN with 1 bidding package.
09/05/2025 17:03
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the request Repairing corrugated iron roofs, 2 -storey window system; Fence repair of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN with 1 bidding package.
05/05/2025 15:51
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Package No. 02: Consulting on supervision of construction and construction works of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: ANH HUNG CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY
25/04/2025 08:55
The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted the results of the bidding package Package No. 03: Construction of works: Repairing the floor of Dong Son Primary School in Dong Son commune, Dong Hung district of the investor TRƯỜNG TIỂU HỌC ĐÔNG SƠN.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯƠNG SƠN
25/04/2025 08:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted 3 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG TIỂU HỌC ĐÔNG SƠN has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG TIỂU HỌC ĐÔNG SƠN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects