Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu Học Ea Tiêu as follows:
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 5 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 10,263,000 VND, of which the total winning bid value is: 10,263,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu Học Ea Tiêu as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 10,263,000 VND, in which the total winning value is: 10,263,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 0 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the results of the bidding package Cost of appraisal of Bidding Documents, HSYC and Cost of appraisal of LCNT results of the investor Trường Tiểu Học Ea Tiêu.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU MIỀN TRUNG
10/10/2024 21:37
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the results of the bidding package Consulting on preparing Bidding Documents, Proposal Documents and Costs for evaluating Bidding Documents and Proposal Documents of the investor Trường Tiểu Học Ea Tiêu.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CAO NGUYÊN XANH
10/10/2024 21:32
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the request Repairing the fence of the Hluk branch and the roof of the main branch's stage of the investor Trường Tiểu Học Ea Tiêu with 5 bidding package.
30/09/2024 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Tiểu Học Ea Tiêu announced the results of the bid package Cost of appraisal of Bidding Documents, HSYC and Cost of appraisal of LCNT results .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU MIỀN TRUNG
10/10/2024 21:37
Trường Tiểu Học Ea Tiêu announced the results of the bid package Consulting on preparing Bidding Documents, Proposal Documents and Costs for evaluating Bidding Documents and Proposal Documents .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CAO NGUYÊN XANH
10/10/2024 21:32
Trường Tiểu Học Ea Tiêu publishes the plan Repairing the fence of the Hluk branch and the roof of the main branch's stage with 5 bidding package .
30/09/2024 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the results of the bidding package Cost of appraisal of Bidding Documents, HSYC and Cost of appraisal of LCNT results of the investor Trường Tiểu Học Ea Tiêu.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU MIỀN TRUNG
10/10/2024 21:37
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the results of the bidding package Consulting on preparing Bidding Documents, Proposal Documents and Costs for evaluating Bidding Documents and Proposal Documents of the investor Trường Tiểu Học Ea Tiêu.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CAO NGUYÊN XANH
10/10/2024 21:32
The Bid solicitor Trường Tiểu Học Ea Tiêu has posted the request Repairing the fence of the Hluk branch and the roof of the main branch's stage of the investor Trường Tiểu Học Ea Tiêu with 5 bidding package.
30/09/2024 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Tiểu Học Ea Tiêu has posted 1 of the contractor selection plan, which contains 5 of the bidding package. See full list here
Summary: The Bid solicitor Trường Tiểu Học Ea Tiêu has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Tiểu Học Ea Tiêu has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Tiểu Học Ea Tiêu has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Tiểu Học Ea Tiêu is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trường Tiểu Học Ea Tiêu is an investor with 2 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code