Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Kim nỗ as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 437,390,000 VND, of which the total winning bid value is: 397,854,000 VND.
- The savings rate is: 9.04%.
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Kim nỗ as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 437,390,000 VND, in which the total winning value is: 397,854,000 VND.
- The savings rate is: 9.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Tiểu học Kim nỗ are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2024 of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI CÔNG NGHIỆP SÔNG HỒNG
26/11/2024 17:17
The Bid solicitor Trường Tiểu học Kim nỗ has posted the request Procurement of equipment and teaching aids in 2024 of the investor Trường Tiểu học Kim nỗ with 1 bidding package.
14/11/2024 15:24
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2023 for Kim No Primary School of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ 88 HOÀNG GIA
13/12/2023 10:16
Bid solicitor Trường Tiểu học Kim nỗ has posted Tender Notice Procurement of equipment and teaching aids in 2023 for Kim No Primary School of the investor Trường Tiểu học Kim nỗ with the form Shortened competitive offer.
08/11/2023 09:44
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Cost of consulting for preparation of Proposal and evaluation of Proposal of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: HA THANH PRODUCTION INVESTMENT COMPANY LIMITED
03/11/2023 09:59
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package HSYC Verification Consultancy and LCNT Result of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: THIEN TRANG CONSTRUCTION AND ARCHITECTURE JOINT STOCK COMPANY
03/11/2023 09:56
The Bid solicitor Trường Tiểu học Kim nỗ has posted the request Procurement of equipment and teaching aids in 2023 of the investor Trường Tiểu học Kim nỗ with 3 bidding package.
01/11/2023 11:43
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Cost of consulting for preparation of Proposal and evaluation of Proposal of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: QUANG MINH VINH PHUC CONSTRUCTION INVESTMENT COMPANY LIMITED
23/02/2023 15:50
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package HSYC Verification Consultancy and LCNT Result of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: Công ty cổ phần kiến trúc và xây dựng Thiên Trang
23/02/2023 15:48
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2022 of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: P-ONE VIET NAM COMPANY LIMITED
12/12/2022 15:11
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Tiểu học Kim nỗ announced the results of the bid package Procurement of equipment and teaching aids in 2024 .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI CÔNG NGHIỆP SÔNG HỒNG
26/11/2024 17:17
Trường Tiểu học Kim nỗ publishes the plan Procurement of equipment and teaching aids in 2024 with 1 bidding package .
14/11/2024 15:24
Trường Tiểu học Kim nỗ announced the results of the bid package Procurement of equipment and teaching aids in 2023 for Kim No Primary School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ 88 HOÀNG GIA
13/12/2023 10:16
Trường Tiểu học Kim nỗ announced the results of the bidding package Procurement of equipment and teaching aids in 2023 for Kim No Primary School with 2 participating contractors .
11/11/2023 10:08
Trường Tiểu học Kim nỗ publishes Tender Notice Procurement of equipment and teaching aids in 2023 for Kim No Primary School in the form Shortened competitive offer .
08/11/2023 09:44
Trường Tiểu học Kim nỗ announced the results of the bid package Cost of consulting for preparation of Proposal and evaluation of Proposal .
- Winning bidder: HA THANH PRODUCTION INVESTMENT COMPANY LIMITED
03/11/2023 09:59
Trường Tiểu học Kim nỗ announced the results of the bid package HSYC Verification Consultancy and LCNT Result .
- Winning bidder: THIEN TRANG CONSTRUCTION AND ARCHITECTURE JOINT STOCK COMPANY
03/11/2023 09:56
Trường Tiểu học Kim nỗ publishes the plan Procurement of equipment and teaching aids in 2023 with 3 bidding package .
01/11/2023 11:43
Trường Tiểu học Kim nỗ announced the results of the bid package Cost of consulting for preparation of Proposal and evaluation of Proposal .
- Winning bidder: QUANG MINH VINH PHUC CONSTRUCTION INVESTMENT COMPANY LIMITED
23/02/2023 15:50
Trường Tiểu học Kim nỗ announced the results of the bid package HSYC Verification Consultancy and LCNT Result .
- Winning bidder: Công ty cổ phần kiến trúc và xây dựng Thiên Trang
23/02/2023 15:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2024 of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI CÔNG NGHIỆP SÔNG HỒNG
26/11/2024 17:17
The Bid solicitor Trường Tiểu học Kim nỗ has posted the request Procurement of equipment and teaching aids in 2024 of the investor Trường Tiểu học Kim nỗ with 1 bidding package.
14/11/2024 15:24
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2023 for Kim No Primary School of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ 88 HOÀNG GIA
13/12/2023 10:16
Bid solicitor Trường Tiểu học Kim nỗ has posted Tender Notice Procurement of equipment and teaching aids in 2023 for Kim No Primary School of the investor Trường Tiểu học Kim nỗ with the form Shortened competitive offer.
08/11/2023 09:44
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Cost of consulting for preparation of Proposal and evaluation of Proposal of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: HA THANH PRODUCTION INVESTMENT COMPANY LIMITED
03/11/2023 09:59
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package HSYC Verification Consultancy and LCNT Result of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: THIEN TRANG CONSTRUCTION AND ARCHITECTURE JOINT STOCK COMPANY
03/11/2023 09:56
The Bid solicitor Trường Tiểu học Kim nỗ has posted the request Procurement of equipment and teaching aids in 2023 of the investor Trường Tiểu học Kim nỗ with 3 bidding package.
01/11/2023 11:43
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Cost of consulting for preparation of Proposal and evaluation of Proposal of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: QUANG MINH VINH PHUC CONSTRUCTION INVESTMENT COMPANY LIMITED
23/02/2023 15:50
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package HSYC Verification Consultancy and LCNT Result of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: Công ty cổ phần kiến trúc và xây dựng Thiên Trang
23/02/2023 15:48
The Bid solicitor Trường Tiểu học Kim nỗ has posted the results of the bidding package Procurement of equipment and teaching aids in 2022 of the investor Trường Tiểu học Kim nỗ.
- Winning bidder: P-ONE VIET NAM COMPANY LIMITED
12/12/2022 15:11
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Tiểu học Kim nỗ has posted 3 of the contractor selection plan, which contains 7 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường Tiểu học Kim nỗ has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Tiểu học Kim nỗ has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Tiểu học Kim nỗ has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Tiểu học Kim nỗ has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects